1122 2001 - 1122 2057
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1122 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     1,160.000 17.00000 1
1122 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     12.000 227.07000 1
1122 2005 ROCK FILTER DAMS (INSTALL) (TY 1) CY     21.500 170.00000 1
1122 2006 ROCK FILTER DAMS (INSTALL) (TY 2) CY     100.000 172.00000 1
1122 2007 ROCK FILTER DAMS (INSTALL) (TY 3) CY     80.000 160.00000 1
1122 2009 ROCK FILTER DAMS (REMOVE) LF     1,160.000 6.00000 1
1122 2010 ROCK FILTER DAMS (REMOVE) CY     213.500 50.76375 3
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     1,326.000 24.07765 9
1122 2017 CONSTRUCTION EXITS (INSTALL) (TY 2) SY     78.000 24.00000 1
1122 2019 CONSTRUCTION EXITS (REMOVE) SY     1,404.000 10.12222 10
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF     14,249.000 3.79239 5
1122 2048 BIOGRD EROSN CONT LOGS (12" DIA) INSTAL LF     12,808.000 4.96911 13
1122 2049 BIOGRD EROSN CONT LOGS (18" DIA) INSTAL LF     14,187.000 4.94945 14
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF     25,159.000 1.17680 13
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF     14,153.000 .81435 3