MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 23 AS OF DEC 11, 2008 PAGE 66 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ BROWN LUCAS STREET | 0.817 | 4,234,779.93| 133,344.60| 1,250,277.96| 29.5| US 67 NEAR FM 2525 | | | | | | 0054-07-064 | | | | | | NH 2008(434) RECONSTRUCT OUTSIDE LANES, ACP OVER | | | | | | | | | | | | WORK ORDER- 05-05-08 WORK BEGAN- 09-25-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-02-08 | | | | | | CONTRACT WORKING DAYS- 239 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 65 PERCENT TIME USED- 27 | | | | | | | | | | | | LINDSEY CONTRACTORS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0054-07-064 | | | | | | J & M CONTRACTING, COMPANY | |SUB %: 19.14 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 3.31 | | | | N-LINE TRAFFIC MAINTENANCE, L.P. | |SUB %: 0.73 | | | | NORTH TEXAS BOMANITE, INC. | |SUB %: 1.24 | | | | TOTAL HIGHWAY MAINTENANCE, LLC | |SUB %: 0.50 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 0.54 | | | | WILEY CONSTRUCTION COMPANY, INC. | |SUB %: 13.48 | | | | | | | | | | CONTRACT 03083006 | TOTALS | 4,234,779.93| 133,344.60| 1,250,277.96| 29.5| ************************************************************************************************************************************ BROWN VARIOUS_LOCATIONS DISTRICTWIDE | 0.100 | 1,224,576.00| 100.00| 100.00| 0.0| VA . | | | | | | 0923-00-051 | | | | | | STP 2008(820) CONSTRUCT CURB RAMPS | | | | | | | | | | | | WORK ORDER- 09-09-08 WORK BEGAN- 10-28-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-25-08 | | | | | | CONTRACT WORKING DAYS- 216 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 40 PERCENT TIME USED- 18 | | | | | | | | | | | | INTERSTATE IMPROVEMENT, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0923-00-051 | | | | | | HIGHWAY TECHNOLOGIES | |SUB %: 1.02 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 0.53 | | | | | | | | | | CONTRACT 08083019 | TOTALS | 1,224,576.00| 100.00| 100.00| 0.0| ************************************************************************************************************************************ COLEMAN CALLAHAN C/L | 16.800 | 5,889,808.27| 344,760.13| 1,189,239.01| 20.1| US 283 NEAR SH 206 | | | | | | 0437-05-014 | | | | | | STP 2008(596) ADD SHOULDERS, BASE OVERLAY, & SURF | | | | | | | | | | | | WORK ORDER- 07-02-08 WORK BEGAN- 07-07-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-07-08 | | | | | | CONTRACT WORKING DAYS- 360 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 100 PERCENT TIME USED- 27 | | | | | | | | | | | | STEPHENS MARTIN PAVING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0437-05-014 | | | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.44 | | | | J.V. CONCRETE CONSTRUCTION | |SUB %: 16.26 | | | | CONTRACTORS SERVICE COMPANY | |SUB %: 1.22 | | | | BAKER BRIDGE, L.P. | |SUB %: 6.20 | | | | GIBSON & ASSOCIATES, INC. | |SUB %: 2.18 | | | | DUSTROL, INC. | |SUB %: 0.10 | | | | HJC FARMS, INC. | |SUB %: 1.84 | | | | NITE LITE, INC. | |SUB %: 2.04 | | | | TEXAS MULCHERS ENVIRONMENTAL SERVICES | |SUB %: 0.38 | | | | | | | | | | CONTRACT 05083202 | TOTALS | 5,889,808.27| 344,760.13| 1,189,239.01| 20.1| ************************************************************************************************************************************ COLEMAN ON CR 140 AT JIM NED CREEK | 0.200 | 843,363.85| 230,276.86| 581,790.95| 68.9| CR . | | | | | | 0923-08-016 | | | | | | BR 96(312) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 07-11-08 WORK BEGAN- 08-12-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-27-08 | | | | | | CONTRACT WORKING DAYS- 142 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 75 PERCENT TIME USED- 52 | | | | | | | | | | | | VILLA & SONS CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0923-08-016 | | | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 8.68 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.47 | | | | S & S BRIDGE PAINTING | |SUB %: 0.30 | | | | | | | | | | CONTRACT 06083219 | TOTALS | 843,363.85| 230,276.86| 581,790.95| 68.9| ************************************************************************************************************************************ COLEMAN ETC TAYLOR C/L | 189.942 | 5,166,363.80| 0.00| 0.00| 0.0| US 84 ETC NEAR ROUGH CREEK | | | | | | 0054-02-030 | | | | | | CPM 54-2-30 SEAL COAT | | | | | | | | | | | | WORK ORDER- 12-09-08 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 12-25-08 