Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
County | BRAZOS |
Highway |
SH0006 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6302-63-001 |
Proj ID |
SUP - 630263001 |
Work Type |
CONCRETE DRIVEWAY - RUCON |
|
|
0.001 |
21726.59 |
0.00 |
21726.59 |
100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
04-13-16 |
Work Began |
04-12-16 |
Work Completed |
04-22-16 |
Time Computed |
04-13-16 |
Contract Working Days |
11 |
Addl Days Granted |
0 |
Working Days Charged |
11 |
Percent Time Used |
100 |
Contractor(s) |
TIBH INDUSTRIES, INC. RUCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6302-63-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
04161731 |
|
Totals |
21726.59 |
0.00 |
21726.59 |
100.0 |
|
County | GRIMES |
Highway |
BS0006S |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6305-02-001 |
Proj ID |
SUP - 630502001 |
Work Type |
BUILDING JANITORIOL |
|
|
0.001 |
6880.28 |
901.56 |
1016.95 |
14.7 |
Work Order |
07-19-16 |
Work Began |
07-25-16 |
Work Completed |
|
Time Computed |
07-25-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
38 |
Percent Time Used |
10 |
Contractor(s) |
TIBH INDUSTRIES, INC. ODJ INC. "OUR SPECIALTY HELPING OTHERS IN NEED" |
SUBCONTRACTOR(S) FOR CCSJ: 6305-02-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07161731 |
|
Totals |
6880.28 |
901.56 |
1016.95 |
14.7 |
|
County | BRAZOS |
Highway |
SH0021 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6305-11-001 |
Proj ID |
RMC - 630511001 |
Work Type |
CLEANING AND SEALING CRACKS |
|
|
0.001 |
66437.96 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
14 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6305-11-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
09161701 |
|
Totals |
66437.96 |
0.00 |
0.00 |
0.0 |
|
County | BURLESON |
Highway |
SH0021 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6305-12-001 |
Proj ID |
RMC - 630512001 |
Work Type |
CLEANING AND SEALING CRACKS |
|
|
0.001 |
200680.81 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
44 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6305-12-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
09161702 |
|
Totals |
200680.81 |
0.00 |
0.00 |
0.0 |
|
County | FREESTONE |
Highway |
US0084 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6305-13-001 |
Proj ID |
RMC - 630513001 |
Work Type |
CLEANING AND SEALING CRACKS |
|
|
0.001 |
257675.83 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
53 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
L & M MOWING CONTRACTORS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6305-13-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
09161703 |
|
Totals |
257675.83 |
0.00 |
0.00 |
0.0 |
|
County | BRAZOS |
Highway |
US0190 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6305-15-001 |
Proj ID |
RMC - 630515001 |
Work Type |
INSTALLATION OF DRIVEWAY PIPE |
|
|
0.001 |
283259.00 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
72 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
R&M INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6305-15-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07161701 |
|
Totals |
283259.00 |
0.00 |
0.00 |
0.0 |
|
County | WASHINGTON |
Highway |
SH0105 |
From |
@ KUYKENDALL CREEK |
To |
@ KUYKENDALL CREEK |
CSJ |
6305-31-001 |
Proj ID |
EMC - 630531001 |
Work Type |
SLOPE, RIPRAP, AND MBGF REPAIR |
|
|
0.001 |
249779.50 |
0.00 |
340892.36 |
100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
06-15-16 |
Work Completed |
06-27-16 |
Time Computed |
00-00-00 |
Contract Working Days |
10 |
Addl Days Granted |
0 |
Working Days Charged |
10 |
Percent Time Used |
100 |
Contractor(s) |
FORDE CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6305-31-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
06161741 |
|
Totals |
249779.50 |
0.00 |
340892.36 |
100.0 |
|
County | WASHINGTON |
Highway |
