Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyLIBERTY
Highway US 90
From HARRIS COUNTY LINE, EAST
To UP RR IN DAYTON
CSJ 0028-03-099
Proj ID STP 2007(308)
Work Type MILL, ACP
 
16.820 9781392.66 0.00 9604362.62 99.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-11-07
Work Began 06-27-07
Work Completed  
Time Computed 00-00-00
Contract Working Days 179
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0028-03-099
BATTERSON, L.L.P.(2.26%)
CPAV SPECIALTIES, LP (7.02%)
AGGREGATE TECHNOLOGIES, INC. ( 11.88%)
Contract # 03073004
Totals 9781392.66 0.00 9604362.62 99.0

CountyJEFFERSON
Highway US 90 ETC
From 8.1 MI W OF FM 364, EAST
To FM 364
CSJ 0028-06-068
Proj ID CPM 28-6-68
Work Type SEAL COAT
 
191.251 5793195.76 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-03-08
Work Began 04-28-08
Work Completed  
Time Computed 00-00-00
Contract Working Days 76
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
J-W PAYNE CONSTRUCTION COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0028-06-068
HIGHWAY TECHNOLOGIES (0.48%)
Contract # 12073008
Totals 5793195.76 0.00 0.00 0.0

CountyJEFFERSON
Highway US 90
From LAUREL AVE IN BEAUMONT, EAST
To NORTH ST (ALONG WILLOW ST)
CSJ 0028-07-051
Proj ID HP 2008(818)
Work Type LANDSCAPING
 
0.351 1408452.95 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 167
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-07-051
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11083212
Totals 1408452.95 0.00 0.00 0.0

CountyORANGE
Highway IH 10
From W OF DEWITT RD
To FM 105
CSJ 0028-09-100
Proj ID NH 2005(479)
Work Type GR, STRS, BASE & SURF
 
3.033 78266071.22 2380937.92 55264328.55 73.5
Work Order 02-01-06
Work Began 03-06-06
Work Completed  
Time Computed 10-06-06
Contract Working Days 829
Addl Days Granted 0
Working Days Charged 589
Percent Time Used 71
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-09-100
ESSARY, HART & MACWILIAM,INC.(7.68%)
EROSION CONTROL, INC.(0.10%)
BOOTHE BROTHERS PAVING COMPANY, INC. (0.41%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.26%)
L D CONSTRUCTION (0.31%)
JOE VALENCIK, INC. (1.34%)
MICA CORPORATION (2.71%)
DAVIS TREE EXPERTS (0.07%)
SCOTT DERR PAINTING CO (0.29%)
TREVCON, INC.(5.45%)
SCR CONSTRUCTION CO., INC. (0.06%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (0.24%)
ODUM SERVICES, L.P.(0.46%)
VAQUERO CONSTRUCTION, INC. (1.47%)
CURB PLANET INC. (0.08%)
Contract # 12053022
Totals 78266071.22 2380937.92 55264328.55 73.5

CountyORANGE
Highway IH 10
From KCS RR, EAST
To SH 62
CSJ 0028-11-182
Proj ID IM 10-8(155)
Work Type GR, STR, BS, PVMT, SIGN
 
