Monthly State Let Construction Report For Beaumont District As Of Feb 11, 2016 Page 2 Of 5

Last Update: Thursday, February 11, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyJASPER
Highway US 190
From AT NECHES RIVER RELIEF
To (STR 021308068)
CSJ 0213-08-077
Proj ID BR 1502(228)
Work Type GR, BS, PVMT & STR
 
0.602 7078117.16 0.00 1155125.55 16.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-06-15
Work Began 11-16-15
Work Completed  
Time Computed 00-00-00
Contract Working Days 252
Addl Days Granted 0
Working Days Charged 55
Percent Time Used 21
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0213-08-077
AMERICAN REMEDIATION OPTIONS, INC. (1.28%)
CRABTREE BARRICADE SYSTEMS, INC. (0.92%)
J & M CONTRACTING, COMPANY (4.19%)
TEX OP CONSTRUCTION, LP(0.21%)
CPAVE, INC.(0.31%)
Contract # 06153039
Totals 7078117.16 0.00 1155125.55 16.3

CountyJASPER
Highway US 190
From PR 48 SOUTH, EAST
To 1.625 MILES WEST OF FM 777
CSJ 0213-08-089
Proj ID NH 2013(562)
Work Type GR, BS, PVMT, STRIPE
 
6.784 4313473.26 5451.06 462556.70 10.7
Work Order 07-14-15
Work Began 08-11-15
Work Completed  
Time Computed 08-10-15
Contract Working Days 235
Addl Days Granted 0
Working Days Charged 70
Percent Time Used 29
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0213-08-089
AMERICAN REMEDIATION OPTIONS, INC. (5.44%)
CRABTREE BARRICADE SYSTEMS, INC. (2.27%)
J & M CONTRACTING, COMPANY (2.99%)
CPAVE, INC.(0.24%)
COWBELL TESTING SERVICE(0.20%)
DUSTROL, INC.(0.54%)
MARTINDALE TREE SERVICE(1.21%)
Contract # 05153255
Totals 4313473.26 5451.06 462556.70 10.7

CountyLIBERTY
Highway SH 61
From 0.668 MILES NORTH OF FM 1410, SOUTH
To 0.596 MILES NORTH OF FM 1410
CSJ 0242-01-026
Proj ID STP 2014(341)
Work Type GR, BS, ACP
 
0.072 40163.27 0.00 40499.71 100.0
CountyLIBERTY
Highway SH 61
From 0.6 MI N OF FM 1410, SOUTH
To CHAMBERS CO/L
CSJ 0242-02-023
Proj ID STP 2014(341)
Work Type WDN SUBGR, ACP, OCST
 
4.666 2497173.86 0.00 2442348.10 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 02-13-14
Work Began 05-15-14
Work Completed 02-10-15
Time Computed 03-01-14
Contract Working Days 79
Addl Days Granted 0
Working Days Charged 102
Percent Time Used 129
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0242-02-023
WEST TEXAS RUMBLE STRIP(0.17%)
CRABTREE BARRICADE SYSTEMS, INC. (1.38%)
AMERICAN REMEDIATION OPTIONS, INC. (1.07%)
ANGEL BROTHERS ENTERPRISES, LTD. ( 23.99%)
Contract # 01143017
Totals 2537337.13 0.00 2482847.81 100.0

CountyJASPER
Highway SH 62
From 0.168 MILES SOUTH OF FM 253, SOUTH
To 3.379 MILES NORTH OF NEWTON CO/L
CSJ 0243-01-050
Proj ID STP 1502(422)
Work Type GR, BS, OV, STRIPE
 
9.017 9416731.77 0.00 0.00 0.0
CountyJASPER
Highway FM 2246
From 0.118 MILES WEST OF SH 62, EAST
To SH 62
CSJ 2120-01-027
Proj ID STP 1502(666)
Work Type GR, BS, OV, STRIPE
 
0.118 139544.34 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 200
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0243-01-050
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 12153016
Totals 9556276.11 0.00 0.00 0.0

CountyORANGE
Highway SH 62
From FM 1078
To 0.122 MILES SOUTH OF FM 1078
CSJ 0243-03-061
Proj ID CM 1402(095)
Work Type GR, BS, STR, PVMT
 
0.122 140492.90 0.00 133908.54 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-15-14
Work Began 09-08-14
Work Completed 12-04-14
Time Computed 08-31-14
Contract Working Days 30
Addl Days Granted 0
Working Days Charged 26
Percent Time Used 86
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0243-03-061
AMERICAN REMEDIATION OPTIONS, INC. (3.90%)
CRABTREE BARRICADE SYSTEMS, INC. (9.30%)
Contract # 07143053
Totals 140492.90 0.00 133908.54 100.0