FM0390 |
From |
@ JACKSON CREEK |
To |
@ JACKSON CREEK |
CSJ |
6305-32-001 |
Proj ID |
EMC - 630532001 |
Work Type |
ROADWAY AND BRIDGE CHANNEL REPAIR |
|
|
0.001 |
120310.00 |
0.00 |
133089.00 |
100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
06-11-16 |
Work Completed |
06-16-16 |
Time Computed |
00-00-00 |
Contract Working Days |
7 |
Addl Days Granted |
0 |
Working Days Charged |
6 |
Percent Time Used |
85 |
Contractor(s) |
GLENN FUQUA, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6305-32-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
06161740 |
|
Totals |
120310.00 |
0.00 |
133089.00 |
100.0 |
|
County | FREESTONE |
Highway |
SH0164 |
From |
SH 164 AT MINE HAUL ROAD |
To |
SH 164 AT MINE HAUL ROAD |
CSJ |
6305-49-001 |
Proj ID |
EMC - 630549001 |
Work Type |
BRIDGE REPAIR |
|
|
0.001 |
1198951.50 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
60 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
FORDE CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6305-49-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
09161740 |
|
Totals |
1198951.50 |
0.00 |
0.00 |
0.0 |
|
County | WASHINGTON |
Highway |
FM0050 |
From |
FM 50 @ LITTLE ROCKY CREEK |
To |
FM 50 @ LITTLE ROCKY CREEK |
CSJ |
6306-00-001 |
Proj ID |
EMC - 630600001 |
Work Type |
BRIDGE SUBSTRUCTURE REPAIR |
|
|
0.001 |
233288.00 |
0.00 |
225938.00 |
98.1 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
07-18-16 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
14 |
Addl Days Granted |
0 |
Working Days Charged |
19 |
Percent Time Used |
135 |
Contractor(s) |
FUQUA CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6306-00-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07161740 |
|
Totals |
233288.00 |
0.00 |
225938.00 |
98.1 |
|
County | WASHINGTON |
Highway |
FM0389 |
From |
@ SANDY CREEK |
To |
@ SANDY CREEK |
CSJ |
6306-07-001 |
Proj ID |
EMC - 630607001 |
Work Type |
SLOPE AND RIPRAP REPAIR |
|
|
0.001 |
93625.00 |
0.00 |
115800.00 |
99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
07-06-16 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
10 |
Addl Days Granted |
0 |
Working Days Charged |
10 |
Percent Time Used |
100 |
Contractor(s) |
GLENN FUQUA, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6306-07-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
06161742 |
|
Totals |
93625.00 |
0.00 |
115800.00 |
99.9 |
|
County | FREESTONE |
Highway |
US0084 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6306-59-001 |
Proj ID |
RMC - 630659001 |
Work Type |
REPAIR OF METAL BEAM GUARD FENCE |
|
|
0.001 |
313405.00 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
730 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
ISI CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6306-59-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
09161704 |
|
Totals |
313405.00 |
0.00 |
0.00 |
0.0 |
|
County | BRAZOS |
Highway |
FM1179 |
From |
FM 1179 @ SH 6 |
To |
FM 1179 @ SH 6 |
CSJ |
6306-87-001 |
Proj ID |
EMC - 630687001 |
Work Type |
BRIDGE SUBSTRUCTURE AND DECK REPAIR |
|
|
0.001 |
486366.50 |
0.00 |
513260.38 |
99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
07-18-16 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
35 |
Addl Days Granted |
0 |
Working Days Charged |
35 |
Percent Time Used |
100 |
Contractor(s) |
SCR CIVIL CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6306-87-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07161741 |
|
Totals |
486366.50 |
0.00 |
513260.38 |
99.9 |
|
County | BRAZOS |
Highway |
SH0006 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6307-68-001 |
Proj ID |
SUP - 630768001 |
Work Type |
TREE REMOVAL |
|
|
0.001 |
30219.00 |
0.00 |
7522.00 |
24.8 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
00-00-00 |
Work Began |
07-15-16 |
Work Completed |
|
Time Computed |
00-00-00 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