18.771 80988017.01 1957251.26 67316052.74 86.8
Work Order 05-16-03
Work Began 08-04-03
Work Completed  
Time Computed 08-04-03
Contract Working Days 1,041
Addl Days Granted 289
Working Days Charged 1,438
Percent Time Used 108
Contractor(s)
W.W. WEBBER INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-11-182
UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON)(0.12%)
JOE VALENCIK, INC. (0.88%)
SILVA CONTRACTING COMPANY, INC.( 12.91%)
A & G EBERHARDT ENTERPRISES, INC.(0.13%)
WEBBER-BALKE FOUNDATION COMPANY, INC.(0.48%)
EROSION CONTROL, INC.(0.26%)
ODUM SERVICES, L.P.(0.83%)
RODBUSTERS, INC. (8.83%)
C.W.C. CONTRACTORS (0.09%)
TRUST INDUSTRIES (0.02%)
GATOR GRINDING, L.L.C. (0.10%)
ASHTON SAWING AND DRILLING LLC (0.24%)
WIDGEON CONSTRUCTION, INC. (0.01%)
HUMBLE EQUIPMENT CO., INC. (0.03%)
PROFESSIONAL MAID SERVICE(0.08%)
CREACOM, INC.(0.13%)
INDUS CONSTRUCTION, L.P. (8.01%)
MTAM CORPORATION (0.12%)
SCOTT DERR PAINTING CO (0.12%)
PLACO, LTD.(0.00%)
CURB PLANET INC. (0.00%)
KOSSMAN CONTRACTING COMPANY(0.01%)
Contract # 03033001
Totals 80988017.01 1957251.26 67316052.74 86.8

CountyJEFFERSON
Highway IH 10
From US 90, EAST
To HOLLYWOOD AVE (FRONTAGE ROADS)
CSJ 0028-13-124
Proj ID IM 0108(162)
Work Type GR, BS, ASB, ACP
 
1.571 9794825.72 311577.05 3998651.36 40.8
Work Order 08-14-07
Work Began 10-09-07
Work Completed  
Time Computed 08-30-07
Contract Working Days 455
Addl Days Granted 5
Working Days Charged 237
Percent Time Used 51
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-13-124
AMERICAN REMEDIATION OPTIONS, INC. (0.66%)
ANTIGO CONSTRUCTION, INC.(0.33%)
CPAV SPECIALTIES, LP (0.77%)
CRABTREE BARRICADE SYSTEMS, INC. (2.97%)
DUSTROL, INC. (ROANOKE)(0.47%)
HOLLIER CONSTRUCTION CO. (2.12%)
NORMAN HIGHWAY CONSTRUCTORS, INC.( 13.93%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(1.19%)
DAVIS TREE EXPERTS (0.00%)
SCOTT DERR PAINTING CO (0.13%)
Contract # 03073006
Totals 9794825.72 311577.05 3998651.36 40.8

CountyJEFFERSON
Highway IH 10
From US 90 (COLLEGE ST), EAST
To NECHES RIVER BRIDGE
CSJ 0028-13-128
Proj ID IM 0108(163)
Work Type STRIPE
 
5.034 258145.48 0.00 286696.68 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-03-08
Work Began 04-02-08
Work Completed 11-07-08
Time Computed 01-19-08
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 57
Percent Time Used 95
Contractor(s)
BATTERSON, L.L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0028-13-128
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 12073212
Totals 258145.48 0.00 286696.68 100.0

CountyLIBERTY
Highway US 59
From SAN JACINTO CO/L, SOUTH
To LP 573 (NORTH JCT)
CSJ 0177-03-088
Proj ID STP 2008(275)HES
Work Type MEDIAN BARRIER
 
4.700 699801.75 65841.32 251228.13 35.8
Work Order 02-20-08
Work Began 08-04-08
Work Completed  
Time Computed 03-07-08
Contract Working Days 74
Addl Days Granted 6
Working Days Charged 41
Percent Time Used 51
Contractor(s)
SCR CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0177-03-088
CRAWFORD YANT(1.82%)
KOSSMAN CONTRACTING COMPANY(2.38%)
QUALITY TRAFFIC SERVICES, L.L.C. (0.77%)
Contract # 01083029
Totals 699801.75 65841.32 251228.13 35.8

CountyTYLER
Highway US 69
From 0.5 MI S OF FM 1013, SOUTH
To HARDIN CO/L
CSJ 0200-08-054
Proj ID NH 2008(535)
Work Type MILL, ACP, STRIPE
 
