| Item No |
Description |
Units |
March 31, 2013 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 730 2002 |
FULL - WIDTH MOWING |
AC |
|
|
183,761.600 |
19.38181 |
30 |
| 745 2006 |
JANITORIAL MAINT (PICNIC AREAS) |
CYC |
|
|
104.000 |
164.65000 |
1 |
| 745 2007 |
GROUNDS MAINT (MOWING / TRIMMING) |
CYC |
|
|
15.000 |
125.09000 |
1 |
| 752 2022 |
TREE REMOVAL (4" - 12" DIA) |
EA |
1,160.000 |
30.92241 |
8,165.000 |
25.41335 |
7 |
| 752 2023 |
TREE REMOVAL (12" - 18" DIA) |
EA |
1,170.000 |
56.03846 |
3,660.000 |
48.47404 |
8 |
| 752 2024 |
TREE REMOVAL (18" - 24" DIA) |
EA |
580.000 |
83.72414 |
1,775.000 |
74.76901 |
8 |
| 752 2025 |
TREE REMOVAL (24" - 30" DIA) |
EA |
250.000 |
136.00000 |
850.000 |
121.04118 |
8 |
| 752 2026 |
TREE REMOVAL (30" - 36" DIA) |
EA |
94.000 |
217.97872 |
356.000 |
164.14326 |
7 |
| 752 2027 |
TREE REMOVAL (36" - 42" DIA) |
EA |
48.000 |
230.83333 |
233.000 |
167.60944 |
8 |
| 752 2028 |
TREE REMOVAL (42" - 48" DIA) |
EA |
14.000 |
100.42857 |
94.000 |
198.81915 |
7 |
| 752 2029 |
TREE REMOVAL (48" - 60" DIA) |
EA |
7.000 |
115.00000 |
69.000 |
401.66667 |
7 |
| 752 2030 |
TREE REMOVAL (60" - 72" DIA) |
EA |
7.000 |
115.00000 |
57.000 |
438.29825 |
7 |
| 752 2053 |
TREE TRIMMING |
EA |
320.000 |
11.75000 |
4,490.000 |
33.73274 |
8 |
| 752 2054 |
STUMP REMOVAL (12" OR LESS) |
EA |
50.000 |
0.70300 |
172.000 |
24.82645 |
7 |
| 752 2055 |
STUMP REMOVAL (GREATER THAN 12") |
EA |
35.000 |
1.00000 |
150.000 |
38.40000 |
6 |
| 770 2001 |
REPAIR RAIL ELEMENT (W - BEAM) |
LF |
|
|
7,500.000 |
9.33333 |
3 |
| 770 2002 |
REPAIR RAIL ELEMENT (THRIE - BEAM) |
LF |
|
|
150.000 |
17.66667 |
3 |
| 770 2003 |
REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) |
LF |
|
|
50.000 |
15.00000 |
2 |
| 770 2004 |
REM / REPL TIMBER / STL POST W / O CONC FND |
EA |
|
|
450.000 |
40.00000 |
3 |
| 770 2005 |
REM / REPL TIMBER / STL POST W / CONC FND |
EA |
|
|
15.000 |
40.00000 |
3 |
| 770 2006 |
REALIGN POSTS |
EA |
|
|
450.000 |
18.33333 |
3 |
| 770 2007 |
REPAIR OF TERMINAL ANCHORS POSTS |
EA |
|
|
15.000 |
110.00000 |
3 |
| 770 2008 |
REPLACE TERMINAL ANCHOR POSTS |
EA |
|
|
15.000 |
116.66667 |
3 |
| 770 2009 |
REMOVE GDRAIL END TRT / REPL WITH SGT |
EA |
|
|
30.000 |
1,900.00000 |
2 |
| 770 2010 |
REPL SINGLE GDRAIL TERM IMPACT HEAD |
EA |
|
|
30.000 |
766.66667 |
3 |
| 770 2011 |
REPLACE SINGLE GDRAIL TERMINAL RAIL |
LF |
|
|
600.000 |
10.00000 |
2 |
| 770 2012 |
REPLACE SINGLE GDRAIL TERMINAL POST |
EA |
|
|
90.000 |
36.66667 |
3 |
| 770 2014 |
REPAIR STEEL POST WITH BASE PLATE |
EA |
|
|
10.000 |
150.00000 |
2 |
| 770 2023 |
REPLACE SGT OBJECT MARKER |
EA |
|
|
6.000 |
23.33333 |
3 |
| 770 2024 |
REPLACE SGT CABLE ANCHOR |
EA |
|
|
6.000 |
41.66667 |
3 |
| 770 2025 |
REPLACE SGT CABLE ASSEMBLY |
EA |
|
|
8.000 |
70.00000 |
2 |
| 770 2026 |
REPLACE SGT STRUT |
EA |
|
|
12.000 |
33.33333 |
3 |
| 770 2027 |
REMOVE & REPLACE BLOCKOUT |
EA |
|
|
30.000 |
3.66667 |
3 |
| 770 2029 |
REPAIR RAIL ELEMENT (W - BEAM FURNISHED) |
LF |
|
|
550.000 |
4.00000 |
2 |
| 770 2034 |
REMOVE AND RESET SGT IMPACT HEAD |
EA |
|
|
45.000 |
300.00000 |
3 |
| 770 2035 |
REPAIR RAIL ELEMENT (CURVED RAIL) |
LF |
|
|
100.000 |
10.00000 |
2 |
| 770 2037 |
REM / REPL TIM POST W / O CONC FND (FURN) |
EA |
|
|
126.000 |
10.00000 |
2 |
| 770 2040 |
RAISE RAIL ELEMENT |
LF |
|
|
100.000 |
1.00000 |
2 |
| 770 2041 |
REM & REPLACE BLOCKOUTS (FURNISHED) |
EA |
|
|
6.000 |
1.00000 |
2 |
| 776 2045 |
REPAIR (TYPE M) |
LF |
|
|
12.750 |
1,000.00000 |
1 |
| 784 2006 |
REPAIR STL BRIDGE MEMBER (PILING) |
EA |
|
|
6.000 |
740.00000 |
2 |
| 788 2001 |
CONCRETE BEAM REPAIR |
EA |
|
|
2.000 |
6,000.00000 |
1 |
| 788 2002 |
CONCRETE BEAM REPAIR (CFRP) |
EA |
|
|
1.000 |
14,000.00000 |
1 |