AVERAGE LOW BID UNIT PRICE - MAINTENANCE - BRYAN DISTRICT

Last Update: Wednesday, April 3, 2013
ITEMS 500 2001 TO 560 2019
Items Items Bid Code Range
0100 - 0168
0247 - 0276
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0688
0730 - 0788
1122 - 1122
3224 - 3224
5049 - 5049
6266 - 6834
7224 - 7624
8094 - 8852
500 2001 - 560 2019
Item No Description Units March 31, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 2.000 8,000.00000 32.000 42,158.46656 32
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1.000 2,000.00000 106.000 2,354.29708 32
506 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     6,195.000 19.38245 9
506 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     230.000 21.23913 3
506 2009 ROCK FILTER DAMS (REMOVE) LF     6,425.000 5.82251 9
506 2024 BACKHOE WORK (EROSION & SEDM CONT) HR     158.000 73.94481 9
506 2025 EXCAVATOR WORK (EROSION & SEDM CONT) HR     9.000 90.00000 1
506 2034 TEMPORARY SEDIMENT CONTROL FENCE LF     34,142.000 2.63597 13
506 2036 SANDBAGS FOR EROSION CONTROL (6 IN) LF     30.000 18.00000 1
506 2037 SANDBAGS FOR EROSION CONTROL (12") LF     25.000 22.00000 1
512 2004 PORT CTB (FUR & INST) (SNGL SLP) (TY 1) LF 230.000 80.00000 230.000 80.00000 1
512 2022 PORT CTB (MOVE) (SNGL SLP) (TY 1) LF 230.000 20.00000 230.000 20.00000 1
512 2040 PORT CTB (REMOVE) (SNGL SLP) (TY 1) LF 230.000 10.00000 230.000 10.00000 1
528 2004 LANDSCAPE PAVERS SY     216.980 136.00000 1
529 2004 CONC CURB & GUTTER (TY II) LF     880.000 23.00000 1
529 2009 CONCRETE CURB (SPECIAL) LF     1,313.000 21.00000 1
530 2002 INTERSECTIONS (ACP) EA     3.000 1,250.00000 1
530 2003 INTERSECTIONS (SURF TREAT) EA     1.000 1,000.00000 1
530 2007 DRIVEWAYS (CONC) EA     14.000 2,285.71429 5
530 2008 DRIVEWAYS (ACP) EA     80.000 1,100.00000 14
530 2009 DRIVEWAYS (SURF TREAT) EA     222.000 431.19910 15
530 2014 TURNOUTS (ACP) EA     2.000 1,900.00000 1
530 2015 TURNOUTS (SURF TREAT) EA     238.000 465.11849 12
530 2058 DRIVEWAYS (OTHER) EA     325.000 237.32320 14
531 2001 CONC SIDEWALKS (3') (6") LF     10.000 165.00000 1
531 2010 CURB RAMPS (TY 7) EA     2.000 995.00000 1
531 2011 CURB RAMPS (TY 8) EA     4.000 995.00000 1
536 2002 CONC MEDIAN SY     346.000 94.00000 1
536 2006 CONC MEDIAN (MONO NOSE) SY     8.100 210.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 162.500 30.00000 562.500 21.46667 2
540 2007 MTL W - BEAM GD FEN ADJUSTMENT LF     200.000 1.00000 2
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 4.000 2,000.00000 4.000 2,000.00000 1
540 2016 MTL BM GD FN TRANS (THRIE) (RND TIM POST EA     12.000 100.00000 2
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA 1.000 1,000.00000 1.000 1,000.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF 275.000 2.00000 1,275.000 1.21569 3
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     4.000 250.00000 2
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     8.000 1,750.00000 1
544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA 3.000 500.00000 3.000 500.00000 1
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA 1.000 500.00000 5.000 300.00000 3
560 2007 MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T EA     28.000 202.92929 10
560 2008 MAILBOX INSTALL - M (TWW - POST) TY 4 FND - T EA     9.000 363.33333 7
560 2014 MAILBOX INSTALL - SP (TIM - POST) TY 5 FND EA     1.000 208.00000 1
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA     207.000 190.95894 12
560 2019 MAILBOX INSTALL - S (WC - POST) TY 3FND - AB EA     2.000 125.00000 1