9.813 2898852.07 418213.54 793028.66 27.3
Work Order 05-12-08
Work Began 08-08-08
Work Completed  
Time Computed 05-28-08
Contract Working Days 68
Addl Days Granted 5
Working Days Charged 35
Percent Time Used 47
Contractor(s)
MOORE BROTHERS CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0200-08-054
INTERSTATE BARRICADES & MARKINGS, INC. (0.24%)
DUSTROL, INC. (ROANOKE)(3.80%)
CHEROKEE SERVICES(4.32%)
BATTERSON, L.L.P.(4.13%)
LONGVIEW BRIDGE AND ROAD, INC. (0.19%)
Contract # 04083007
Totals 2898852.07 418213.54 793028.66 27.3

CountyJEFFERSON
Highway US 69
From FRONTAGE ROADS AT NEDERLAND AVE
To .
CSJ 0200-15-015
Proj ID CM 2007(475)
Work Type GR, BS, STR, PVMT
 
0.289 2081665.50 27198.96 2194472.32 99.9
Work Order 07-12-07
Work Began 08-15-07
Work Completed  
Time Computed 07-28-07
Contract Working Days 115
Addl Days Granted 14
Working Days Charged 166
Percent Time Used 128
Contractor(s)
ALLCO, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0200-15-015
CRABTREE BARRICADE SYSTEMS, INC. (2.52%)
TRAF-TEX, INC. (4.17%)
AMERICAN REMEDIATION OPTIONS, INC. (0.05%)
TREVCON, INC.( 22.62%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.84%)
CREATIVE CONCRETE SURFACE(6.69%)
BUILT BY TRUE VALUE LLC(2.53%)
LAKE AREA CONCRETE, LLC(4.55%)
INDUS CONSTRUCTION, L.P. (0.37%)
SCOTT DERR PAINTING CO (0.14%)
Contract # 05073022
Totals 2081665.50 27198.96 2194472.32 99.9

CountyJEFFERSON
Highway US 69
From AT MAIN B CANAL
To (STR 020016142)
CSJ 0200-16-009
Proj ID BR 2008(570)
Work Type REPLACE BRIDGE AND APPROACHES
 
1.440 5358305.70 514971.00 1653448.66 30.8
Work Order 07-02-08
Work Began 08-13-08
Work Completed  
Time Computed 07-18-08
Contract Working Days 295
Addl Days Granted 0
Working Days Charged 32
Percent Time Used 10
Contractor(s)
DOUGHTIE CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0200-16-009
ENVIRONMENTAL ALLIES, L.P. (0.94%)
JUST GROOVING, LTD.(0.08%)
TOM-MAC, INC.(3.55%)
CTF STRIPING (0.42%)
D & E CONTRACTORS(0.83%)
JEFFERSON ELECTRIC COMPANY, INC. (0.04%)
HIGHWAY TECHNOLOGIES, L.P. (0.58%)
ANGEL BROTHERS ENTERPRISES, LTD. (6.77%)
Contract # 05083203
Totals 5358305.70 514971.00 1653448.66 30.8

CountyTYLER
Highway US 190
From US 69, EAST
To NECHES RIVER BRIDGE
CSJ 0213-07-052
Proj ID STP 2008(475)
Work Type ACP, BASE, STRIPE
 
14.000 5103678.67 0.00 2230242.86 43.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-12-08
Work Began 08-01-08
Work Completed  
Time Computed 00-00-00
Contract Working Days 90
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0213-07-052
TEX OP CONSTRUCTION, LP(4.05%)
CRABTREE BARRICADE SYSTEMS, INC. (1.80%)
Contract # 04083203
Totals 5103678.67 0.00 2230242.86 43.6

CountyNEWTON
Highway SH 63
From JASPER CO/L, EAST
To SH 87 IN BURKEVILLE
CSJ 0214-02-040
Proj ID STP 2008(476)
Work Type ACP, STRIPE
 
