Monthly State Let Construction Report For Beaumont District As Of Jan 11, 2017 Page 2 Of 3

Last Update: Thursday, January 12, 2017
FTP Icon
page 1 | page 2 | page 3

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyJEFFERSON
HighwaySH 73
FromSH 87
To0.400 MILES EAST OF FM 366
CSJ0306-03-126
Proj IDNH 2017(301)
Work TypePVMT REPAIR, MILL, OCST, PFC
 
0.782649754.100.000.0
CountyJEFFERSON
HighwaySH 73
From0.300 MILES WEST OF SPUR 215, EAST
ToSH 87
CSJ0508-04-166
Proj IDNH 2017(301)
Work TypePVMT REPAIR, MILL, OCST, PFC
 
6.1157596920.750.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days180
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0306-03-126
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01173021
Totals8246674.850.000.000.0

CountyLIBERTY
HighwaySH 146
FromRR OVERPASS IN HARDIN, SOUTH
ToSL 227
CSJ0388-03-078
Proj IDSTP 1602(059)
Work TypePVMT REPAIR, MILL, ACP
 
5.4381675302.981649244.2198.4
CountyLIBERTY
HighwaySL 227
FromGRAND AVENUE, SOUTH
ToUS 90
CSJ0388-05-010
Proj IDSTP 1602(058)
Work TypeMILL, PVMT REPAIR, OCST, ACP
 
0.435402515.84223189.2655.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-29-16
Work Began08-27-16
Work Completed
Time Computed00-00-00
Contract Working Days56
Addl Days Granted0
Working Days Charged48
Percent Time Used85
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0388-03-078
ROADSAFE TRAFFIC SYSTEMS, INC. (2.73)
CPAVE, INC. (18.86)
Contract #05163009
Totals2077818.820.001872433.4790.1

CountyCHAMBERS
HighwaySH 146
From@IH-10
To.
CSJ0389-02-051
Proj IDSTP 2017(491)HES
Work TypeIMPROVE TRAFFIC SIGNALS
 
0.200223068.550.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days38
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TRAF-TEX, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0389-02-051
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01173237
Totals223068.550.000.000.0

CountyCHAMBERS
HighwayIH 10
FromHARRIS COUNTY
ToSH 61
CSJ0508-02-111
Proj IDSTP 1602(060)HES
Work TypeTXT SHLDRS
 
15.790131475.45121971.5092.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-06-16
Work Began12-06-16
Work Completed
Time Computed00-00-00
Contract Working Days12
Addl Days Granted0
Working Days Charged10
Percent Time Used83
Contractor(s)
DOUBLE A CONTRACTING, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0508-02-111
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #05163223
Totals131475.450.00121971.5092.7

CountyCHAMBERS
HighwayIH 10
FromEAST OF HARRIS COUNTY LINE
ToWEST OF SH 146
CSJ0508-02-112
Proj IDIM 0108(182)
Work TypeRELOCATE EASTBOUND EXIT RAMP
 
0.5681813849.851762817.8699.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-27-15
Work Began11-10-15
Work Completed
Time Computed00-00-00
Contract Working Days90
Addl Days Granted29
Working Days Charged172
Percent Time Used144
Contractor(s)
JOHN REED AND COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0508-02-112
JMHP, INC. (4.59)
FLORIDA TRAFFIC CONTROL DEVICES, INC. (3.80)
REGIONAL TRAFFIC SERVICES LLC (1.54)
CPAVE, INC. (0.13)
TLC TRUCKING & CONTRACTING, INC. (0.60)
LONE STAR TRAFFIC SERVICE, INC. (0.16)
NORTHWEST MATERIALS (0.46)
HIGHWAY 1, LLC (1.22)
CENTURY ASPHALT MATERIALS (0.50)
MVA FINE CURBS LLC (0.02)
CROSSTEX CURBS (0.44)
J. KRU LAND SERVICES, LLC. (0.12)
Contract #07153215
Totals1813849.850.001762817.8699.4

