| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | JEFFERSON |
| Highway |
0000000 |
| From |
8350 EASTEX FREEWAY (US 69) |
| To |
8350 EASTEX FREEWAY (US 69) |
| CSJ |
4704-00-586 |
| Proj ID |
CBC - 470400586 |
| Work Type |
ADDITION OR RENOVATION |
| |
|
0.001 |
964263.00 |
87989.46 |
929766.34 |
99.9 |
| Work Order |
06-05-07 |
| Work Began |
06-27-07 |
| Work Completed |
|
| Time Computed |
06-21-07 |
| Contract Working Days |
360 |
| Addl Days Granted |
51 |
| Working Days Charged |
376 |
| Percent Time Used |
91 |
| Contractor(s) |
| JAMAIL & SMITH CONSTRUCTION |
SUBCONTRACTOR(S) FOR CCSJ: 4704-00-586 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04074021 |
|
Totals |
964263.00 |
87989.46 |
929766.34 |
99.9 |
|
| County | JEFFERSON |
| Highway |
0000000 |
| From |
8350 EASTEX FREEWAY (US 69) |
| To |
8350 EASTEX FREEWAY (US 69) |
| CSJ |
4704-00-587 |
| Proj ID |
CBC - 470400587 |
| Work Type |
ADDITIONS OR RENOVATIONS |
| |
|
0.001 |
1199845.00 |
20841.01 |
1182946.84 |
99.9 |
| Work Order |
05-24-07 |
| Work Began |
06-27-07 |
| Work Completed |
|
| Time Computed |
06-09-07 |
| Contract Working Days |
420 |
| Addl Days Granted |
14 |
| Working Days Charged |
358 |
| Percent Time Used |
82 |
| Contractor(s) |
| LS & A GROUP, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 4704-00-587 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04074022 |
|
Totals |
1199845.00 |
20841.01 |
1182946.84 |
99.9 |
|
| County | LIBERTY |
| Highway |
US0090 |
| From |
0.24 MILES WEST OF SH 146, WEST |
| To |
0.31 MILES WEST OF SH 146 |
| CSJ |
6118-45-001 |
| Proj ID |
RMC - 611845001 |
| Work Type |
REPLACE EXIST CULVERT |
| |
|
0.075 |
371382.68 |
0.00 |
18000.00 |
62.7 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
09-14-08 |
| Work Began |
09-14-08 |
| Work Completed |
|
| Time Computed |
09-14-08 |
| Contract Working Days |
16 |
| Addl Days Granted |
17 |
| Working Days Charged |
20 |
| Percent Time Used |
60 |
| Contractor(s) |
| AJAX EQUIPMENT COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6118-45-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01084024 |
|
Totals |
371382.68 |
0.00 |
18000.00 |
62.7 |
|
| County | JEFFERSON |
| Highway |
US0069 |
| From |
DISTRICTWIDE |
| To |
DISTRICTWIDE |
| CSJ |
6154-47-001 |
| Proj ID |
RMC - 615447001 |
| Work Type |
INSTALLATION AND REPLACEMENT OF SIGNALS |
| |
|
0.001 |
855440.00 |
0.00 |
977321.03 |
99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
02-14-07 |
| Work Began |
02-21-07 |
| Work Completed |
|
| Time Computed |
02-21-07 |
| Contract Working Days |
150 |
| Addl Days Granted |
0 |
| Working Days Charged |
141 |
| Percent Time Used |
94 |
| Contractor(s) |
| STATEWIDE TRAFFIC SIGNAL COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6154-47-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12064017 |
|
Totals |
855440.00 |
0.00 |
977321.03 |
99.9 |
|
| County | LIBERTY |
| Highway |
US0090 |
| From |
HARRIS COUNTY LINE |
| To |
JEFFERSON COUNTY LINE |
| CSJ |
6155-05-001 |
| Proj ID |
RMC - 615505001 |
| Work Type |
MOWING RIGHT OF WAY - LIBERTY SECTION |
| |
|
10.000 |
649790.36 |
36552.90 |
589067.20 |
90.6 |
| Work Order |
05-15-07 |
| Work Began |
05-21-07 |
| Work Completed |
|
| Time Computed |
05-21-07 |
| Contract Working Days |
370 |
| Addl Days Granted |
0 |
| Working Days Charged |
119 |
| Percent Time Used |
32 |