22.746 4281889.89 0.00 934441.37 21.8
Work Order 05-09-08
Work Began 00-00-00
Work Completed  
Time Computed 05-25-08
Contract Working Days 75
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0214-02-040
BATTERSON, L.L.P.(2.78%)
Contract # 04083004
Totals 4281889.89 0.00 934441.37 21.8

CountyLIBERTY
Highway SH 105
From AT EAST FORK OF SAN JACINTO RIVER
To .
CSJ 0338-05-016
Proj ID BR 2007(391)
Work Type STR, PAV
 
0.554 3521530.26 2476.80 3754364.08 99.9
Work Order 06-20-07
Work Began 07-16-07
Work Completed  
Time Computed 07-06-07
Contract Working Days 231
Addl Days Granted 0
Working Days Charged 223
Percent Time Used 96
Contractor(s)
LONE STAR ROAD CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0338-05-016
BATTERSON, L.L.P.(0.23%)
ENVIRONMENTAL ALLIES, L.P. (0.14%)
WEBBER-BALKE FOUNDATION COMPANY, INC.( 11.56%)
CAPROCK SPECIALITY CONTRACTORS (0.25%)
WILLOW CITY SIGN & RAIL, INC.(0.90%)
SCOTT DERR PAINTING CO (0.09%)
UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON)(0.71%)
CRAWFORD YANT(0.13%)
HAYDEN PAVING(4.84%)
MARTINEZ STEEL (4.28%)
THIRD COAST SERVICES, LLC(0.08%)
AGGREGATE TECHNOLOGIES, INC. (0.42%)
Contract # 04073223
Totals 3521530.26 2476.80 3754364.08 99.9

CountyLIBERTY
Highway SH 105
From 0.6 MI W OF FM1010 S OF CLEVELAND,E
To 2.1 MI E OF LP 573
CSJ 0338-12-001
Proj ID HP 1169(009)
Work Type GR, STR, BS, PAV, STRIP, SIGN
 
2.733 12217764.80 1597478.42 6961879.87 56.9
Work Order 01-10-08
Work Began 03-12-08
Work Completed  
Time Computed 01-26-08
Contract Working Days 468
Addl Days Granted 21
Working Days Charged 151
Percent Time Used 30
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0338-12-001
J & M CONTRACTING, COMPANY (4.87%)
CRABTREE BARRICADE SYSTEMS, INC. (0.82%)
WILLOW CITY SIGN & RAIL, INC.(0.53%)
SEMARCK LANDSCAPE SERVICES, INC. (3.97%)
CRAWFORD YANT(1.19%)
LONE STAR CONSTRUCTION ( 10.78%)
THIRD COAST SERVICES, LLC(2.54%)
L.O. MATERIALS & TRUCKING, INC.(0.00%)
WEBBER-BALKE FOUNDATION COMPANY, INC.(1.62%)
PRIMATE CONSTRUCTION, INC. (0.03%)
W.W. WEBBER, LLC (0.40%)
Contract # 11073201
Totals 12217764.80 1597478.42 6961879.87 56.9

CountyHARDIN
Highway SH 105
From FM 770 (EAST JUNCTION), EAST
To 0.762 MI WEST OF SH 326
CSJ 0339-03-034
Proj ID NH 2008(477)
Work Type ACP, STRIPE
 
14.880 2280226.47 0.00 2891181.51 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 05-12-08
Work Began 06-26-08
Work Completed  
Time Computed 05-28-08
Contract Working Days 48
Addl Days Granted 13
Working Days Charged 28
Percent Time Used 45
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0339-03-034
BATTERSON, L.L.P.(0.57%)
CRABTREE BARRICADE SYSTEMS, INC. (3.25%)
PRIMATE CONSTRUCTION, INC. (1.59%)
WATERS CONSTRUCTION CO., INC.( 18.80%)
Contract # 04083207
Totals 2280226.47 0.00 2891181.51 99.9

