AVERAGE LOW BID UNIT PRICE - MAINTENANCE - BRYAN DISTRICT

Last Update: Wednesday, April 3, 2013
ITEMS 730 2002 TO 788 2002
Items Items Bid Code Range
0100 - 0168
0247 - 0276
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0688
0730 - 0788
1122 - 1122
3224 - 3224
5049 - 5049
6266 - 6834
7224 - 7624
8094 - 8852
730 2002 - 788 2002
Item No Description Units March 31, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
730 2002 FULL - WIDTH MOWING AC     183,761.600 19.38181 30
745 2006 JANITORIAL MAINT (PICNIC AREAS) CYC     104.000 164.65000 1
745 2007 GROUNDS MAINT (MOWING / TRIMMING) CYC     15.000 125.09000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA 1,160.000 30.92241 8,165.000 25.41335 7
752 2023 TREE REMOVAL (12" - 18" DIA) EA 1,170.000 56.03846 3,660.000 48.47404 8
752 2024 TREE REMOVAL (18" - 24" DIA) EA 580.000 83.72414 1,775.000 74.76901 8
752 2025 TREE REMOVAL (24" - 30" DIA) EA 250.000 136.00000 850.000 121.04118 8
752 2026 TREE REMOVAL (30" - 36" DIA) EA 94.000 217.97872 356.000 164.14326 7
752 2027 TREE REMOVAL (36" - 42" DIA) EA 48.000 230.83333 233.000 167.60944 8
752 2028 TREE REMOVAL (42" - 48" DIA) EA 14.000 100.42857 94.000 198.81915 7
752 2029 TREE REMOVAL (48" - 60" DIA) EA 7.000 115.00000 69.000 401.66667 7
752 2030 TREE REMOVAL (60" - 72" DIA) EA 7.000 115.00000 57.000 438.29825 7
752 2053 TREE TRIMMING EA 320.000 11.75000 4,490.000 33.73274 8
752 2054 STUMP REMOVAL (12" OR LESS) EA 50.000 0.70300 172.000 24.82645 7
752 2055 STUMP REMOVAL (GREATER THAN 12") EA 35.000 1.00000 150.000 38.40000 6
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     7,500.000 9.33333 3
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     150.000 17.66667 3
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     50.000 15.00000 2
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     450.000 40.00000 3
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     15.000 40.00000 3
770 2006 REALIGN POSTS EA     450.000 18.33333 3
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     15.000 110.00000 3
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     15.000 116.66667 3
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     30.000 1,900.00000 2
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     30.000 766.66667 3
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     600.000 10.00000 2
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     90.000 36.66667 3
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     10.000 150.00000 2
770 2023 REPLACE SGT OBJECT MARKER EA     6.000 23.33333 3
770 2024 REPLACE SGT CABLE ANCHOR EA     6.000 41.66667 3
770 2025 REPLACE SGT CABLE ASSEMBLY EA     8.000 70.00000 2
770 2026 REPLACE SGT STRUT EA     12.000 33.33333 3
770 2027 REMOVE & REPLACE BLOCKOUT EA     30.000 3.66667 3
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF     550.000 4.00000 2
770 2034 REMOVE AND RESET SGT IMPACT HEAD EA     45.000 300.00000 3
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     100.000 10.00000 2
770 2037 REM / REPL TIM POST W / O CONC FND (FURN) EA     126.000 10.00000 2
770 2040 RAISE RAIL ELEMENT LF     100.000 1.00000 2
770 2041 REM & REPLACE BLOCKOUTS (FURNISHED) EA     6.000 1.00000 2
776 2045 REPAIR (TYPE M) LF     12.750 1,000.00000 1
784 2006 REPAIR STL BRIDGE MEMBER (PILING) EA     6.000 740.00000 2
788 2001 CONCRETE BEAM REPAIR EA     2.000 6,000.00000 1
788 2002 CONCRETE BEAM REPAIR (CFRP) EA     1.000 14,000.00000 1