MIS.CIS.19 MONTHLY STATE LET CONSTRUCTION REPORT DISTRICT 20 AS OF DEC 11, 2008 PAGE 57 ************************************************************************************************************************************ * | | CONTRACT | AMOUNT THIS | TOTAL ESTIMATE | % * * CONTRACT IDENTIFICATION AND INFORMATION | LENGTH | AMOUNT | ESTIMATE | TO DATE | COMP* ************************************************************************************************************************************ CHAMBERS SH 146, SOUTH | 4.218 | 6,969,743.18| 0.00| 7,226,766.55| 99.9| FM 1405 SH 99 | | | | | | 1024-02-038 | | | | | | STP 2006(479) GR, FLEX BS, ASB, ACP, PAV REPAIR | | | | | | | | | | | | WORK ORDER- 06-29-06 WORK BEGAN- 08-14-06 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 07-15-06 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 128 ADDL DAYS GRANTED- 6 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 166 PERCENT TIME USED- 123 | |**************************************************| | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1024-02-038 | | | | | | BATTERSON, L.L.P. | |SUB %: 2.09 | | | | APAC-TEXAS, INC. | |SUB %: 16.98 | | | | J & M CONTRACTING, COMPANY | |SUB %: 5.61 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 1.36 | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 0.80 | | | | TRAF-TEX, INC. | |SUB %: 0.11 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.11 | | | | | | | | | | CONTRACT 05063209 | TOTALS | 6,969,743.18| 0.00| 7,226,766.55| 99.9| ************************************************************************************************************************************ CHAMBERS NEAR THE TRINITY RIVER BRIDGE | 6.530 | 64,980,062.39| 1,780,498.82| 62,007,008.00| 99.4| IH 10 SH 61 | | | | | | 0508-02-086 | | | | | | NH 2005(481) GR, STRS, BASE & PAV | | | | | | | | | | | | WORK ORDER- 08-18-05 WORK BEGAN- 09-19-05 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-03-05 | | | | | | CONTRACT WORKING DAYS- 1,078 ADDL DAYS GRANTED- 206 | | | | | | WORKING DAYS CHARGED- 805 PERCENT TIME USED- 62 | | | | | | | | | | | | W.W. WEBBER INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0508-02-086 | | | | | | UNITED RENTALS GULF L.P. | |SUB %: 0.10 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.01 | | | | MB WESTERN INDUSTRIAL CONTRACTING | |SUB %: 0.69 | | | | MAGNUM TUNNELING, LLC | |SUB %: 0.01 | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 1.62 | | | | SOUTHWEST SIGN & RAIL | |SUB %: 0.63 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 7.84 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 1.41 | | | | EROSION CONTROL, INC. | |SUB %: 0.12 | | | | M. D. JOHNSON TRACTOR SERVICE, INC. | |SUB %: 0.04 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.04 | | | | HUBCO, INC. | |SUB %: 0.06 | | | | MTAM CORPORATION | |SUB %: 0.00 | | | | | | | | | | CONTRACT 06053001 | TOTALS | 64,980,062.39| 1,780,498.82| 62,007,008.00| 99.4| ************************************************************************************************************************************ CHAMBERS AT CEDAR GULLY | 0.101 | 696,807.90| 18,673.58| 573,970.22| 98.1| FM 2354 (STR 224202003) | | | | | | 2242-02-012 | | | | | | BR 2006(458) STR | | | | | | | | | | | | WORK ORDER- 07-12-07 WORK BEGAN- 08-14-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-28-07 | | | | | | CONTRACT WORKING DAYS- 81 ADDL DAYS GRANTED- 5 | | | | | | WORKING DAYS CHARGED- 269 PERCENT TIME USED- 312 | | | | | | | | | | | | SURETEC INSURANCE COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2242-02-012 | | | | | | LONE STAR CONSTRUCTION | |SUB %: 0.00 | | | | WORK ZONE PRODUCTS, INC. | |SUB %: 1.20 | | | | ODUM SERVICES, L.P. | |SUB %: 5.18 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 1.52 | | | | CPAV SPECIALTIES, LP | |SUB %: 0.07 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.12 | | | | PENHALL COMPANY | |SUB %: 