Monthly State Let Construction Report For Beaumont District As Of Jun 11, 2013 Page 1 Of 2

Last Update: Tuesday, June 11, 2013
FTP Icon Text Version
page 1 | page 2

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyLIBERTY
Highway US 90
From SH 61 IN DEVERS
To 4.0 MI W OF JEFFERSON CO. LINE
CSJ 0028-05-042
Proj ID STP 2013(796)MM
Work Type GR, BS, STR, PVMT, SIGN
 
5.440 20677586.40 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 540
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-05-042
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06133002
Totals 20677586.40 0.00 0.00 0.0

CountyJEFFERSON
Highway US 90 ETC
From FM 365 EAST
To 4.6 MILES(WB LANES ONLY)
CSJ 0028-06-075
Proj ID STP 2013(273)
Work Type SEAL COAT
 
185.203 8337560.81 0.00 6925158.56 83.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 02-08-13
Work Began 05-06-13
Work Completed  
Time Computed 00-00-00
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 19
Percent Time Used 31
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-06-075
CHICO TRUCKING CO., INC. (3.11%)
INTERSTATE BARRICADES & MARKINGS, INC. ( 11.56%)
Contract # 12123021
Totals 8337560.81 0.00 6925158.56 83.0

CountyORANGE
Highway IH 10
From AT NECHES RIVER BRIDGE
To (STR 002809065)
CSJ 0028-09-111
Proj ID BR 1102(477)
Work Type STR, LIGHTING
 
1.055 58877950.00 0.00 8918294.80 15.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-16-12
Work Began 06-25-12
Work Completed  
Time Computed 00-00-00
Contract Working Days 1,085
Addl Days Granted 0
Working Days Charged 269
Percent Time Used 24
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-09-111
AMERICAN REMEDIATION OPTIONS, INC. (0.06%)
ESSARY, HART & MACWILIAM,INC.(6.77%)
SCOTT DERR PAINTING CO (0.35%)
HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, CORP. (1.85%)
CARTHAGE DRILLING, INC.(0.14%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.11%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.16%)
INTERSTATE BARRICADES & MARKINGS, INC. (0.48%)
BORE TECH CONSTRUCTION, LLC(0.00%)
C PAVE, INC. (0.04%)
Contract # 02123001
Totals 58877950.00 0.00 8918294.80 15.1

CountyORANGE
Highway IH 10
From SH 62, EAST
To UP RR
CSJ 0028-11-195
Proj ID STP 2009(507)ES
Work Type GR, STR, BS, PVMT, SIGN
 
0.589 7094085.45 0.00 7503741.86 99.9
CountyORANGE
Highway IH 10
From UP RR, EAST
To ADAMS BAYOU
CSJ 0028-14-105
Proj ID STP 2009(507)ES
Work Type GR, STR, BS, PVMT, SIGN
 
1.844 31221162.85 0.00 30268326.99 96.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-22-10
Work Began 05-17-10
Work Completed  
Time Computed 05-08-10
Contract Working Days 744
Addl Days Granted 6
Working Days Charged 792
Percent Time Used 105
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-11-195
INDUS CONSTRUCTION, L.P. (7.87%)
EROSION CONTROL, INC.(0.43%)
CPAVE, INC.(1.97%)
SCOTT DERR PAINTING CO (0.23%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (1.47%)
MICA CORPORATION (3.97%)
BATTERSON, L.L.P.(0.84%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.32%)
BORING & TUNNELING COMPANY OF AMERICA, INC.(0.62%)
VAQUERO CONSTRUCTION, INC. (1.61%)
SPECIALTY DRILLING, LTD. (0.43%)
AMERICAN REMEDIATION OPTIONS, INC. (0.43%)
Contract # 02103202
Totals 38315248.30 0.00 37772068.85 97.5

CountyORANGE
Highway IH 10
From AT SH 12
To .
CSJ 0028-11-198
Proj ID IM 0108(167)
Work Type LANDSCAPE
 
0.100 119344.00 0.00 117063.00 98.0
CountyORANGE
Highway SH 12
From AT SH 62
To .
CSJ 0499-03-053
Proj ID STP 2011(122)
Work Type LANDSCAPE
 
0.100 33790.00 0.00 29940.00 88.6
CountyCHAMBERS
Highway IH 10
From AT FM 3180
To .
CSJ 0508-02-109
Proj ID IM 0108(167)
Work Type LANDSCAPE
 