CountyLIBERTY
HighwaySH 105
From0.647 MILES EAST OF SH 321
To1.251 MILES EAST OF SH 321
CSJ0593-01-117
Proj IDSTP 1602(153)HES
Work TypeGR, BASE, STRIPE, ACP
 
0.6041388679.60693434.8749.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-05-16
Work Began09-06-16
Work Completed
Time Computed00-00-00
Contract Working Days117
Addl Days Granted0
Working Days Charged53
Percent Time Used45
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0593-01-117
J & M CONTRACTING, COMPANY (14.84)
CEN TEX HYDROSEED, INC. (0.95)
WATERS CONSTRUCTION CO., INC. (2.17)
CRABTREE BARRICADE SYSTEMS, INC. (2.90)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (3.07)
COWBELL TRAFFIC SERVICES, INC. (0.43)
LONE STAR TRAFFIC SERVICE, INC. (0.33)
TEX OP CONSTRUCTION, LP (1.59)
JOHN REED AND COMPANY, LLC (19.47)
EROSION ABATEMENT, LLC (0.55)
Contract #06163013
Totals1388679.600.00693434.8749.9

CountyTYLER
HighwayFM 92
FromFM 1013, NORTH
ToFM 1746
CSJ0703-01-059
Proj IDSTP 1602(061)HRR
Work TypeSFTY TRT FXD OBJ
 
6.988123460.25116214.4694.1
CountyHARDIN
HighwayFM 92
FromBEAN RD, SOUTH
ToFM 1122
CSJ0703-02-057
Proj IDSTP 1602(062)HRR
Work TypeSFTY TRT FXD OBJ
 
4.409339263.41221469.6765.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-20-16
Work Began08-10-16
Work Completed
Time Computed00-00-00
Contract Working Days83
Addl Days Granted20
Working Days Charged92
Percent Time Used89
Contractor(s)
NORMAN HIGHWAY CONSTRUCTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0703-01-059
AMERICAN REMEDIATION OPTIONS, INC. (4.74)
CRABTREE BARRICADE SYSTEMS, INC. (2.52)
Contract #05163226
Totals462723.660.00337684.1372.9

CountyCHAMBERS
HighwayIH 10
FromSH 73, EAST
ToJEFFERSON CO. LINE
CSJ0739-01-039
Proj IDNH 1602(470)
Work TypeRECONST GR, STRS BS & PAV
 
3.11324138551.422502681.5410.3
CountyJEFFERSON
HighwayIH 10
FromCHAMBERS CO/L, EAST
ToHAMSHIRE RD
CSJ0739-02-160
Proj IDNH 1602(470)
Work TypeGR, BS, STR, PVMT
 
2.10219031143.036071184.7231.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order10-13-16
Work Began10-27-16
Work Completed
Time Computed00-00-00
Contract Working Days696
Addl Days Granted0
Working Days Charged31
Percent Time Used4
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0739-01-039
INTERSTATE BARRICADES & MARKINGS, INC. (0.60)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (1.11)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.01)
CPAVE, INC. (0.24)
SCOTT DERR PAINTING CO, LLC (0.05)
MESA ROD BUSTERS, INC. (5.50)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (1.69)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.92)
WEST TEXAS RUMBLE STRIP (0.11)
ANGEL BROTHERS ENTERPRISES, LTD. (1.65)
Contract #09163201
Totals43169694.450.008573866.2619.8

CountyJEFFERSON
HighwayIH 10
FromAT FM 364
To.
CSJ0739-02-155
Proj IDC 739-2-155
Work TypeGR, BS, STR, PVMT, SIGN
 
