Monthly State Let Construction Report For Corpus Christi District As Of Jan 10, 2018 Page 1 Of 3

Last Update: Wednesday, January 10, 2018
FTP Icon
page 1 | page 2 | page 3

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountySAN PATRICIO
HighwayIH 37
FromNUECES COUNTY LINE
ToBRIDGE (CONTROL BREAK)
CSJ0074-05-097
Proj IDNH 2018(176)
Work TypeMILL,SEAL AND OVERLAY SB LANES ONLY
 
13.7526225552.230.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days151
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0074-05-097
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #10173012
Totals6225552.230.000.000.0

CountyNUECES
HighwayIH 37
FromSOUTHERN MINERALS ROAD
ToN CLARKWOOD
CSJ0074-06-221
Proj IDNH 2018(335)
Work TypeMILL,UNDERSEAL,OVERLAY AND NOVACHIP
 
2.5464615768.330.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days85
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
BAY LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0074-06-221
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #12173025
Totals4615768.330.000.000.0

CountyNUECES
HighwayIH 37
FromSH 358
ToSOUTHERN MINERALS
CSJ0074-06-226
Proj IDNH 1602(215)
Work TypeMILL, SEAL AND OVERALY
 
2.2006667563.575055529.9675.8
Work Order12-06-16
Work Began04-18-17
Work Completed
Time Computed09-01-16
Contract Working Days100
Addl Days Granted36
Working Days Charged129
Percent Time Used94
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0074-06-226
CHEROKEE SERVICES (0.57)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (2.03)
HAAS-ANDERSON CONSTRUCTION, LTD. (1.79)
HIGHWAY BARRICADES AND SERVICES, LLC (1.07)
N-LINE TRAFFIC MAINTENANCE, L.P. (2.22)
S.A. CONCEPTS CONSTRUCTION (6.95)
SOIL-TECH, INC. (0.08)
THE LEVY COMPANY, L.P. (2.02)
WEBBER BARRIER SERVICES, LLC. (0.74)
Contract #07163023
Totals6667563.57168985.305055529.9675.8

CountyNUECES
HighwayIH 37
From1.381 MI W OF US 181
To1.224 MI W OF SH 358
CSJ0074-06-228
Proj IDSTP 1702(337)HES
Work TypeIMPROVE TRAFFIC SIGNAL, INTER. SIG.
 
4.100287845.1043600.0015.1
CountyNUECES
HighwayIH 37
From0.203 MI E OF FM 3386
To0.216 MI W OF FM 24
CSJ0074-06-229
Proj IDSTP 1702(338)HES
Work TypeIMPROVE TRAFFIC SIGNALS, INTER.SIGN
 
1.060208601.50127281.8061.0
Work Order07-11-17
Work Began10-26-17
Work Completed
Time Computed09-10-17
Contract Working Days129
Addl Days Granted0
Working Days Charged20
Percent Time Used15
Contractor(s)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0074-06-228
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #06173236
Totals496446.6099691.80170881.8034.4

CountyJIM WELLS
HighwaySH 44
From1.4 MI W OF FM 2507
ToINTERS FM 1554 (CONTROL BREAK)
CSJ0086-11-048
Proj IDSTP 1702(096)HES
Work TypeIMPROVE TRAFFIC SIGNALS
 
3.33941697.5547776.8399.9
CountyJIM WELLS
HighwaySH 44
FromINTERS. FM 1554 (CONTROL BREAK)
To1.1 M E OF FM 1931
CSJ0087-01-106
Proj IDSTP 1702(097)HES
Work TypeIMPROVE TRAFFIC SIGNALS
 
3.974135641.40130383.9096.1
CountyJIM WELLS
HighwayBU 281R
FromO.2 MI N OF FM 3376
To.2 MI N OF FM 1352 (CONTROL BREAK)
CSJ0254-03-078
Proj IDSTP 1702(104)HES
Work TypeIMPROVE TRAFFIC SIGNALS
 