0.100 124815.00 0.00 122774.00 98.3
CountyJEFFERSON
Highway IH 10
From AT FM 364
To .
CSJ 0739-02-152
Proj ID IM 0108(167)
Work Type LANDSCAPE
 
0.310 77906.00 0.00 75275.00 96.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-14-10
Work Began 10-18-10
Work Completed  
Time Computed 00-00-00
Contract Working Days 79
Addl Days Granted 0
Working Days Charged 62
Percent Time Used 78
Contractor(s)
LEGENDS LANDSCAPES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0028-11-198
LONE STAR TRAFFIC SERVICE, INC.(1.68%)
Contract # 08103020
Totals 355855.00 0.00 345052.00 96.9

CountyORANGE
Highway IH 10
From KCS RR, EAST
To SH 62
CSJ 0028-11-200
Proj ID IM 0108(183)
Work Type PAVEMENT TEXTURING
 
10.700 505343.30 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 32
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HUMBLE EQUIPMENT CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-11-200
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05133029
Totals 505343.30 0.00 0.00 0.0

CountyJEFFERSON
Highway IH 10
From 11TH ST, EAST
To PINE ST (FRONTAGE ROADS)
CSJ 0028-13-132
Proj ID IM 0108(178)
Work Type GRIND CONC PAV, FDR, & SEAL JOINTS
 
1.746 952216.95 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
INTERSTATE IMPROVEMENT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-13-132
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04133221
Totals 952216.95 0.00 0.00 0.0

CountyHARDIN
Highway US 69
From SH 326, SOUTH
To SH 327
CSJ 0200-10-073
Proj ID NH 2013(053)
Work Type GR, BS, ACP
 
2.794 2061902.12 0.00 2172848.45 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-12-12
Work Began 10-30-12
Work Completed  
Time Computed 00-00-00
Contract Working Days 38
Addl Days Granted 0
Working Days Charged 31
Percent Time Used 81
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0200-10-073
DUSTROL, INC.(6.22%)
AMERICAN REMEDIATION OPTIONS, INC. (0.03%)
CRABTREE BARRICADE SYSTEMS, INC. (6.10%)
Contract # 09123019
Totals 2061902.12 0.00 2172848.45 99.9

CountyJEFFERSON
Highway US 69
From AT SH 73
To .
CSJ 0200-16-015
Proj ID NH 2013(207)
Work Type LIGHTING
 
0.100 664902.51 35655.44 70651.94 10.6
Work Order 02-28-13
Work Began 00-00-00
Work Completed  
Time Computed 03-16-13
Contract Working Days 45
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0200-16-015
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (3.10%)
Contract # 12123224
Totals 664902.51 35655.44 70651.94 10.6

CountyLIBERTY
Highway SH 105
From SH 105 WEST OF CLEVELAND, EAST
To W OF FM 1010
CSJ 0338-12-002
Proj ID NH 2010(291)
Work Type GR, STR, BS, PAV, STRIPE, SIGN
 
2.770 26831167.84 0.00 27627090.02 99.9
CountyLIBERTY
Highway SH 105
From 0.6 MI W OF FM 1010, EAST
To 2.1 MI E OF LP 573
CSJ 0338-12-003
Proj ID NH 2010(291)
Work Type ACP
 
2.733 1554965.16 0.00 1552627.15 99.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-22-10
Work Began 05-25-10
Work Completed  
Time Computed 05-08-10
Contract Working Days 744
Addl Days Granted 0
Working Days Charged 689
Percent Time Used 92
Contractor(s)
ZACHRY CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0338-12-002
MURRAY CONSTRUCTION(0.12%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (2.20%)
STRIPES & STOPS COMPANY, INC.(0.02%)
ORP CONSTRUCTION (0.07%)
THIRD COAST SERVICES, LLC(1.09%)
L.A. UTILITIES, INC. (0.70%)
WATERS CONSTRUCTION CO., INC.(0.79%)
SMITH & COMPANY(9.34%)
HIGHWAY TECHNOLOGIES, INC. (0.36%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.29%)
HOMER TREE SERVICE, INC. (0.43%)
ATS DRILLING, L.P. (4.85%)
PANTHER CREEK TRANSPORTATION, INC. (1.72%)
A.Z. REBAR CONSTRUCTION, INC.(2.56%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.16%)
SCOTT DERR PAINTING CO (0.41%)
GLOBAL INTERNATIONAL CONSTRUCTION, INC.(0.66%)
Contract # 02103002
Totals 28386133.00 0.00 29179717.17 99.9