1.23023901799.0224792992.0999.9
CountyZERO COUNTIES
Highway
From
To
CSJ0739-02-159
Proj ID
Work Type
 
0.00228811.770.0
CountyJEFFERSON
HighwayFM 364
From0.5 MILES N. OF IH-10
To900 FT. S. OF IH-10
CSJ0786-01-082
Proj IDC 786-1-82
Work TypeGR,STR, BS, PVMT, STRIPE
 
0.6476088530.935614229.5892.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-10-15
Work Began08-21-15
Work Completed
Time Computed00-00-00
Contract Working Days484
Addl Days Granted0
Working Days Charged412
Percent Time Used85
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0739-02-155
INTERSTATE BARRICADES & MARKINGS, INC. (0.64)
AMERICAN REMEDIATION OPTIONS, INC. (0.52)
SCOTT DERR PAINTING CO (0.23)
DAVIS TREE EXPERTS (0.09)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.57)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.17)
ADCOCK 4 INVESTMENTS, LLC (1.29)
MESA ROD BUSTERS, INC. (3.93)
THIRD COAST SERVICES LLC (1.81)
BASE CONSTRUCTION (0.62)
BORTUNCO (0.08)
SPECIALTY DRILLING, LTD. (0.30)
RAY"S THREADING AND FAB SHOP (0.26)
BRYSTAR CONTRACTING, INC. (0.59)
APAC-TEXAS, INC. (1.45)
WEST TEXAS RUMBLE STRIP (0.01)
Contract #07153004
Totals29990329.950.0030636033.4499.8

CountyHARDIN
HighwayFM 418
FromFM 92, SOUTH
ToUS 96
CSJ0784-01-046
Proj IDSTP 1602(064)HES
Work TypeSFTY TRT FXD OBJ
 
1.6911031113.540.000.0
CountyHARDIN
HighwayFM 1003
FromFM 1293
ToSOUTH, 2.5 MI
CSJ0811-02-028
Proj IDSTP 1602(065)HES
Work TypeSFTY TRT FXD OBJ
 
2.50046474.400.000.0
CountyHARDIN
HighwayFM 787
FromFM 1293
ToSOUTH, 6.0 MI
CSJ0813-02-038
Proj IDSTP 1602(063)HES
Work TypeSFTY TRT FXD OBJ
 
6.000204002.850.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-29-16
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days183
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0784-01-046
AMERICAN REMEDIATION OPTIONS, INC. (5.30)
CRABTREE BARRICADE SYSTEMS, INC. (2.13)
NORMAN HIGHWAY CONSTRUCTORS, INC. (23.51)
Contract #05163229
Totals1281590.790.000.000.0

CountyORANGE
HighwayFM 105
FromUNION PACIFIC RR
To6.0 MI S OF IH 10
CSJ0883-02-068
Proj IDSTP 2016(410)
Work TypeGR, BS, STR. PVMT
 
3.9242668330.65741895.3027.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-28-16
Work Began04-18-16
Work Completed
Time Computed00-00-00
Contract Working Days69
Addl Days Granted55
Working Days Charged87
Percent Time Used70
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0883-02-068
CRABTREE BARRICADE SYSTEMS, INC. (1.87)
AMERICAN REMEDIATION OPTIONS, INC. (2.21)
NORMAN HIGHWAY CONSTRUCTORS, INC. (26.64)
WIDGEON CONSTRUCTION, INC. (1.76)
Contract #01163235
Totals2668330.650.00741895.3027.8

CountyJEFFERSON
HighwayVA
FromDISTRICTWIDE
To.
CSJ0920-00-116
Proj IDSTP 2014(646)
Work TypeLANDSCAPE
 
3.428832522.01791876.2295.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-22-14
Work Began10-20-14
Work Completed
Time Computed00-00-00
Contract Working Days219
Addl Days Granted0
Working Days Charged198
Percent Time Used90
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-00-116
CLASSIC TEJAS CONSTRUCTION, INC. (3.46)
CRABTREE BARRICADE SYSTEMS, INC. (1.68)
Contract #05143219
Totals832522.010.00791876.2295.1

