Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 4.000 4,850.00000 27.000 31,320.70296 27
500 2006 MOBILIZATION EA     9.000 11,111.11111 2
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.000 2,466.66667 61.000 4,612.80590 28
502 2026 LANE CLOSURE (TY I) EA     45.000 781.33333 2
502 2027 SHOULDER CLOSURE (TY II) EA     45.000 748.00000 2
502 2055 OFF - DUTY POLICE OFFICERS HR     582.000 64.55928 2
506 2024 BACKHOE WORK (EROSION & SEDM CONT) HR     48.000 25.00000 1
530 2005 INTERSECTIONS (ACP) SY     1,821.000 36.56000 1
530 2009 DRIVEWAYS (SURF TREAT) EA     57.000 20.00000 1
530 2010 DRIVEWAYS (CONC) SY     136.000 68.54000 1
530 2011 DRIVEWAYS (ACP) SY     617.000 33.51000 1
530 2012 DRIVEWAYS (SURF TREAT) SY     2,088.000 7.62000 1
530 2017 TURNOUTS (ACP) SY     230.000 7.83000 1
530 2021 INTRSCT, DRVWAYS, & TURNOUT (SURF TREAT SY     3,235.000 34.97927 2
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     262,950.000 0.18000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF     800.000 89.37500 2
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     8.000 2,195.78500 2
544 2005 GDRAIL END TRT (INST) (WOOD POST) (TY II) EA     4.000 3,807.74000 1
544 2006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA     4.000 2,500.00000 1
560 2006 MAILBOX INSTALL - S (RR - POST) TY 4 FND - T EA     4.000 685.40000 1
560 2007 MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T EA     2.000 200.00000 1
560 2008 MAILBOX INSTALL - M (TWW - POST) TY 4 FND - T EA     2.000 380.77000 1
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA     24.000 182.50000 2