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 76 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BRANNAN PAVING CO., LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0054-02-030 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11083204 | TOTALS | 5,166,363.80| 0.00| 0.00| 0.0| ************************************************************************************************************************************ COMANCHE ELM STREET NEAR WCL OF COMANCHE, WE | 1.177 | 14,808,428.80| 690,432.11| 8,262,076.38| 55.7| US 67 0.5 MILES WEST OF INDIAN CREEK | | | | | | 0079-02-035 | | | | | | NH 2001(492) CONSTRUCT RR OVERPASS AND APPROACHE | | | | | | | | | | | | WORK ORDER- 08-30-07 WORK BEGAN- 01-10-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-30-07 | | | | | | CONTRACT WORKING DAYS- 423 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 202 PERCENT TIME USED- 47 | | | | | | | | | | | | PRATER EQUIPMENT CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0079-02-035 | | | | | | CEN-TEX SEEDING, INC. | |SUB %: 0.81 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 0.47 | | | | ELLIS-MCGINNIS CONSTRUCTION CO. | |SUB %: 33.35 | | | | KARMY CONSTRUCTION INC | |SUB %: 5.37 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 2.23 | | | | W.W. WEBBER INC. | |SUB %: 1.32 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.04 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.32 | | | | ATS DRILLING, L.P. | |SUB %: 1.18 | | | | GUAJARDO STEEL | |SUB %: 0.29 | | | | MIKE BARKER CONSTRUCTION, INC. | |SUB %: 0.58 | | | | | | | | | | CONTRACT 07073004 | TOTALS | 14,808,428.80| 690,432.11| 8,262,076.38| 55.7| ************************************************************************************************************************************ COMANCHE 0.65 MI S OF FM 589, S | 7.848 | 2,819,766.70| 92,406.87| 2,103,714.64| 74.6| FM 1689 SH 36 | | | | | | 1033-04-017 | | | | | | STP 2007(747) BASE OVERLAY,SFTY TRT STRS,SURF TRT | | | | | | | | | | | | WORK ORDER- 10-05-07 WORK BEGAN- 10-31-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-21-07 | | | | | | CONTRACT WORKING DAYS- 220 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 218 PERCENT TIME USED- 99 | | | | | | | | | | | | PRATER EQUIPMENT CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1033-04-017 | | | | | | CEN-TEX SEEDING, INC. | |SUB %: 3.04 | | | | JONA CONTRACTING, INC. | |SUB %: 1.53 | | | | MIKE BARKER CONSTRUCTION, INC. | |SUB %: 4.68 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 1.75 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 0.65 | | | | | | | | | | CONTRACT 08073221 | TOTALS | 2,819,766.70| 92,406.87| 2,103,714.64| 74.6| ************************************************************************************************************************************ EASTLAND ETC ON CR 141 AT BR S FK LEON RIVER | 0.501 | 1,048,439.45| 87,316.63| 422,996.02| 40.3| CR . | | | | | | 0923-09-045 | | | | | | BR 2008(400) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 07-30-08 WORK BEGAN- 08-21-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-15-08 | | | | | | CONTRACT WORKING DAYS- 165 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 62 PERCENT TIME USED- 37 | | | | | | | | | | | | AJAX EQUIPMENT COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0923-09-045 | | | | | | FOUNDATION DRILLERS, INC. | |SUB %: 7.30 | | | | DIAMONDBACK STEEL CO., INC. | |SUB %: 7.27 | | | | | | | | | | CONTRACT 06083020 | TOTALS | 1,048,439.45| 87,316.63| 422,996.02| 40.3| ************************************************************************************************************************************ EASTLAND FM 2461 | 5.116 | 5,409,346.36| 189,134.70| 4,714,060.66| 87.1| FM 2214 0.5 MI E OF FM 571 | | | | | | 1697-02-018 | | | | | | STP 2006(762) GRADING, STRS, FLEX BASE AND SURFAC | | | | | | | | | | | | WORK ORDER- 10-31-06 WORK BEGAN- 01-08-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 12-31-06 | | | | | | CONTRACT WORKING DAYS- 357 ADDL DAYS GRANTED- 47 | | | | | | WORKING DAYS CHARGED- 353 PERCENT TIME USED- 87 | | | | | | | | | | | | JAY MILLS CONTRACTING, INCORPORATED | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1697-02-018 | | | | | | CEN-TEX SEEDING, INC. | |SUB %: 2.38 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 2.47 | | | | NORTHEASTERN PAVERS, INC. | |SUB %: 11.38 | | | | REBAR SERVICE & SUPPLY CO. | |SUB %: 1.22 | | | | SAN_ANN BARRICADES,INC. | |SUB %: 1.01 | | | | RICOCHET FUEL