CountyJEFFERSON
HighwayVA
FromDISTRICTWIDE
To.
CSJ0920-00-117
Proj IDSTP 1502(181)
Work TypeLANDSCAPE
 
1.000718877.79652479.0090.7
Work Order07-20-15
Work Began11-16-15
Work Completed
Time Computed08-20-15
Contract Working Days186
Addl Days Granted0
Working Days Charged100
Percent Time Used53
Contractor(s)
APEX LANDSCAPE & IRRIGATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0920-00-117
AMERICAN REMEDIATION OPTIONS, INC. (7.17)
CRABTREE BARRICADE SYSTEMS, INC. (1.28)
Contract #05153033
Totals718877.792500.00652479.0090.7

CountyJEFFERSON
HighwayVA
FromDISTRICTWIDE
To.
CSJ0920-00-118
Proj IDSTP 1602(155)
Work TypeLANDSCAPE
 
1.567706493.95520191.8073.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-04-16
Work Began10-01-16
Work Completed
Time Computed00-00-00
Contract Working Days225
Addl Days Granted0
Working Days Charged28
Percent Time Used12
Contractor(s)
APEX LANDSCAPE & IRRIGATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0920-00-118
CRABTREE BARRICADE SYSTEMS, INC. (1.39)
HOLES INCORPORATED (0.00)
Contract #06163218
Totals706493.950.00520191.8073.6

CountyORANGE
HighwayCR
FromOLD HIGHWAY 90, S.OF I10 ACCESS RD.
ToEAST BANK OF NECHES RIVER
CSJ0920-30-081
Proj IDCM 2015(253)
Work TypeGR,BS,STR, PVMT,RR, SIGN
 
0.4208977087.386724486.7474.9
Work Order06-01-15
Work Began01-07-16
Work Completed
Time Computed06-17-15
Contract Working Days157
Addl Days Granted137
Working Days Charged207
Percent Time Used70
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-30-081
A. H. BECK FOUNDATION CO., INC. (14.83)
INDUS CONSTRUCTION, L.P. (1.81)
J & M CONTRACTING, COMPANY (0.88)
RIVER CITY RAILROAD TROLLEY & TRANSIT CONSULTANTS (0.55)
CRABTREE BARRICADE SYSTEMS, INC. (0.44)
AMERICAN REMEDIATION OPTIONS, INC. (1.11)
ALLSTATE SIGNAL & CONSTRUCTION, LLC (1.90)
Contract #10143215
Totals8977087.3824726.006724486.7474.9

CountyJEFFERSON
HighwayCS
FromCONCORD RD FROM SH 105
ToLUCAS DR.
CSJ0920-38-153
Proj IDHP 450(1)
Work TypeGR, STR, BS, PVMT, STRIPE, SIGNAL
 
1.78011284746.7110414155.2792.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-26-12
Work Began04-23-13
Work Completed
Time Computed00-00-00
Contract Working Days364
Addl Days Granted99
Working Days Charged470
Percent Time Used101
Contractor(s)
AMERICAN HOME ASSURANCE COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0920-38-153
CRABTREE BARRICADE SYSTEMS, INC. (0.39)
HEMPHILL PILE DRIVING CO., A CORP. (0.19)
DREWERY CONSTRUCTION COMPANY, INCORPORATED (0.49)
AMERICAN REMEDIATION OPTIONS, INC. (0.88)
SOLIS TRUCKING (0.56)
GARY WHITMAN MATERIALS, INC. (0.16)
ACCESS DATA SUPPLY, INC. (6.52)
VIMAC-USA, INC. (5.87)
PREMIERE DESIGN SOLUTIONS, INC. (5.87)
APAC-TEXAS, INC. (0.56)
TEX OP CONSTRUCTION, LP (0.22)
TRAFFIC CONTROL PRODUCTS (HOUSTON) (0.50)
CJ EXPRESS (1.59)
TEXAS STERLING CONSTRUCTION CO. (75.51)
ROADSAFE TRAFFIC SYSTEMS, INC. (1.02)
L D CONSTRUCTION (4.37)
AAA FLEXIBLE PIPE CLEANING COMPANY, INC. (0.22)
CPAV SPECIALTIES, LP (1.10)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (1.12)
MESA ROD BUSTERS, INC. (0.54)
R. ORTIZ TRUCKING (1.32)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (0.92)
CJ EXPRESS (5.52)
CURB PLANET INC. (0.11)
Contract #07123217
Totals11284746.710.0010414155.2792.3