| Contractor(s) |
| P-VILLE, INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6155-05-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03074010 |
|
Totals |
649790.36 |
36552.90 |
589067.20 |
90.6 |
|
| County | JEFFERSON |
| Highway |
SH0073 |
| From |
SPUR 380 |
| To |
SH 87 |
| CSJ |
6155-08-001 |
| Proj ID |
RMC - 615508001 |
| Work Type |
MOWING RIGHT OF WAY PORT ARTHUR SECTION |
| |
|
10.000 |
344455.00 |
23600.00 |
280543.07 |
81.5 |
| Work Order |
04-30-07 |
| Work Began |
05-01-07 |
| Work Completed |
|
| Time Computed |
05-07-07 |
| Contract Working Days |
212 |
| Addl Days Granted |
5 |
| Working Days Charged |
88 |
| Percent Time Used |
40 |
| Contractor(s) |
| M. D. JOHNSON TRACTOR SERVICE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6155-08-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03074027 |
|
Totals |
344455.00 |
23600.00 |
280543.07 |
81.5 |
|
| County | CHAMBERS |
| Highway |
IH0010 |
| From |
HARRIS COUNTY LINE |
| To |
FM 365 |
| CSJ |
6155-11-001 |
| Proj ID |
RMC - 615511001 |
| Work Type |
MOWING RIGHT OF WAY - ANAHUAC SECTION |
| |
|
10.000 |
378301.00 |
64451.50 |
357104.75 |
94.3 |
| Work Order |
05-07-07 |
| Work Began |
05-07-07 |
| Work Completed |
|
| Time Computed |
05-14-07 |
| Contract Working Days |
264 |
| Addl Days Granted |
0 |
| Working Days Charged |
73 |
| Percent Time Used |
27 |
| Contractor(s) |
| WAYNE YANCEY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6155-11-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04074009 |
|
Totals |
378301.00 |
64451.50 |
357104.75 |
94.3 |
|
| County | JEFFERSON |
| Highway |
US0069 |
| From |
VARIOUS LOCATIONS |
| To |
DISTRICTWIDE |
| CSJ |
6164-41-001 |
| Proj ID |
RMC - 616441001 |
| Work Type |
ILLUMINATION MAINTENANCE |
| |
|
0.001 |
1027585.00 |
0.00 |
0.00 |
6.2 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
09-02-08 |
| Work Began |
10-01-08 |
| Work Completed |
|
| Time Computed |
09-15-08 |
| Contract Working Days |
216 |
| Addl Days Granted |
0 |
| Working Days Charged |
17 |
| Percent Time Used |
7 |
| Contractor(s) |
| ANALYTICAL TECHNOLOGY CONSULTANTS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6164-41-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07084012 |
|
Totals |
1027585.00 |
0.00 |
0.00 |
6.2 |
|
| County | JEFFERSON |
| Highway |
IH0010 |
| From |
ORANGE COUNTY LINE |
| To |
HARRIS COUNTY LINE |
| CSJ |
6164-51-001 |
| Proj ID |
RMC - 616451001 |
| Work Type |
SWEEPING MAIN ROUTE HIGHWAYS |
| |
|
0.100 |
1801022.09 |
21951.70 |
181066.24 |
12.7 |
| Work Order |
05-27-08 |
| Work Began |
06-03-08 |
| Work Completed |
|
| Time Computed |
06-03-08 |
| Contract Working Days |
480 |
| Addl Days Granted |
0 |
| Working Days Charged |
79 |
| Percent Time Used |
16 |
| Contractor(s) |
| HIGHWAY TECHNOLOGIES, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6164-51-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03084014 |
|
Totals |
1801022.09 |
21951.70 |
181066.24 |
12.7 |
|
| County | JEFFERSON |
| Highway |
US0069 |
| From |
DISTRICTWIDE |
| To |
DISTRICTWIDE |
| CSJ |
6172-19-001 |
| Proj ID |
RMC - 617219001 |
| Work Type |
PLACE REFLECTIVE PAVEMENT MARKINGS |
| |
|
0.001 |
438817.75 |
0.00 |
276075.37 |
86.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
03-26-08 |
| Work Began |
04-09-08 |
| Work Completed |
|
| Time Computed |
04-09-08 |
| Contract Working Days |