0.35 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.26 | | | | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | |SUB %: 7.74 | | | | | | | | | | CONTRACT 06073208 | TOTALS | 696,807.90| 18,673.58| 573,970.22| 98.1| ************************************************************************************************************************************ CHAMBERS FM 565, SOUTH | 12.518 | 4,985,705.09| 32,340.00| 5,622,666.89| 99.9| FM 565 ETC 0.7 MI S OF FM 3180 | | | | | | 1024-01-061 | | | | | | SFT 1024-1-61 SBGR WIDEN, ASB, SEAL COAT, PV MARK | | | | | | | | | | | | WORK ORDER- 09-08-06 WORK BEGAN- 11-27-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-24-06 | | | | | | CONTRACT WORKING DAYS- 140 ADDL DAYS GRANTED- 11 | | | | | | WORKING DAYS CHARGED- 150 PERCENT TIME USED- 99 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1024-01-061 | | | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 2.13 | | | | SEDIMENT & EROSION CONTROL, INC. | |SUB %: 1.91 | | | | AGGREGATE TECHNOLOGIES, INC. | |SUB %: 0.18 | | | | SEMARCK LANDSCAPE SERVICES, INC. | |SUB %: 0.86 | | | | BINGHAM & SONS MAINTENANCE CO. | |SUB %: 0.09 | | | | | | | | | | CONTRACT 08063256 | TOTALS | 4,985,705.09| 32,340.00| 5,622,666.89| 99.9| ************************************************************************************************************************************ CHAMBERS POSKEY RD AT ANAHUAC DITCH | 0.103 | 287,252.30| 0.00| 221,801.30| 96.7| CR (STR AA0157001) | | | | | | 0920-39-018 | | | | | | BR 2006(456) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 09-05-07 WORK BEGAN- 11-12-07 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 09-21-07 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 73 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 198 PERCENT TIME USED- 271 | |**************************************************| | | | | | | | RDV, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0920-39-018 | | | | | | CRAWFORD YANT | |SUB %: 3.96 | | | | ODUM SERVICES, L.P. | |SUB %: 5.92 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 1.04 | | | | DIAMOND K EQUIPMENT INC. | |SUB %: 87.41 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 0.62 | | | | | | | | | | CONTRACT 08073037 | TOTALS | 287,252.30| 0.00| 221,801.30| 96.7| ************************************************************************************************************************************ CHAMBERS FM 565 | 2.005 | 62,634,256.64| 1,618,180.65| 33,464,316.68| 53.4| IH 10 EAST OF TRINITY RIVER BRIDGE | | | | | | 0508-02-085 | | | | | | BR 2006(500) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 10-13-06 WORK BEGAN- 11-27-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-29-06 | | | | | | CONTRACT WORKING DAYS- 1,191 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 561 PERCENT TIME USED- 47 | | | | | | | | | | | | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0508-02-085 | | | | | | SCOTT DERR PAINTING CO | |SUB %: 0.03 | | | | A & G EBERHARDT ENTERPRISES, INC. | |SUB %: 1.35 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.29 | | | | BATTERSON, L.L.P. | |SUB %: 0.18 | | | | EROSION CONTROL, INC. | |SUB %: 0.36 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.28 | | | | ESSARY, HART & MACWILIAM,INC. | |SUB %: 8.93 | | | | APPLIED FOUNDATION TESTING, INC. | |SUB %: 0.12 | | | | | | | | | | CONTRACT 09063224 | TOTALS | 62,634,256.64| 1,618,180.65| 33,464,316.68| 53.4| ************************************************************************************************************************************ HARDIN FM 770 (EAST JUNCTION), EAST | 14.880 | 2,280,226.47| 121,542.61| 3,012,724.12| 99.9| SH 105 0.762 MI WEST OF SH 326 | | | | | | 0339-03-034 | | | | | | NH 2008(477) ACP, STRIPE | | | | | | | | | | | | WORK ORDER- 05-12-08 WORK BEGAN- 06-26-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-28-08 | | | | | | CONTRACT WORKING DAYS- 48 ADDL