3.43746062.7540944.7588.8
CountyJIM WELLS
HighwayBU 281R
From.2 MI N OF FM 1352 (CONTROL BREAK)
ToO.2 MI S OF FM 1352
CSJ0255-01-080
Proj IDSTP 1702(105)HES
Work TypeIMPROVE TRAFFIC SIGNALS
 
0.90035587.1527440.6577.1
Work Order09-14-17
Work Began10-16-17
Work Completed
Time Computed10-14-17
Contract Working Days66
Addl Days Granted0
Working Days Charged32
Percent Time Used48
Contractor(s)
TRAF-TEX, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0086-11-048
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #05173031
Totals258988.8548186.23246546.1395.1

CountyJIM WELLS
HighwayFM 665
From15OOFT W. OF FM 1931
ToINTERSECTION OF FM 1931
CSJ0086-19-031
Proj IDSTP 2016(960)
Work TypeWIDEN EXISTING BRIDGE
 
0.290642139.91756902.96100.0
Work Order06-08-16
Work Began09-19-16
Work Completed11-30-17
Time Computed07-08-16
Contract Working Days124
Addl Days Granted42
Working Days Charged164
Percent Time Used98
Contractor(s)
CRG
SUBCONTRACTOR(S) FOR CCSJ: 0086-19-031
HIGHWAY BARRICADES AND SERVICES, LLC (3.00)
FUQUAY, INC. (1.91)
W. W. FOUNDATION DRILLING, LTD. (10.83)
GUERRA CONSTRUCTION COMPANY (2.79)
DUSTROL, INC. (1.66)
LONE STAR PAVING (7.44)
Contract #04163221
Totals642139.914508.69756902.96100.0

CountySAN PATRICIO
HighwayUS 181
From0.14 MI W OF CR 3667_(CR 81)
To1.2 M E OF CR 3667_(CR 81)
CSJ0101-04-115
Proj IDNH 2018(187)
Work TypeCONSTRUCT/EXTEND TURN LANES
 
1.335933485.520.000.0
Work Order11-15-17
Work Began00-00-00
Work Completed
Time Computed12-15-17
Contract Working Days68
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
BAY LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0101-04-115
SOIL-TECH, INC. (1.43)
HIGHWAY BARRICADES AND SERVICES, LLC (3.61)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (14.49)
Contract #10173204
Totals933485.520.000.000.0

CountyNUECES
HighwaySH 44
FromW. END OF CLARKWOOD RELIEF ROUTE
ToWEST OF FM 3386
CSJ0102-01-106
Proj IDNH 2013(751)
Work TypeGRADE,BASE,S URF,STRS
 
1.14616390152.9618186507.3199.9
Work Order09-11-15
Work Began01-04-16
Work Completed
Time Computed09-01-15
Contract Working Days356
Addl Days Granted93
Working Days Charged410
Percent Time Used91
Contractor(s)
BAY LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0102-01-106
HIGHWAY BARRICADES AND SERVICES, LLC (0.59)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (1.07)
WEBBER BARRIER SERVICES, LLC. (0.89)
SCOTT DERR PAINTING CO, LLC (0.20)
K.L. DURHAM CONSTRUCTION, LLC (0.41)
STAR OPERATIONS, INC. (2.14)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.97)
D & S TEXAS ICON CONSTRUCTION, LLC. (0.62)
CABCOS CONTRACTORS LLC (2.53)
MCL CONTRACTING, LLC (0.05)
D & C CONCRETE CUTTING, INC. (0.08)
GUERRA UNDERGROUND, LLC (0.52)
NATIONAL POWER RODDING GROUP (0.07)
V.C. HUFF, L.L.C. (1.58)
WEST TX RUMBLE STRIP (0.02)
Contract #07153007
Totals16390152.9641313.0618186507.3199.9