108 |
| Addl Days Granted |
0 |
| Working Days Charged |
91 |
| Percent Time Used |
84 |
| Contractor(s) |
| CRABTREE BARRICADE SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6172-19-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02084021 |
|
Totals |
438817.75 |
0.00 |
276075.37 |
86.0 |
|
| County | JEFFERSON |
| Highway |
US0069 |
| From |
VARIOUS LOCATIONS |
| To |
DISTRICTWIDE |
| CSJ |
6172-48-001 |
| Proj ID |
RMC - 617248001 |
| Work Type |
INSTALLATION OF PAVEMENT MARKINGS |
| |
|
0.001 |
989932.49 |
46878.78 |
188809.09 |
19.0 |
| Work Order |
05-16-08 |
| Work Began |
07-09-08 |
| Work Completed |
|
| Time Computed |
05-23-08 |
| Contract Working Days |
144 |
| Addl Days Granted |
0 |
| Working Days Charged |
32 |
| Percent Time Used |
22 |
| Contractor(s) |
| HIGHWAY TECHNOLOGIES, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6172-48-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03084006 |
|
Totals |
989932.49 |
46878.78 |
188809.09 |
19.0 |
|
| County | HARDIN |
| Highway |
FM0418 |
| From |
COUNTY LINE |
| To |
COUNTY LINE |
| CSJ |
6173-80-001 |
| Proj ID |
RMC - 617380001 |
| Work Type |
TREE AND BRUSH TRIMMING |
| |
|
0.010 |
299755.46 |
0.00 |
183138.18 |
61.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
07-14-08 |
| Work Began |
07-17-08 |
| Work Completed |
|
| Time Computed |
07-21-08 |
| Contract Working Days |
41 |
| Addl Days Granted |
0 |
| Working Days Charged |
33 |
| Percent Time Used |
80 |
| Contractor(s) |
| ANALYTICAL TECHNOLOGY CONSULTANTS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6173-80-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05084014 |
|
Totals |
299755.46 |
0.00 |
183138.18 |
61.0 |
|
| County | LIBERTY |
| Highway |
US0090 |
| From |
DISTRICTWIDE |
| To |
DISTRICTWIDE |
| CSJ |
6173-83-001 |
| Proj ID |
RMC - 617383001 |
| Work Type |
GRIND PAV, CLEAN AND SEAL JOINTS |
| |
|
0.001 |
467207.50 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
25 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| PENHALL COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6173-83-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10084016 |
|
Totals |
467207.50 |
0.00 |
0.00 |
0.0 |
|
| County | JEFFERSON |
| Highway |
US0069 |
| From |
VARIOUS |
| To |
LOCATIONS |
| CSJ |
6174-90-001 |
| Proj ID |
RMC - 617490001 |
| Work Type |
TRAFFIC SIGNAL DETECTORS |
| |
|
1.000 |
186480.00 |
0.00 |
145795.00 |
86.3 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-02-08 |
| Work Began |
05-02-08 |
| Work Completed |
|
| Time Computed |
05-15-08 |
| Contract Working Days |
80 |
| Addl Days Granted |
0 |
| Working Days Charged |
57 |
| Percent Time Used |
71 |
| Contractor(s) |
| STATEWIDE TRAFFIC SIGNAL COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6174-90-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03084007 |
|
Totals |
186480.00 |
0.00 |
145795.00 |
86.3 |
|
| County | JEFFERSON |
| Highway |
SH0347 |
| From |
VARIOUS |
| To |
LOCATIONS |
| CSJ |
6175-06-001 |
| Proj ID |
RMC - 617506001 |
| Work Type |
SIGNAL MAINTENANCE |
| |
|
0.001 |
445426.80 |
0.00 |
103399.48 |
41.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-15-08 |
| Work Began |
08-07-08 |
| Work Completed |
|
| Time Computed |
05-22-08 |
| Contract Working Days |
80 |
| Addl Days Granted |
0 |
| Working Days Charged |
42 |
| Percent Time Used |
52 |
| Contractor(s) |