DAYS GRANTED- 13 | | | | | | WORKING DAYS CHARGED- 28 PERCENT TIME USED- 45 | | | | | | | | | | | | SMITH & COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0339-03-034 | | | | | | BATTERSON, L.L.P. | |SUB %: 0.57 | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 3.25 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 1.59 | | | | WATERS CONSTRUCTION CO., INC. | |SUB %: 18.80 | | | | | | | | | | CONTRACT 04083207 | TOTALS | 2,280,226.47| 121,542.61| 3,012,724.12| 99.9| ************************************************************************************************************************************ HARDIN MILL CREEK, EAST | 2.508 | 1,058,619.29| 0.00| 594,788.68| 56.1| SH 327 BU 96F IN SILSBEE | | | | | | 0602-01-043 | | | | | | STP 2008(571) ACP, BASE, STRIPE, OCST | | | | | | | | | | | | HARDIN LIBERTY CO/L, EAST | 5.718 | 1,371,985.79| 0.00| 1,476,898.66| 99.9| FM 787 FM 1293 | | | | | | 0813-02-035 | | | | | | STP 2008(571) GR, BASE, ACP, STRIPE | | | | | | | | | | | | WORK ORDER- 06-13-08 WORK BEGAN- 08-22-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 83 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0602-01-043 | | | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 3.09 | | | | JMHP, INC. | |SUB %: 1.71 | | | | SEAMARCK LANDSCAPE SERVICES, INC | |SUB %: 0.59 | | | | | | | | | | CONTRACT 05083208 | TOTALS | 2,430,605.08| 0.00| 2,071,687.34| 85.2| ************************************************************************************************************************************ HARDIN COOKS RD AT BRANCH | 0.100 | 341,314.70| 104,329.94| 258,372.25| 75.6| CR (STR AA0536001) | | | | | | 0920-03-067 | | | | | | BR 2007(760) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 07-21-08 WORK BEGAN- 10-03-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-06-08 | | | | | | CONTRACT WORKING DAYS- 32 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 29 PERCENT TIME USED- 90 | | | | | | | | | | | | NORMAN HIGHWAY CONSTRUCTORS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0920-03-067 | | | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 1.33 | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 6.91 | | | | | | | | | | CONTRACT 06083223 | TOTALS | 341,314.70| 104,329.94| 258,372.25| 75.6| ************************************************************************************************************************************ JASPER UPRR IN BUNA, EAST | 3.921 | 773,790.28| 0.00| 491,018.68| 63.7| FM 253 NEWTON CO/L | | | | | | 0947-01-018 | | | | | | STP 2008(277) ACP, STRIPE | | | | | | | | | | | | WORK ORDER- 02-20-08 WORK BEGAN- 08-11-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-07-08 | | | | | | CONTRACT WORKING DAYS- 13 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 17 PERCENT TIME USED- 130 | | | | | | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0947-01-018 | | | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 2.95 | | | | | | | | | | CONTRACT 01083032 | TOTALS | 773,790.28| 0.00| 491,018.68| 63.7| ************************************************************************************************************************************ JASPER ETC AT MILL CREEK | 8.597 | 977,617.15| 0.00| 0.00| 0.0| US 96 ETC (STR 006407060) | | | | | | 0064-07-038 | | | | | | NH 2009(150) BRIDGE RAIL, MBGF, RIPRAP | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 250 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | MANN CONTRACTORS, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0064-07-038 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12083212 | TOTALS | 977,617.15| 0.00| 0.00| 0.0| ************************************************************************************************************************************ JEFFERSON DISTRICTWIDE | 163.084 | 348,302.36| 0.00| 332,821.25| 95.5| VA . | | | | | | 0920-00-084 | | | | | | C 920-00-84 STRIPE, | | | | | | | | | | | | WORK ORDER- 