CountyTYLER
Highway US 287
From 12.07 MI N OF US 69, SOUTH
To 11.3 MI.
CSJ 0341-04-065
Proj ID STP 2007(172)
Work Type GR, BS, PVMT
 
11.312 8707471.64 35338.96 9029194.14 99.9
Work Order 03-07-07
Work Began 04-06-07
Work Completed  
Time Computed 03-23-07
Contract Working Days 195
Addl Days Granted 55
Working Days Charged 243
Percent Time Used 97
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0341-04-065
CRABTREE BARRICADE SYSTEMS, INC. (1.45%)
MOORE BROTHERS CONSTRUCTION COMPANY( 25.66%)
WATERS CONSTRUCTION COMPANY, INC., BOB (2.34%)
AMERICAN REMEDIATION OPTIONS, INC. (3.57%)
HOUSTON SAWING & DRILLING(0.11%)
Contract # 01073205
Totals 8707471.64 35338.96 9029194.14 99.9

CountyCHAMBERS
Highway SH 65 ETC
From SH 61, EAST
To 300' W. OF FM 1941
CSJ 0368-01-079
Proj ID SFT 368-1-79
Work Type SBGR WIDEN, ASB, SEAL COAT, PV MARK
 
25.232 5059975.41 0.00 5310021.69 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-18-06
Work Began 06-05-06
Work Completed  
Time Computed 05-04-06
Contract Working Days 159
Addl Days Granted 22
Working Days Charged 189
Percent Time Used 104
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0368-01-079
BATTERSON, L.L.P.(3.82%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (3.10%)
AGGREGATE TECHNOLOGIES, INC. (0.28%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(2.31%)
BINGHAM & SONS MAINTENANCE CO. (0.54%)
Contract # 03063248
Totals 5059975.41 0.00 5310021.69 99.9

CountyNEWTON
Highway SH 12
From SH 87, EAST
To SABINE RIVER BRIDGE
CSJ 0499-02-027
Proj ID STP 2008(007)
Work Type MILL, CONC REPAIR, JNT SEAL, ACP
 
2.251 2112362.95 59585.35 2257899.39 99.9
Work Order 10-16-07
Work Began 04-17-08
Work Completed  
Time Computed 11-01-07
Contract Working Days 88
Addl Days Granted 0
Working Days Charged 110
Percent Time Used 125
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0499-02-027
CRABTREE BARRICADE SYSTEMS, INC. (1.14%)
TEX OP CONSTRUCTION, LP(3.29%)
CPAV SPECIALTIES, LP ( 20.83%)
AMERICAN REMEDIATION OPTIONS, INC. (3.63%)
Contract # 09073025
Totals 2112362.95 59585.35 2257899.39 99.9

CountyORANGE
Highway SH 12
From IH 10, EAST
To FM 1132
CSJ 0499-03-046
Proj ID STP 2006(575)
Work Type GR, STR, BS, ACP PVMT, STRIPE, SIGN
 
2.693 5968267.20 256545.89 5102711.03 85.4
Work Order 01-05-07
Work Began 03-29-07
Work Completed  
Time Computed 03-01-07
Contract Working Days 522
Addl Days Granted 9
Working Days Charged 377
Percent Time Used 70
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0499-03-046
CRABTREE BARRICADE SYSTEMS, INC. (1.58%)
A & G EBERHARDT ENTERPRISES, INC.(3.12%)
AMERICAN REMEDIATION OPTIONS, INC. (0.56%)
NORMAN HIGHWAY CONSTRUCTORS, INC.( 17.40%)
WALKER CONSTRUCTION(0.41%)
CPAV SPECIALTIES, LP (0.14%)
SILVA CONTRACTING COMPANY, INC.(0.88%)
TEX OP CONSTRUCTION, LP(0.49%)
Contract # 11063205
Totals 5968267.20 256545.89 5102711.03 85.4