CountyCHAMBERS
Highway LP 207
From SH 146 (N JUNCTION)
To FM 565
CSJ 0389-10-011
Proj ID STP 2013(132)
Work Type BS, ACP, AND STRIPE
 
0.663 273524.80 0.00 315299.80 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-14-12
Work Began 04-02-13
Work Completed  
Time Computed 00-00-00
Contract Working Days 27
Addl Days Granted 0
Working Days Charged 32
Percent Time Used 118
Contractor(s)
MAIN LANE INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0389-10-011
ROADSAFE TRAFFIC SYSTEMS, INC. (2.84%)
Contract # 10123011
Totals 273524.80 0.00 315299.80 99.9

CountyCHAMBERS
Highway IH 10
From FM 565
To EAST OF TRINITY RIVER BRIDGE
CSJ 0508-02-085
Proj ID BR 2006(500)
Work Type REPLACE BRIDGE
 
2.005 62634256.64 173940.39 63300498.30 99.9
Work Order 10-13-06
Work Began 11-27-06
Work Completed  
Time Computed 10-30-06
Contract Working Days 1,191
Addl Days Granted 92
Working Days Charged 1,449
Percent Time Used 112
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0508-02-085
SCOTT DERR PAINTING CO (0.03%)
A & G EBERHARDT ENTERPRISES, INC.(1.35%)
WILLOW CITY SIGN & RAIL, INC.(0.29%)
BATTERSON, L.L.P.(0.18%)
EROSION CONTROL, INC.(0.36%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.28%)
ESSARY, HART & MACWILIAM,INC.(8.93%)
APPLIED FOUNDATION TESTING, INC. (0.12%)
MASTERPIECE GRINDING & GROOVING, LLC (0.08%)
PENHALL COMPANY(0.12%)
ENGINEERED EXPLOSIVE SERVICES(0.08%)
Contract # 09063224
Totals 62634256.64 173940.39 63300498.30 99.9

CountyCHAMBERS
Highway IH 10
From 2.3 MI W OF FM 1410
To .
CSJ 0508-03-091
Proj ID IM 0108(168)
Work Type GR, BS, PVMT, STR
 
1.003 2502870.88 0.00 2524808.89 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-21-10
Work Began 12-19-11
Work Completed  
Time Computed 00-00-00
Contract Working Days 90
Addl Days Granted 8
Working Days Charged 213
Percent Time Used 217
Contractor(s)
ROZCO CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0508-03-091
NATIONAL FENCE CO. (0.94%)
ALLSTATE SIGNAL & CONSTRUCTION, LLC(6.57%)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.89%)
GUTHRIE BUILDINGS, INC.(2.73%)
SILVA CONTRACTING COMPANY, INC.(6.72%)
HIGHWAY TECHNOLOGIES, INC. (0.55%)
THE ANCHOR GROUP, INC. (0.53%)
ERECT RIGHT CORPORATION(0.36%)
PFEIFFER & SON LTD.(4.44%)
KOSSMAN CONTRACTING CO., INC.(0.13%)
Contract # 08103229
Totals 2502870.88 0.00 2524808.89 99.9

CountyJEFFERSON
Highway SH 73
From TAYLORS BAYOU
To WEST TO CHAMBERS CO/L
CSJ 0508-04-161
Proj ID STP 2013(523)
Work Type ACP, SHLDR TEXTURE
 
19.022 5990046.56 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 52
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0508-04-161
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04133018
Totals 5990046.56 0.00 0.00 0.0

CountyNEWTON
Highway FM 363
From AT THICKETY CREEK
To (STR 062703004)
CSJ 0627-03-024
Proj ID STP 2012(537)
Work Type GR, BS, OCST, ACP, STR
 