CountyNUECES
HighwayUS 77
FromFM 892
ToS OF CR 28
CSJ0102-02-096
Proj IDC 102-2-96
Work TypeGRADE,BASE,SURF,STRS
 
4.03938721708.4335240809.8091.0
Work Order12-17-13
Work Began01-04-16
Work Completed
Time Computed09-01-13
Contract Working Days527
Addl Days Granted0
Working Days Charged439
Percent Time Used83
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
BAY LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0102-02-096
IOC COMPANY LLC (5.78)
PANTHER CREEK TRANSPORTATION, INC. (3.94)
K.L. DURHAM CONSTRUCTION, LLC (0.25)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.45)
HIGHWAY BARRICADES AND SERVICES, LLC (0.71)
LAYFIELD CONSTRUCTION, INC (0.47)
ACTION CONSTRUCTORS (3.28)
SHINN & GREGORY, INC. (0.85)
MICA CORPORATION (1.75)
MCL CONTRACTING, LLC (0.19)
SOIL-TECH, INC. (0.85)
WEBBER BARRIER SERVICES, LLC. (1.05)
CABCOS CONTRACTORS LLC (1.01)
Contract #07133202
Totals38721708.43773229.0835240809.8091.0

CountyKLEBERG
HighwayUS 77
FromSH 285
ToEND OF FIVE LANE SECTION
CSJ0102-04-104
Proj IDNH 2017(156)
Work TypeMILL AND OVERLAY
 
1.4901551557.31621274.3941.9
CountyKLEBERG
HighwayUS 77
FromSH 285
ToKENEDY COUNTY LINE
CSJ0327-01-032
Proj IDNH 2017(156)
Work TypeMILL AND OVERLAY
 
2.0401765567.34939173.1853.1
Work Order01-17-17
Work Began09-18-17
Work Completed
Time Computed02-16-17
Contract Working Days60
Addl Days Granted0
Working Days Charged90
Percent Time Used150
Contractor(s)
FOREMOST PAVING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0102-04-104
HIGHWAY BARRICADES AND SERVICES, LLC (0.23)
PRIMATE CONSTRUCTION, INC. (0.72)
ROADSAFE TRAFFIC SYSTEMS, INC. (1.53)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (3.21)
WEST TEXAS RUMBLE STRIP (0.12)
Contract #10163216
Totals3317124.65216485.781560447.5747.9

CountyARANSAS
HighwayBS 35-L
From0.32 MI E OF FM 2165
ToFM 1069
CSJ0180-05-064
Proj IDSTP 2017(631)HES
Work TypeIMPROVE TRAFFIC SIGNAL, INTER. SIG
 
0.532265591.5520800.007.8
CountyLIVE OAK
HighwayUS 281
From.5 MI N OF BU 59
To.5 MI S OF US 59
CSJ0254-01-143
Proj IDSTP 2017(632)HES
Work TypeIMPROVE TRAFFIC SIGNAL, INTER. SIGN
 
1.504165028.35175350.7099.9
Work Order03-08-17
Work Began07-14-17
Work Completed
Time Computed04-07-17
Contract Working Days154
Addl Days Granted0
Working Days Charged36
Percent Time Used23
Contractor(s)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0180-05-064
LONE STAR TOWER (1.06)
TRIPLE H FIELD SERVICES, LLC (24.41)
Contract #02173209
Totals430619.902800.00196150.7045.5

CountySAN PATRICIO
HighwaySL 90
FromON LP 90 (HARRISON RD) FROM BS35-L
ToGOODNIGHT ST.
CSJ0180-09-018
Proj IDSTP 1602(610)
Work TypeLANDSCAPE WORK
 
0.425205057.00184294.5889.8
Work Order04-19-17
Work Began11-06-17
Work Completed
Time Computed05-22-17
Contract Working Days60
Addl Days Granted0
Working Days Charged36
Percent Time Used60
Contractor(s)
TIGHT LINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0180-09-018
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #03173012
Totals205057.0071239.70184294.5889.8