DISTRIBUTORS, INC. | |SUB %: 0.85 | | | | ELLIS-MCGINNIS CONSTRUCTION CO. | |SUB %: 19.10 | | | | ATS DRILLING, L.P. | |SUB %: 1.08 | | | | FORTSON CONTRACTING, INC. | |SUB %: 1.68 | | | | | | | | | | CONTRACT 08063010 | TOTALS | 5,409,346.36| 189,134.70| 4,714,060.66| 87.1| ************************************************************************************************************************************ EASTLAND ON IH 20 AT SH 16, SH 206, US 183, | 0.200 | 1,334,366.55| 0.00| 1,297,884.55| 98.1| VA AND AT SH 6 | | | | | | 0923-09-046 | | | | | | STP 2007(791) SAFETY LIGHTING | | | | | | | | | | | | WORK ORDER- 09-11-07 WORK BEGAN- 03-24-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 133 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | WILLIS ELECTRIC CO., LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0923-09-046 | | | | | | CONTRACTORS SERVICE COMPANY | |SUB %: 1.47 | | | | ODUM SERVICES, L.P. | |SUB %: 0.24 | | | | BAKER BRIDGE, L.P. | |SUB %: 3.55 | | | | MICA CORPORATION | |SUB %: 22.27 | | | | RAYDON, INC. | |SUB %: 3.39 | | | | | | | | | | CONTRACT 08073213 | TOTALS | 1,334,366.55| 0.00| 1,297,884.55| 98.1| ************************************************************************************************************************************ EASTLAND ON SADOSA ST FROM SEAMAN ST (SH 6) | 0.806 | 268,987.80| 0.00| 0.00| 0.0| CS COLLEGE ST (SIEBERT ELEM SCHOOL) | | | | | | 0923-09-055 | | | | | | STP 2008(712)SRS PEDESTRIAN FACILITIES | | | | | | | | | | | | WORK ORDER- 11-20-08 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 12-06-08 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 51 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | M & S CONCRETE CO. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0923-09-055 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10083018 | TOTALS | 268,987.80| 0.00| 0.00| 0.0| ************************************************************************************************************************************ EASTLAND ETC CALLAHAN C/L | 227.513 | 5,555,666.38| 0.00| 0.00| 0.0| FM 2945 ETC SH 206 | | | | | | 0007-14-005 | | | | | | CPM 7-14-5 SEAL COAT | | | | | | | | | | | | WORK ORDER- 12-09-08 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 12-25-08 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 76 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | BRANNAN PAVING CO., LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0007-14-005 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11083004 | TOTALS | 5,555,666.38| 0.00| 0.00| 0.0| ************************************************************************************************************************************ LAMPASAS FM 580 E & S | 6.351 | 6,245,968.01| 64,440.09| 5,814,222.76| 96.9| FM 1715 US 190 | | | | | | 3605-01-001 | | | | | | C 3605-1-1 GR.,BA.,STR.,SURF. | | | | | | | | | | | | WORK ORDER- 06-13-07 WORK BEGAN- 07-17-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-04-07 | | | | | | CONTRACT WORKING DAYS- 270 ADDL DAYS GRANTED- 27 | | | | | | WORKING DAYS CHARGED- 268 PERCENT TIME USED- 90 | | | | | | | | | | | | JAMES CONSTRUCTION GROUP, L.L.C. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 3605-01-001 | | | | | | LONE STAR TRAFFIC SERVICE, INC. | |SUB %: 0.33 | | | | TACH SERVICES, INC. | |SUB %: 0.60 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 1.21 | | | | GUAJARDO STEEL | |SUB %: 0.39 | | | | ALTEX LANDSCAPE CONSTRUCTION, INC. | |SUB %: 0.59 | | | | WOODARD CONSTRUCTION COMPANY | |SUB %: 7.57 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.05 | | | | ODUM SERVICES, L.P. | |SUB %: 0.28 | | | | D. I. J. CONSTRUCTION, INC. | |SUB %: 0.85 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES (TEMPE) | |SUB %: 0.82 | | | | MICA CORPORATION | |SUB %: 0.53 | | | | SOUTH TEXAS INDUSTRIAL COATINGS, L.L.C. | |SUB %: 0.01 | | | | WHEELER COATINGS ASPHALT, INC. | |SUB %: 7.29 | | | | TRIPLE J-SA CONSTRUCTION | |SUB %: 1.62 | | | | | | | | | | CONTRACT 05073003 | TOTALS | 6,245,968.01| 64,440.09| 5,814,222.76| 96.9| ************************************************************************************************************************************ LAMPASAS VARIOUS LOCATIONS IN SAN SABA, | 0.100 | 1,907,604.92| 200,754.58| 1,638,004.06| 85.8| VA BROWN AND MCCULLOCH COUNTIES | | | | | | 0923-10-015 | | | | | | STP 2007(514) SET AND GUARDRAIL REPLACEMENT | | | | | | | | | | | | WORK ORDER- 07-09-07 WORK BEGAN- 