CountyJASPER
Highway SH 63
From ANGELINA COUNTY LINE
To 0.26 MILES WEST OF FM 2799
CSJ 0244-02-098
Proj ID STP 1502(350)
Work Type PLANE, ACP, STRIPE
 
14.382 6777550.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 07-15-15
Work Began 00-00-00
Work Completed  
Time Computed 11-13-15
Contract Working Days 55
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DREWERY CONSTRUCTION COMPANY, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0244-02-098
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06153021
Totals 6777550.00 0.00 0.00 0.0

CountyNEWTON
Highway SH 87
From FM 1004, SOUTH
To 7.5 MILES
CSJ 0305-03-041
Proj ID STP 1502(136)HES
Work Type CL TXT, TXT SHLDRS
 
7.500 74992.50 0.00 77848.25 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-05-15
Work Began 08-03-15
Work Completed 08-12-15
Time Computed 08-05-15
Contract Working Days 15
Addl Days Granted 0
Working Days Charged 7
Percent Time Used 46
Contractor(s)
CRABTREE BARRICADE SYSTEMS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0305-03-041
WEST TEXAS RUMBLE STRIP( 12.31%)
Contract # 05153040
Totals 74992.50 0.00 77848.25 100.0

CountyORANGE
Highway SH 73
From AT COW BAYOU
To .
CSJ 0306-01-059
Proj ID BR 2013(920)
Work Type REPAIR BRIDGE
 
0.616 9509229.88 132210.60 10113781.94 100.0
Work Order 10-30-13
Work Began 01-31-14
Work Completed 02-03-16
Time Computed 11-15-13
Contract Working Days 476
Addl Days Granted 71
Working Days Charged 423
Percent Time Used 77
Contractor(s)
GIBSON & ASSOCIATES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-01-059
APAC-TEXAS, INC. (1.67%)
CRABTREE BARRICADE SYSTEMS, INC. (0.84%)
DUSTROL, INC.(0.20%)
INTECH CONTRACTING LLC ( 12.59%)
IOWA BRIDGE & CULVERT, LC( 16.80%)
LLOYD D. NABORS DEMOLITION LLC (1.17%)
RUSSELL MARINE, LLC( 11.46%)
UNDERWATER SERVICES, INC.(1.22%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.57%)
TX TINMAN ENTERPRISES, LLC.(8.01%)
L D CONSTRUCTION (2.39%)
MUSTANG COLT SERVICES, INC.(4.30%)
WIDGEON CONSTRUCTION, INC. (0.64%)
Contract # 08133252
Totals 9509229.88 132210.60 10113781.94 100.0

CountyJEFFERSON
Highway SH 87
From AT CRANE BAYOU
To (STR 030603027)
CSJ 0306-03-120
Proj ID BR 2013(856)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.100 2487698.29 3345.00 2708797.80 99.9
CountyJEFFERSON
Highway SH 73
From 25 ST @ CRANE BAYOU LATERAL
To (STR 050804166)
CSJ 0508-04-155
Proj ID BR 2013(856)
Work Type STR
 
0.100 308554.08 17412.35 424128.74 99.9
Work Order 10-07-13
Work Began 12-03-13
Work Completed  
Time Computed 10-23-13
Contract Working Days 356
Addl Days Granted 48
Working Days Charged 464
Percent Time Used 114
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-03-120
CRABTREE BARRICADE SYSTEMS, INC. (2.13%)
AMERICAN REMEDIATION OPTIONS, INC. (2.32%)
NORMAN HIGHWAY CONSTRUCTORS, INC.( 35.12%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (4.04%)
PRIMATE CONSTRUCTION, INC. (0.22%)
CERTIFIED PLACERS LLC(0.24%)
CPAVE, INC.(0.09%)
Contract # 07133024
Totals 2796252.37 20757.35 3132926.54 99.9

CountyJEFFERSON
Highway SH 87
From SH 347,
To US 69
CSJ 0306-03-121
Proj ID STP 2016(704)
Work Type GR, BA, OCST, ACP, JOINT SEAL
 
1.780 1428197.41 0.00 0.00 0.0
CountyJEFFERSON
Highway SH 87
From US 69
To .10 MI N. OF SH 82
CSJ 0307-01-145
Proj ID STP 2016(704)
Work Type GR, BA, OCST, ACP, JOINT SEAL
 