CountySAN PATRICIO
HighwaySH 361
FromSH 35
ToEND OF DIVIDED SECTION
CSJ0180-10-077
Proj IDSTP 2017(963)
Work TypeSEAL AND OVERLAY
 
4.4523335329.150.000.0
Work Order07-31-17
Work Began00-00-00
Work Completed
Time Computed08-31-17
Contract Working Days82
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
HAAS-ANDERSON CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0180-10-077
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #04173025
Totals3335329.150.000.000.0

CountyLIVE OAK
HighwayUS 281
From5.3 MI S OF US 59
ToJIM WELLS COUNTY LINE
CSJ0254-02-042
Proj IDNH 2018(445)
Work TypeBASE,SURF
 
13.3378925015.090.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days134
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0254-02-042
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01183206
Totals8925015.090.000.000.0

CountyJIM WELLS
HighwayUS 281
From0.8 MI S OF FM 1554
ToCONTROL BREAK (.1 MI SO OF CR468)
CSJ0254-07-009
Proj IDNH 2017(816)
Work TypeGRADE,SURF
 
3.9654711384.924120162.1387.4
CountyJIM WELLS
HighwayUS 281
FromAPPROX .1 MI S OF CR 468
ToFM 2508
CSJ0255-01-083
Proj IDNH 2017(816)
Work TypeGRADE,SURF
 
1.9411722420.781049874.5460.9
Work Order04-24-17
Work Began06-19-17
Work Completed
Time Computed05-01-17
Contract Working Days160
Addl Days Granted10
Working Days Charged92
Percent Time Used54
Contractor(s)
ANDERSON COLUMBIA CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0254-07-009
SOIL-TECH, INC. (0.21)
D&S TEXAS ICON CONSTRUCTION (0.49)
HIGHWAY BARRICADES AND SERVICES, LLC (1.72)
WEST TX RUMBLE STRIP (0.15)
FLASHER EQUIPMENT COMPANY (1.75)
PRIMATE CONSTRUCTION, INC. (0.12)
CLARK CONSTRUCTION OF TEXAS, INC. (5.13)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (0.67)
Contract #03173225
Totals6433805.701412579.535170036.6780.3

CountyKARNES
HighwaySH 72
FromW. MAIN ST.
ToWILBERN ST.
CSJ0270-03-074
Proj IDSTP 2017(305)
Work TypeGRADE,BASE, SURF, RESTRIPE ROADWAY
 
0.7082144915.351124775.7952.4
CountyKARNES
HighwayFM 81
FromFM 2773
ToFM 885
CSJ0691-01-034
Proj IDSTP 2017(305)
Work TypeGRADE,BASE, SURF, RESTRIPE ROADWAY
 
1.1523041471.69624119.5220.5
Work Order02-22-17
Work Began07-10-17
Work Completed
Time Computed03-01-17
Contract Working Days232
Addl Days Granted48
Working Days Charged88
Percent Time Used31
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0270-03-074
FLASHER EQUIPMENT COMPANY (1.88)
HIGHWAY BARRICADES AND SERVICES, LLC (1.41)
THE LEVY COMPANY, L.P. (0.43)
LONE STAR EROSION CONTROL (1.30)
DELGADOS CONSTRUCTION, DBA ERNESTO A. DELGADO (7.59)
Contract #01173022
Totals5186387.04237743.191748895.3133.7

CountyNUECES
HighwaySH 286
FromSH 357
To1 MI S OF FM 43
CSJ0326-01-052
Proj IDNH 2013(795)
Work TypeGRADE,BASE,SURF,STRS
 
