AVERAGE LOW BID UNIT PRICE - MAINTENANCE - BRYAN DISTRICT

Last Update: Friday, April 17, 2015
ITEMS 712 2005 TO 780 2001
Items Items Bid Code Range
0100 - 0169
0216 - 0276
0316 - 0354
0400 - 0496
0500 - 0560
0610 - 0687
0712 - 0780
1122 - 1122
3267 - 3271
4568 - 4568
6001 - 6834
7048 - 7649
8317 - 8835
712 2005 - 780 2001
Item No Description Units March 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,793.665 406.20671 3
730 2002 FULL - WIDTH MOWING AC     94,293.520 22.81475 16
730 6002 FULL - WIDTH MOWING AC     52,825.760 23.07222 10
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     753.602 371.50000 3
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     1,054.440 370.33610 3
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     13.040 200.00000 2
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     109.680 341.28373 3
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     273.200 241.85820 3
738 2010 CLEANING / SWEEPING (SPOT) MI     40.800 247.05882 3
738 2011 CLEANING / SWEEPING (HANDWORK) SY     1,000.000 0.25000 1
745 2006 JANITORIAL MAINT (PICNIC AREAS) CYC     104.000 181.00000 1
745 2007 GROUNDS MAINT (MOWING / TRIMMING) CYC     15.000 350.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA 1,000.000 35.00000 8,083.000 36.02375 7
752 2023 TREE REMOVAL (12" - 18" DIA) EA 600.000 45.00000 3,722.000 55.37883 7
752 2024 TREE REMOVAL (18" - 24" DIA) EA 200.000 90.00000 1,679.000 83.93091 7
752 2025 TREE REMOVAL (24" - 30" DIA) EA 100.000 140.00000 777.000 109.44659 7
752 2026 TREE REMOVAL (30" - 36" DIA) EA 50.000 250.00000 443.000 151.28668 7
752 2027 TREE REMOVAL (36" - 42" DIA) EA 16.000 300.00000 183.000 155.19126 7
752 2028 TREE REMOVAL (42" - 48" DIA) EA 4.000 400.00000 94.000 150.00000 7
752 2029 TREE REMOVAL (48" - 60" DIA) EA 4.000 1.00000 55.000 17.23636 7
752 2030 TREE REMOVAL (60" - 72" DIA) EA 4.000 1.00000 43.000 16.04651 7
752 2053 TREE TRIMMING EA 100.000 20.00000 2,278.000 42.18613 7
752 2054 STUMP REMOVAL (12" OR LESS) EA 50.000 20.00000 356.000 35.15730 7
752 2055 STUMP REMOVAL (GREATER THAN 12") EA 50.000 25.00000 329.000 40.93009 7
752 6003 TREE TRIMMING / BRUSH REMOVAL MI     3.160 11,230.00000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     25,500.000 16.13725 5
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     238.000 1.00000 4
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     119.000 1.00000 4
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     1,500.000 34.00000 5
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     115.000 33.47826 5
770 2006 REALIGN POSTS EA     1,225.000 14.38776 5
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     41.000 1.00000 5
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     41.000 1.00000 5
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     90.000 1,883.33333 4
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     123.000 502.43902 5
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     8,650.000 13.82659 5
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     660.000 42.12121 5
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA     200.000 5.00000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     38.000 28.10526 5
770 2023 REPLACE SGT OBJECT MARKER EA     62.000 1.00000 5
770 2024 REPLACE SGT CABLE ANCHOR EA     42.000 1.00000 5
770 2025 REPLACE SGT CABLE ASSEMBLY EA     46.000 1.00000 5
770 2026 REPLACE SGT STRUT EA     40.000 1.00000 5
770 2027 REMOVE & REPLACE BLOCKOUT EA     185.000 13.91892 4
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF     2,060.000 4.05825 2
770 2034 REMOVE AND RESET SGT IMPACT HEAD EA     185.000 100.00000 5
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     500.000 12.80000 5
770 2036 REPL SGT IMPACT HEAD (FURNISHED) EA     18.000 100.00000 2
770 2037 REM / REPL TIM POST W / O CONC FND (FURN) EA     22.000 10.00000 1
770 2038 INSTALL BLOCKOUTS (FURNISHED) EA     8.000 11.00000 1
770 2040 RAISE RAIL ELEMENT LF     1,050.000 2.47619 5
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF     3,000.000 10.00000 1
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     75.000 1.00000 1
770 6003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM LF     40.000 1.00000 1
770 6006 RAISE RAIL ELEMENT LF     75.000 1.00000 1
770 6010 REM / REPL TIMBER / STL POST W / O CONC FN EA     225.000 45.00000 1
770 6011 REM / REPL TIMBER / STL POST W / CONC FN EA     10.000 45.00000 1
770 6017 REALIGN POSTS EA     225.000 20.00000 1
770 6019 REMOVE & REPLACE BLOCKOUT EA     15.000 10.00000 1
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     450.000 16.00000 1
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA     50.000 45.00000 1
770 6023 REPAIR OF TERMINAL ANCHORS POSTS EA     10.000 1.00000 1
770 6024 REPLACE TERMINAL ANCHOR POSTS EA     10.000 1.00000 1
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA     25.000 2,200.00000 1
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     15.000 1,000.00000 1
770 6030 REPLACE SGT CABLE ASSEMBLY EA     6.000 1.00000 1
770 6031 REPLACE SGT CABLE ANCHOR EA     5.000 1.00000 1
770 6032 REPLACE SGT STRUT EA     6.000 1.00000 1
770 6033 REPLACE SGT OBJECT MARKER EA     5.000 1.00000 1
770 6037 REPAIR RAIL ELEMENT (CURVED RAIL) (FURN LF     75.000 10.00000 1
770 6046 REM & RESET SGT IMPACT HEAD (FURNISHED EA     25.000 100.00000 1
770 6052 REPAIR STEEL POST WITH BASE PLATE EA     10.000 1.00000 1
771 6002 REPLACE POSTS (TL - 4) EA     800.000 78.00000 1
771 6004 CABLE SPLICE / TURNBUCKLE (TL - 4) EA     15.000 10.00000 1
771 6006 REPAIR CONCRETE FOUNDATION (TL - 4) EA     125.000 10.00000 1
771 6008 REPR OR REPLC CABLE BARR TERM SEC (TL - 4 EA     10.000 100.00000 1
771 6010 REPLACE CABLE (TL - 4) LF     500.000 1.00000 1
771 6012 REPLACE POST HARDWARE (TL - 4) EA     150.000 10.00000 1
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     350.000 27.14286 2
780 2001 EPOXY INJECTION (TY IX) LF     100.000 60.00000 2