AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - CHILDRESS DISTRICT

Last Update: Monday, March 31, 2014
ITEMS 1122 2001 TO 1122 2057
Items Items Bid Code Range
0100 - 0169
0216 - 0260
0310 - 0360
0401 - 0496
0500 - 0560
0610 - 0678
0760 - 0760
1122 - 1122
2197 - 2198
3267 - 3268
4647 - 4648
5369 - 5369
8251 - 8251
1122 2001 - 1122 2057
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1122 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     920.000 24.96196 3
1122 2009 ROCK FILTER DAMS (REMOVE) LF     850.000 6.60000 2
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 500.000 30.00000 2,608.000 22.24387 7
1122 2019 CONSTRUCTION EXITS (REMOVE) SY 500.000 2.65000 2,608.000 6.55215 7
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF     300.000 6.00000 1
1122 2049 BIOGRD EROSN CONT LOGS (18" DIA) INSTAL LF 200.000 9.50000 10,220.000 6.27740 11
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF 200.000 1.25000 5,320.000 1.04737 5
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF     300.000 1.50000 1