0.941 3877298.91 333562.63 2134663.23 55.0
Work Order 07-12-12
Work Began 08-15-12
Work Completed  
Time Computed 07-28-12
Contract Working Days 237
Addl Days Granted 0
Working Days Charged 166
Percent Time Used 70
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0627-03-024
HOUSTON SAWING & DRILLING(0.09%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (5.00%)
DUSTROL, INC.(2.21%)
CRABTREE BARRICADE SYSTEMS, INC. (1.06%)
NORMAN HIGHWAY CONSTRUCTORS, INC.(5.72%)
AMERICAN REMEDIATION OPTIONS, INC. (3.02%)
MESA ROD BUSTERS, INC. (0.35%)
Contract # 05123040
Totals 3877298.91 333562.63 2134663.23 55.0

CountyCHAMBERS
Highway IH 10
From 0.210 MI WEST OF FM 1663, EAST
To JEFFERSON CO/L
CSJ 0739-01-045
Proj ID IM 0108(176)
Work Type PLANE, MBGF, PFC
 
2.528 1179835.95 0.00 0.00 0.0
CountyJEFFERSON
Highway IH 10
From CHAMBERS CO/L, EAST
To 0.65 MI E OF FM 365
CSJ 0739-02-147
Proj ID IM 0108(176)
Work Type PLANE, MBGF, PFC, UPGRADE BRIDGE RAIL
 
8.022 3506970.90 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-10-13
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 171
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0739-01-045
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02133208
Totals 4686806.85 0.00 0.00 0.0

CountyLIBERTY
Highway FM 686
From FM 1960, EAST
To 2.4 MI
CSJ 0762-01-029
Proj ID STP 2013(183)
Work Type BS, ACP, OCST, STRIPE
 
2.363 824500.11 0.00 586589.11 71.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-30-12
Work Began 03-19-13
Work Completed  
Time Computed 00-00-00
Contract Working Days 36
Addl Days Granted 0
Working Days Charged 22
Percent Time Used 61
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0762-01-029
WILLOW CITY SIGN & RAIL, INC.(1.64%)
CRABTREE BARRICADE SYSTEMS, INC. (0.40%)
WATERS CONSTRUCTION CO., INC.(9.19%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.13%)
ROADSAFE TRAFFIC SYSTEMS, INC. (1.92%)
Contract # 11123218
Totals 824500.11 0.00 586589.11 71.1

CountyLIBERTY
Highway FM 1960
From FM 686, EAST
To SH 321
CSJ 0762-01-031
Proj ID STP 2013(184)
Work Type ACP, STRIPE
 
6.060 2286545.89 315674.13 842661.15 36.8
CountyLIBERTY
Highway FM 1960
From 1.2 MI W OF FM 686
To FM 686
CSJ 1685-04-022
Proj ID STP 2013(184)
Work Type GR, BS, ACP, STRIPE
 
1.142 518864.00 29059.05 144301.44 27.8
Work Order 01-29-13
Work Began 02-25-13
Work Completed  
Time Computed 02-14-13
Contract Working Days 96
Addl Days Granted 0
Working Days Charged 58
Percent Time Used 60
Contractor(s)
SMITH & COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0762-01-031
CRABTREE BARRICADE SYSTEMS, INC. (2.36%)
WILLOW CITY SIGN & RAIL, INC.(0.72%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(1.93%)
MURRAY CONSTRUCTION(1.75%)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.30%)
WEST TEXAS RUMBLE STRIP(0.34%)
Contract # 11123014
Totals 2805409.89 344733.18 986962.59 35.1

CountyORANGE
Highway FM 105
From FM 1135, SOUTH
To 0.68 MI W OF FM 408
CSJ 0883-02-074
Proj ID STP 2013(524)
Work Type GR, BS, ACP, MBGF, STR, STRIPE
 
4.189 4197094.08 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 135
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0883-02-074
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04133023
Totals 4197094.08 0.00 0.00 0.0

CountyJEFFERSON
Highway VA
From DISTRICTWIDE
To .
CSJ 0920-00-105
Proj ID STP 1102(164)
Work Type LANDSCAPE
 
1.150 702815.00 0.00 582081.50 82.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-25-11
Work Began 10-24-11
Work Completed  
Time Computed 00-00-00
Contract Working Days 120
Addl Days Granted 0
Working Days Charged 69
Percent Time Used 57
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-00-105
CRABTREE BARRICADE SYSTEMS, INC. (1.77%)
CLASSIC TEJAS CONSTRUCTION, INC. (1.28%)
Contract # 07113230
Totals 702815.00 0.00 582081.50 82.8

page 1 | page 2