| ENCINO LANDSCAPE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6175-06-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03084013 |
|
Totals |
445426.80 |
0.00 |
103399.48 |
41.0 |
|
| County | JEFFERSON |
| Highway |
US0069 |
| From |
CHAMBERS COUNTY |
| To |
TYLER COUNTY |
| CSJ |
6175-90-001 |
| Proj ID |
RMC - 617590001 |
| Work Type |
DISTRICTWIDE SWEEPING OF ROADWAYS |
| |
|
0.100 |
750183.00 |
0.00 |
33403.93 |
12.4 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-27-08 |
| Work Began |
06-03-08 |
| Work Completed |
|
| Time Computed |
06-03-08 |
| Contract Working Days |
312 |
| Addl Days Granted |
0 |
| Working Days Charged |
80 |
| Percent Time Used |
25 |
| Contractor(s) |
| HIGHWAY TECHNOLOGIES, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6175-90-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04084014 |
|
Totals |
750183.00 |
0.00 |
33403.93 |
12.4 |
|
| County | JEFFERSON |
| Highway |
US0069 |
| From |
DISTRICTWIDE |
| To |
DISTRICTWIDE |
| CSJ |
6177-16-001 |
| Proj ID |
RMC - 617716001 |
| Work Type |
PLACE REFLECTIVE PAVEMENT MARKINGS |
| |
|
0.001 |
703263.75 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
200 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| CRABTREE BARRICADE SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6177-16-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06084019 |
|
Totals |
703263.75 |
0.00 |
0.00 |
0.0 |
|
| County | JEFFERSON |
| Highway |
US0069 |
| From |
DISTRICTWIDE |
| To |
DISTRICTWIDE |
| CSJ |
6178-73-001 |
| Proj ID |
RMC - 617873001 |
| Work Type |
DISTRICTWIDE GUARDRAIL REPAIR |
| |
|
0.001 |
475675.00 |
12365.00 |
37755.00 |
7.9 |
| Work Order |
08-21-08 |
| Work Began |
08-21-08 |
| Work Completed |
|
| Time Computed |
08-28-08 |
| Contract Working Days |
255 |
| Addl Days Granted |
0 |
| Working Days Charged |
65 |
| Percent Time Used |
25 |
| Contractor(s) |
| CKORP, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6178-73-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07084006 |
|
Totals |
475675.00 |
12365.00 |
37755.00 |
7.9 |
|
| County | HARDIN |
| Highway |
US0069 |
| From |
DISTRICTWIDE |
| To |
DISTRICTWIDE |
| CSJ |
6178-74-001 |
| Proj ID |
RMC - 617874001 |
| Work Type |
SEAL CRACKS WITH RUBBER ASPHALT |
| |
|
0.001 |
296974.11 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-28-08 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
11-04-08 |
| Contract Working Days |
26 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| D & M CONTRACTORS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6178-74-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
09084009 |
|
Totals |
296974.11 |
0.00 |
0.00 |
0.0 |
|
| County | JEFFERSON |
| Highway |
US0069 |
| From |
DISTRICTWIDE |
| To |
DISTRICTWIDE |
| CSJ |
6178-83-001 |
| Proj ID |
RMC - 617883001 |
| Work Type |
SLAB LIFTING AND STABILIZATION |
| |
|
0.001 |
657740.00 |
37481.75 |
37481.75 |
5.6 |
| Work Order |
10-21-08 |
| Work Began |
10-28-08 |
| Work Completed |
|
| Time Computed |
10-28-08 |
| Contract Working Days |
41 |
| Addl Days Granted |
0 |
| Working Days Charged |
4 |
| Percent Time Used |
9 |
| Contractor(s) |
| NORTEX CONCRETE LIFT & STABILIZATION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6178-83-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07084005 |
|
Totals |
657740.00 |
37481.75 |
37481.75 |
5.6 |
|