2.75545818725.5246426432.5099.9
Work Order09-05-13
Work Began03-05-14
Work Completed
Time Computed08-01-13
Contract Working Days687
Addl Days Granted96
Working Days Charged778
Percent Time Used99
Contractor(s)
HAAS-ANDERSON CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0326-01-052
LARGE & SONS_FOUNDATION DRILLING,INC. (0.20)
MURRAY CONSTRUCTION (0.20)
SOIL-TECH, INC. (0.35)
MASTERPIECE GRINDING & GROOVING, LLC (0.07)
WEBBER-BALKE FOUNDATION COMPANY, INC. (1.72)
TEXAS BOMANITE (0.21)
TERRY L. ELLIS BACKHOE (0.05)
TROUT TRUCKING_COMPANY INC. (2.72)
HIGHWAY BARRICADES AND SERVICES, LLC (0.70)
JHABORES CONSTRUCTION CO, INC. (2.92)
CROSSROADS MILLING, LLC (0.24)
CABCOS CONTRACTORS LLC (5.62)
AARON CONCRETE CONTRACTORS, L.P. (1.86)
STAR OPERATIONS, INC. (2.06)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (0.65)
MCL CONTRACTING, LLC (0.49)
HAYWARD BAKER, INC. (0.15)
PERFORMANCE EQUIPMENT SERVICE (0.30)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.09)
Contract #06133001
Totals45818725.5285407.6846426432.5099.9

CountyKARNES
HighwaySH 80
FromSH 119
ToWILSON COUNTY LINE
CSJ0348-03-027
Proj IDSTP 1602(457)
Work TypeREHAB ROADWAY
 
29.9654785955.374570482.2495.4
Work Order10-12-16
Work Began12-06-16
Work Completed
Time Computed11-12-16
Contract Working Days146
Addl Days Granted4
Working Days Charged150
Percent Time Used100
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0348-03-027
D&S TEXAS ICON CONSTRUCTION (1.91)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (0.75)
EGGEMEYER LAND CLEARING, LLC (0.48)
FLASHER EQUIPMENT COMPANY (0.44)
MPB, INC. (0.43)
MURRAY CONSTRUCTION (0.26)
PAVEMENT MARKINGS INC. (5.48)
WEST TEXAS RUMBLE STRIP (0.35)
RELMCO, INC. (9.73)
Contract #08163245
Totals4785955.37148241.534570482.2495.4

CountyLIVE OAK
HighwayFM 99
FromIH 37
ToALT US 281
CSJ0348-11-015
Proj IDSTP 1702(339)
Work TypeREHAB AND WIDEN
 
2.4002680558.961209223.7245.1
Work Order07-20-17
Work Began08-10-17
Work Completed
Time Computed08-01-17
Contract Working Days102
Addl Days Granted0
Working Days Charged76
Percent Time Used74
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0348-11-015
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (1.79)
DIAMOND SURFACE, INC. (0.37)
FLASHER EQUIPMENT COMPANY (0.42)
HIGHWAY BARRICADES AND SERVICES, LLC (0.96)
THE LEVY COMPANY, L.P. (0.33)
ROADWAY SPECIALTIES, INC. (1.00)
Contract #06173219
Totals2680558.96356205.471209223.7245.1

CountyKARNES
HighwaySH 123
FromSH 80
ToWILSON COUNTY LINE
CSJ0366-06-042
Proj IDNH 2017(043)
Work TypeREHAB ROADWAY
 
12.59519912126.657274171.9636.5
Work Order11-01-16
Work Began11-28-16
Work Completed
Time Computed12-01-16
Contract Working Days400
Addl Days Granted48
Working Days Charged207
Percent Time Used46
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0366-06-042
D.I.J. CONSTRUCTION, INC (1.71)
FLASHER EQUIPMENT COMPANY (0.07)
EGGEMEYER LAND CLEARING, LLC (0.70)
IVY ROSALVA CRUZ DBA IVY"S TRUCKING (1.07)
THE LEVY COMPANY, L.P. (0.05)
ROADWAY SPECIALTIES, INC. (1.93)
Contract #09163205
Totals19912126.65616677.177274171.9636.5