AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - DALLAS DISTRICT
Last Update: Friday, June 26, 2015
ITEMS 2270 2055 TO 2274 2001 |
Item No |
Description |
Units |
June 30, 2015 |
Twelve Month Moving |
Usage |
Quantity |
Avg Bid |
Quantity |
Avg Bid |
2270 2055 |
ADJ WATER VALVE COVERS AND VALVE STACK |
EA |
|
|
27.000 |
371.40000 |
1 |
2270 2056 |
ADJ WASTEWATER LATERAL CLEANOUT |
EA |
|
|
28.000 |
477.52000 |
1 |
2270 2057 |
ADJ WASTEWATER MAINLINE CLEANOUT |
EA |
|
|
3.000 |
636.69000 |
1 |
2270 2058 |
ADJ WASTEWATER ACCESS DEVICE |
EA |
|
|
2.000 |
1,061.15000 |
1 |
2270 2059 |
ADJ WASTEWATER MANHOLES |
EA |
|
|
21.000 |
1,591.73000 |
1 |
2270 2060 |
ADJUST WATER MANHOLE |
EA |
|
|
2.000 |
1,591.73000 |
1 |
2270 2061 |
ADJUST FLUSH POINT |
EA |
|
|
1.000 |
848.92000 |
1 |
2270 2062 |
ADJUST TYPE 1 AIR VALVE |
EA |
|
|
1.000 |
1,485.61000 |
1 |
2270 2063 |
INSTALL FIRE HYDRANT EXTENSION |
EA |
|
|
8.000 |
1,061.15000 |
1 |
2270 2064 |
REMOVE FIRE HYDRANT EXTENSION |
EA |
|
|
8.000 |
689.75000 |
1 |
2270 2065 |
ADJ LARGE WATER SERVICE COVER AND FRAM |
EA |
|
|
1.000 |
1,697.84000 |
1 |
2270 2066 |
INVESTIGATION |
EA |
|
|
10.000 |
1,591.73000 |
1 |
2270 2067 |
ALTER WATER VALVE COVERS & STACK |
EA |
|
|
1.000 |
1,485.61000 |
1 |
2270 2068 |
ALTER WASTEWATER MAINLINE CLEANOUT |
EA |
|
|
1.000 |
636.69000 |
1 |
2270 2069 |
ALTER WASTEWATER MANHOLE |
EA |
|
|
1.000 |
1,803.96000 |
1 |
2270 2070 |
ALTER WATER MANHOLE |
EA |
|
|
1.000 |
1,803.96000 |
1 |
2270 2071 |
REL VENT PIPE TY 2 AIR RELEASE VALVE |
EA |
|
|
1.000 |
2,122.30000 |
1 |
2270 2072 |
12" PVC WATER PIPE W / PAVING |
LF |
|
|
154.000 |
79.59000 |
1 |
2270 2073 |
12" GATE VALVE |
EA |
|
|
3.000 |
3,714.02000 |
1 |
2270 2074 |
HWY CROSSING 30" WATER MAIN (BOTOC) |
LF |
|
|
20.000 |
1,061.15000 |
1 |
2270 2075 |
12" WATER MAIN CROSSING (OPEN CUT) |
LF |
|
|
20.000 |
265.29000 |
1 |
2270 2076 |
6080P STD MAINLINE CLEANOUT W / PAVING |
EA |
|
|
3.000 |
742.81000 |
1 |
2271 2001 |
ADJUSTING EXIST FIRE HYDRANT ASSEMBLY |
EA |
|
|
5.000 |
950.00000 |
1 |
2272 2001 |
LED PEDESTRIAN CEILING LUMINAIRE |
EA |
|
|
8.000 |
1,497.89000 |
1 |
2273 2001 |
LED PEDESTRIAN ILLUMINATION |
EA |
|
|
7.000 |
1,957.59000 |
1 |
2274 2001 |
RELOCATE HIGH MAST CCTV POLE ASSEMBLY |
EA |
|
|
1.000 |
10,330.30000 |
1 |