2.968 1730678.56 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 70
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-03-121
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02163041
Totals 3158875.97 0.00 0.00 0.0

CountyJEFFERSON
Highway SH 73
From AT RAINBOW BRIDGE
To (STR 030603015)
CSJ 0306-03-123
Proj ID NH 2014(978)
Work Type CLEAN AND REPAINT BRIDGE
 
1.460 26599824.20 822251.00 22657585.48 85.1
Work Order 10-17-14
Work Began 01-05-15
Work Completed  
Time Computed 11-02-14
Contract Working Days 614
Addl Days Granted 0
Working Days Charged 315
Percent Time Used 51
Contractor(s)
SAFFO CONTRACTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-03-123
CRABTREE BARRICADE SYSTEMS, INC. (0.09%)
JMD BUILDING PRODUCTS LLC(5.07%)
EMPIRE SCAFFOLD(6.33%)
CEKRA INC. (3.08%)
Contract # 07143202
Totals 26599824.20 822251.00 22657585.48 85.1

CountyJEFFERSON
Highway SH 87
From AT VETERANS MEMORIAL BRIDGE
To (STR 030603030)
CSJ 0306-03-124
Proj ID NH 2014(979)
Work Type STAY CABLE MAINTENANCE
 
1.787 2318400.00 0.00 2473306.01 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-22-14
Work Began 11-03-14
Work Completed 05-13-15
Time Computed 10-08-14
Contract Working Days 102
Addl Days Granted 5
Working Days Charged 90
Percent Time Used 84
Contractor(s)
SCR CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-03-124
CRABTREE BARRICADE SYSTEMS, INC. (0.16%)
INTECH CONTRACTING LLC ( 33.42%)
ALPIN TECHNIK UND INGENIEURSERVICE GMBH( 41.16%)
BRIDGES R US PAINTING CO., INC.( 12.93%)
Contract # 08143035
Totals 2318400.00 0.00 2473306.01 100.0

CountyJEFFERSON
Highway SH 73
From AT VETERANS MEMORIAL BRIDGE
To (STR 30603030)
CSJ 0306-03-125
Proj ID BR 1502(600)
Work Type REPLACE DOLPHINS
 
0.123 3805302.00 0.00 0.00 0.0
CountyJEFFERSON
Highway SH 73
From AT RAINBOW BRIDGE
To (STR 030603015)
CSJ 0306-03-128
Proj ID BR 1502(600)
Work Type REPAIR DOLPHINS
 
0.123 60432.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 12-08-15
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 210
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
MCCARTHY BUILDING COMPANIES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0306-03-125
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09153024
Totals 3865734.00 0.00 0.00 0.0

CountyJEFFERSON
Highway SH 87
From AT INTRACOASTAL CANAL BRIDGE
To .
CSJ 0307-01-147
Proj ID BR 1502(005)
Work Type STR
 
0.941 3454612.26 179200.00 1860133.55 53.8
Work Order 06-18-15
Work Began 10-12-15
Work Completed  
Time Computed 08-18-15
Contract Working Days 179
Addl Days Granted 0
Working Days Charged 86
Percent Time Used 48
Contractor(s)
SCR CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0307-01-147
INTECH CONTRACTING LLC ( 72.25%)
CRABTREE BARRICADE SYSTEMS, INC. (0.84%)
MIK INDUSTRIAL, LLC( 18.06%)
Contract # 05153053
Totals 3454612.26 179200.00 1860133.55 53.8

CountyTYLER
Highway US 287
From AT RUSSELL CREEK
To (STR 202290034104027)
CSJ 0341-04-071
Proj ID BR 1502(044)
Work Type UPGRADE BRIDGE AND APPROACH RAILING
 
0.040 269374.26 -8160.00 253253.08 97.0
CountyJEFFERSON
Highway SH 347
From AT THE MAIN "A" CANAL
To (STR 201240066701005)
CSJ 0667-01-117
Proj ID BR 1502(009)
Work Type UPGRADE BRIDGE AND APPROACH RAILING
 
0.015 97961.48 4062.50 47779.91 48.7
CountyJEFFERSON
Highway SH 347
From AT THE MAIN "B" CANAL
To (STR 201240066701009)
CSJ 0667-01-118
Proj ID BR 1502(009)
Work Type UPGRADE BRIDGE AND APPROACH RAILING
 