CountyJEFFERSON
HighwayCR
FromISLAND PARK RD AT BRAKES BAYOU
To(STR AA0101001)
CSJ0920-38-217
Proj IDBR 2011(844)
Work TypeSTR, BASE, ACP
 
0.1112984343.402792890.3393.7
Work Order06-01-15
Work Began07-15-15
Work Completed
Time Computed07-02-15
Contract Working Days180
Addl Days Granted38
Working Days Charged224
Percent Time Used102
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-38-217
AMERICAN REMEDIATION OPTIONS, INC. (1.09)
CRABTREE BARRICADE SYSTEMS, INC. (0.23)
J & M CONTRACTING, COMPANY (1.87)
TOLUNAY-WONG ENGINEERS, INC. (0.38)
PHOENIX POLLUTION CONTROL & ENVIRONMENTAL SERVICES, INC. (2.77)
ADVANCED POST-TENSION LLC (0.72)
WHALEY STEEL CORP (0.19)
CPAVE, INC. (0.10)
Contract #03153218
Totals2984343.4077536.222792890.3393.7

CountyJEFFERSON
HighwayCS
FromBLOCK STREET
ToLLANO STREET, IN PORT NECHES
CSJ0920-38-254
Proj IDSTP 2014(096)TE
Work TypeGR, BS, PVMT, LNDSCP
 
0.303749492.52882033.9799.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-26-16
Work Began04-25-16
Work Completed
Time Computed00-00-00
Contract Working Days68
Addl Days Granted25
Working Days Charged91
Percent Time Used97
Contractor(s)
SOUTH TEXAS ILLUMINATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0920-38-254
ANALYTICAL TECHNOLOGY CONSULTANTS, INC. (8.61)
CRABTREE BARRICADE SYSTEMS, INC. (2.83)
JE CASEY, LLC (1.37)
Contract #08153266
Totals749492.520.00882033.9799.9

CountyCHAMBERS
HighwayVA
FromON FM 565 FROM FM 3360 TO FISHER RD
ToFM 3360 FROM CHERRY PT TO EAGLE PT
CSJ0920-39-023
Proj IDSTP 2017(422)TAPS
Work TypeGR, PVMT
 
1.733964954.450.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days90
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
DEZTEX INDUSTRIAL SERVICES, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0920-39-023
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #12163037
Totals964954.450.000.000.0

CountyJEFFERSON
HighwayFM 365
FromAT GROUND GULLY
To.
CSJ0932-02-053
Proj IDBR 1502(424)
Work TypeREPLACE BRIDGE AND APPROACHES
 
1.0361565852.57587138.8037.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order11-12-15
Work Began10-26-16
Work Completed
Time Computed00-00-00
Contract Working Days89
Addl Days Granted0
Working Days Charged33
Percent Time Used37
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0932-02-053
AMERICAN REMEDIATION OPTIONS, INC. (3.62)
CRABTREE BARRICADE SYSTEMS, INC. (1.61)
DUSTROL, INC. (0.91)
HEMPHILL PILE DRIVING CO., A CORP. (5.03)
CPAVE, INC. (0.17)
HOUSTON SAWING & DRILLING (0.22)
Contract #08153263
Totals1565852.570.00587138.8037.4