48 |
Percent Time Used |
13 |
Contractor(s) |
TIBH INDUSTRIES, INC. RUCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6307-68-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07161730 |
|
Totals |
30219.00 |
0.00 |
7522.00 |
24.8 |
|
County | WASHINGTON |
Highway |
SH0105 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6307-73-001 |
Proj ID |
SUP - 630773001 |
Work Type |
BUILDING JANITORIAL |
|
|
0.001 |
17219.37 |
1217.20 |
1217.20 |
7.0 |
Work Order |
08-02-16 |
Work Began |
08-02-16 |
Work Completed |
|
Time Computed |
08-02-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
30 |
Percent Time Used |
8 |
Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6307-73-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07161732 |
|
Totals |
17219.37 |
1217.20 |
1217.20 |
7.0 |
|
County | WASHINGTON |
Highway |
SH0105 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6307-74-001 |
Proj ID |
SUP - 630774001 |
Work Type |
PICNIC AREA MAINTENANCE |
|
|
0.001 |
34454.32 |
2926.70 |
2926.70 |
8.4 |
Work Order |
08-01-16 |
Work Began |
08-01-16 |
Work Completed |
|
Time Computed |
08-01-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
31 |
Percent Time Used |
8 |
Contractor(s) |
TIBH INDUSTRIES, INC. JUNCTION FIVE-O-FIVE |
SUBCONTRACTOR(S) FOR CCSJ: 6307-74-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
07161733 |
|
Totals |
34454.32 |
2926.70 |
2926.70 |
8.4 |
|
County | ROBERTSON |
Highway |
SH0006 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6308-55-001 |
Proj ID |
SUP - 630855001 |
Work Type |
REMOVAL & DISPOSAL OF SCRAP WHOLE TIRES |
|
|
0.010 |
114516.88 |
7112.42 |
7112.42 |
6.2 |
Work Order |
08-24-16 |
Work Began |
08-18-16 |
Work Completed |
|
Time Computed |
08-24-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
14 |
Percent Time Used |
3 |
Contractor(s) |
TIBH INDUSTRIES, INC. RUCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6308-55-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
08161730 |
|
Totals |
114516.88 |
7112.42 |
7112.42 |
6.2 |
|
County | GRIMES |
Highway |
BS0006S |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6309-22-001 |
Proj ID |
SUP - 630922001 |
Work Type |
PICNIC AREA MAINTENANCE IN GRIMES COUNTY |
|
|
0.001 |
41135.00 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
08-30-16 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
09-01-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
TIBH INDUSTRIES, INC. RUCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6309-22-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
08161731 |
|
Totals |
41135.00 |
0.00 |
0.00 |
0.0 |
|
County | ROBERTSON |
Highway |
SH0006 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6309-23-001 |
Proj ID |
SUP - 630923001 |
Work Type |
PICNIC AREA & WEIGH STATION MAINTENANCE |
|
|
0.010 |
25508.74 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
09-06-16 |
Work Began |
00-00-00 |
Work Completed |
|
Time Computed |
09-06-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
TIBH INDUSTRIES, INC. JUNCTION FIVE-O-FIVE |
SUBCONTRACTOR(S) FOR CCSJ: 6309-23-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
08161732 |
|
Totals |
25508.74 |
0.00 |
0.00 |
0.0 |
|
County | FREESTONE |
Highway |
US0084 |
From |
VARIOUS |
To |
VARIOUS |
CSJ |
6309-24-001 |
Proj ID |
SUP - 630924001 |
Work Type |
BUILDING JANITORIAL |
|
|
0.001 |
18242.52 |
0.00 |
0.00 |
0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order |
09-06-16 |
Work Began |
09-03-16 |
Work Completed |
|
Time Computed |
09-06-16 |
Contract Working Days |
365 |
Addl Days Granted |
0 |
Working Days Charged |
0 |
Percent Time Used |
0 |
Contractor(s) |
TIBH INDUSTRIES, INC. CEN-TEX ASSOCIATION FOR RETARDED CHILDREN |
SUBCONTRACTOR(S) FOR CCSJ: 6309-24-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # |
08161733 |
|
Totals |
18242.52 |
0.00 |
0.00 |
0.0 |
|