08-14-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-25-07 | | | | | | CONTRACT WORKING DAYS- 167 ADDL DAYS GRANTED- 120 | | | | | | WORKING DAYS CHARGED- 283 PERCENT TIME USED- 98 | | | | | | | | | | | | RYAN MATERIALS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0923-10-015 | | | | | | WS CONSTRUCTION CO. | |SUB %: 10.50 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 0.78 | | | | HJC FARMS, INC. | |SUB %: 1.43 | | | | MIKE BARKER CONSTRUCTION, INC. | |SUB %: 9.11 | | | | | | | | | | CONTRACT 05073017 | TOTALS | 1,907,604.92| 200,754.58| 1,638,004.06| 85.8| ************************************************************************************************************************************ LAMPASAS US 183 | 1.946 | 1,131,594.03| 66,648.85| 66,648.85| 5.8| US 281 BURNET C/L | | | | | | 0251-06-033 | | | | | | STP 2009(013) GR, BASE, SURF, SIGNAL, ILLUM, C&G | | | | | | | | | | | | WORK ORDER- 10-10-08 WORK BEGAN- 11-19-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-05-09 | | | | | | CONTRACT WORKING DAYS- 114 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | | | | | | | | | | | | RAY FARIS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0251-06-033 | | | | | | COTTER RESOURCES, INC. | |SUB %: 15.01 | | | | HIGHWAY TECHNOLOGIES | |SUB %: 5.52 | | | | M.V. HENKE ENTERPRISES, INC. | |SUB %: 2.01 | | | | ROADWAY SPECIALTIES, INC. | |SUB %: 4.39 | | | | F & W ELECTRICAL CONTRACTORS, INC. | |SUB %: 28.92 | | | | PIONEER UTILITIES, INC. | |SUB %: 4.25 | | | | | | | | | | CONTRACT 09083210 | TOTALS | 1,131,594.03| 66,648.85| 66,648.85| 5.8| ************************************************************************************************************************************ STEPHENS SHACKELFORD C/L ON US 180 | 0.100 | 394,754.45| 0.00| 400,740.85| 99.9| VA PALO PINTO C/L | | | | | | 0923-22-018 | | | | | | STP 2008(356) GUARDRAIL & BRIDGE RAIL REPLACEMENT | | | | | | | | | | | | WORK ORDER- 03-18-08 WORK BEGAN- 08-11-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-03-08 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 45 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 49 PERCENT TIME USED- 108 | |**************************************************| | | | | | | | STEPHENS MARTIN PAVING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0923-22-018 | | | | | | HJC FARMS, INC. | |SUB %: 40.56 | | | | | | | | | | CONTRACT 02083016 | TOTALS | 394,754.45| 0.00| 400,740.85| 99.9| ************************************************************************************************************************************ STEPHENS US 180 | 2.229 | 760,576.82| 77,578.76| 692,093.27| 91.9| FM 207 2 MI. SOUTH OF US 180 | | | | | | 0570-02-021 | | | | | | STP 2008(355) WIDEN, BASE OVERLAY, OCST | | | | | | | | | | | | WORK ORDER- 03-18-08 WORK BEGAN- 04-18-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-03-08 | | | | | | CONTRACT WORKING DAYS- 108 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 123 PERCENT TIME USED- 113 | | | | | | | | | | | | STEPHENS MARTIN PAVING, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0570-02-021 | | | | | | CONTRACTORS SERVICE COMPANY | |SUB %: 0.95 | | | | SHANNON YOUNG CO., INC. | |SUB %: 19.99 | | | | TEXAS ALTERNATIVE GRASSER, INC. | |SUB %: 0.33 | | | | TEXAS HIGHWAY MARKINGS, LLC | |SUB %: 1.91 | | | | TEXAS MULCHERS ENVIRONMENTAL SERVICES | |SUB %: 0.06 | | | | WILLIS ELECTRIC CO., LP | |SUB %: 1.18 | | | | | | | | | | CONTRACT 02083214 | TOTALS | 760,576.82| 77,578.76| 692,093.27| 91.9| ************************************************************************************************************************************ STEPHENS ETC AT LITTLE CADDO CREEK | 0.919 | 2,491,112.22| 0.00| 0.00| 0.0| US 180 ETC . | | | | | | 0011-09-062 | | | | | | BR 2008(869) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 12-05-08 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 12-21-08 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 239 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | HODGES AND SON CONSTRUCTION COMPANY, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0011-09-062 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 10083209 | TOTALS | 2,491,112.22| 0.00| 0.00| 0.0| ************************************************************************************************************************************ DISTRICT CONTRACT AMOUNT 61,535,504.34 DISTRICT ESTIMATES THIS MONTH 2,177,194.18 DISTRICT TOTAL ESTIMATES PAID TO DATE 28,433,849.96