0.003 52260.55 10830.07 13280.07 25.4
Work Order 05-08-15
Work Began 05-29-15
Work Completed  
Time Computed 05-29-15
Contract Working Days 135
Addl Days Granted 0
Working Days Charged 149
Percent Time Used 110
Contractor(s)
L.C. JORDAN & SON
SUBCONTRACTOR(S) FOR CCSJ: 0341-04-071
AMERICAN REMEDIATION OPTIONS, INC. ( 18.47%)
CRABTREE BARRICADE SYSTEMS, INC. (3.97%)
Contract # 04153241
Totals 419596.29 6732.57 314313.06 76.8

CountyORANGE
Highway SH 12
From SH 62
To NEWTON CO/L
CSJ 0499-03-057
Proj ID STP 2014(803)
Work Type PLANE, SMA, STRIPE
 
3.859 2279714.00 0.00 2204541.48 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-07-14
Work Began 10-06-14
Work Completed 11-25-14
Time Computed 00-00-00
Contract Working Days 25
Addl Days Granted 0
Working Days Charged 17
Percent Time Used 68
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0499-03-057
DUSTROL, INC.( 10.11%)
CRABTREE BARRICADE SYSTEMS, INC. (1.56%)
Contract # 04143232
Totals 2279714.00 0.00 2204541.48 100.0

CountyCHAMBERS
Highway IH 10
From EAST OF HARRIS COUNTY LINE
To WEST OF SH 146
CSJ 0508-02-112
Proj ID IM 0108(182)
Work Type RELOCATE EASTBOUND EXIT RAMP
 
0.568 1813849.85 0.00 783930.07 43.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-27-15
Work Began 11-10-15
Work Completed  
Time Computed 00-00-00
Contract Working Days 90
Addl Days Granted 0
Working Days Charged 42
Percent Time Used 46
Contractor(s)
JOHN REED AND COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0508-02-112
JMHP, INC. (4.42%)
FLORIDA TRAFFIC CONTROL DEVICES, INC.(3.80%)
REGIONAL TRAFFIC SERVICES LLC(1.54%)
CPAVE, INC.(0.13%)
TLC TRUCKING & CONTRACTING, INC. (0.60%)
LONE STAR TRAFFIC SERVICE, INC.(0.16%)
NORTHWEST MATERIALS(0.46%)
Contract # 07153215
Totals 1813849.85 0.00 783930.07 43.2

CountyCHAMBERS
Highway IH 10
From 0.120 MILES EAST OF SH 99, EAST
To FM 565
CSJ 0508-02-113
Proj ID NH 2015(706)
Work Type GR, BS, OCST, STRIPE
 
3.645 1920391.04 0.00 2036886.92 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-24-15
Work Began 06-22-15
Work Completed 12-23-15
Time Computed 05-25-15
Contract Working Days 90
Addl Days Granted 0
Working Days Charged 80
Percent Time Used 88
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0508-02-113
A-1 EROSION CONTROL, LLC (0.39%)
STRIPE-A-LINE, INC.(3.17%)
Contract # 03153005
Totals 1920391.04 0.00 2036886.92 100.0

CountyCHAMBERS
Highway IH 10
From AT SH 99 & HACKBERRY GULLY
To (STR 200360050802349)
CSJ 0508-02-118
Proj ID BR 1502(011)
Work Type BRIDGE REPAIR
 
0.335 313764.55 14450.00 370956.18 100.0
Work Order 05-14-15
Work Began 07-21-15
Work Completed 10-21-15
Time Computed 06-14-15
Contract Working Days 25
Addl Days Granted 6
Working Days Charged 36
Percent Time Used 116
Contractor(s)
GIBSON & ASSOCIATES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0508-02-118
LONE STAR TRAFFIC SERVICE, INC.(1.08%)
Contract # 04153209
Totals 313764.55 14450.00 370956.18 100.0

CountyJEFFERSON
Highway SP 215
From SH 73, EAST
To 0.794 MI W OF SH 87
CSJ 0508-06-020
Proj ID STP 2014(509)
Work Type FDR, BS, MILL, OVERLAY
 
1.371 1979708.80 0.00 1950384.14 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-02-14
Work Began 05-02-14
Work Completed 10-21-15
Time Computed 04-18-14
Contract Working Days 75
Addl Days Granted 0
Working Days Charged 200
Percent Time Used 266
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0508-06-020
AMERICAN REMEDIATION OPTIONS, INC. (6.15%)
CRABTREE BARRICADE SYSTEMS, INC. (1.57%)
CPAVE, INC.( 24.56%)
DUSTROL, INC.(4.06%)
PINNACLE GRINDING & GROOVING, LLC(4.03%)
Contract # 02143031
Totals 1979708.80 0.00 1950384.14 100.0