03-18-08 WORK BEGAN- 06-03-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-03-08 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 54 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 47 PERCENT TIME USED- 87 | |**************************************************| | | | | | | | CRABTREE BARRICADE SYSTEMS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0920-00-084 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 02083211 | TOTALS | 348,302.36| 0.00| 332,821.25| 95.5| ************************************************************************************************************************************ JEFFERSON US 90, EAST | 1.571 | 9,794,825.72| 187,920.12| 4,186,571.48| 42.7| IH 10 HOLLYWOOD AVE (FRONTAGE ROADS) | | | | | | 0028-13-124 | | | | | | IM 0108(162) GR, BS, ASB, ACP | | | | | | | | | | | | WORK ORDER- 08-14-07 WORK BEGAN- 10-09-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-30-07 | | | | | | CONTRACT WORKING DAYS- 455 ADDL DAYS GRANTED- 5 | | | | | | WORKING DAYS CHARGED- 255 PERCENT TIME USED- 55 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0028-13-124 | | | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.66 | | | | ANTIGO CONSTRUCTION, INC. | |SUB %: 0.33 | | | | CPAV SPECIALTIES, LP | |SUB %: 0.77 | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 2.97 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 0.47 | | | | HOLLIER CONSTRUCTION CO. | |SUB %: 2.12 | | | | NORMAN HIGHWAY CONSTRUCTORS, INC. | |SUB %: 13.93 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 1.19 | | | | DAVIS TREE EXPERTS | |SUB %: 0.00 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.13 | | | | | | | | | | CONTRACT 03073006 | TOTALS | 9,794,825.72| 187,920.12| 4,186,571.48| 42.7| ************************************************************************************************************************************ JEFFERSON FRONTAGE ROADS AT NEDERLAND AVE | 0.289 | 2,081,665.50| 9,258.17| 2,203,730.49| 99.9| US 69 . | | | | | | 0200-15-015 | | | | | | CM 2007(475) GR, BS, STR, PVMT | | | | | | | | | | | | WORK ORDER- 07-12-07 WORK BEGAN- 08-15-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-28-07 | | | | | | CONTRACT WORKING DAYS- 115 ADDL DAYS GRANTED- 14 | | | | | | WORKING DAYS CHARGED- 166 PERCENT TIME USED- 128 | | | | | | | | | | | | ALLCO, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0200-15-015 | | | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 2.52 | | | | TRAF-TEX, INC. | |SUB %: 4.17 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.05 | | | | TREVCON, INC. | |SUB %: 22.62 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.84 | | | | CREATIVE CONCRETE SURFACE | |SUB %: 6.69 | | | | BUILT BY TRUE VALUE LLC | |SUB %: 2.53 | | | | LAKE AREA CONCRETE, LLC | |SUB %: 4.55 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 0.37 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.14 | | | | | | | | | | CONTRACT 05073022 | TOTALS | 2,081,665.50| 9,258.17| 2,203,730.49| 99.9| ************************************************************************************************************************************ JEFFERSON HARDIN & JEFFERSON COUNTIES | 0.100 | 1,445,835.00| 217,047.95| 833,564.19| 57.6| VA . | | | | | | 0920-00-081 | | | | | | STP 2008(706) ADA CURB RAMP IMPROVEMENTS | | | | | | | | | | | | WORK ORDER- 06-11-08 WORK BEGAN- 08-12-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-27-08 | | | | | | CONTRACT WORKING DAYS- 234 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 68 PERCENT TIME USED- 29 | | | | | | | | | | | | ENCINO LANDSCAPE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0920-00-081 | | | | | | ACTION SERVICES | |SUB %: 2.41 | | | | | | | | | | CONTRACT 05083010 | TOTALS | 1,445,835.00| 217,047.95| 833,564.19| 57.6| ************************************************************************************************************************************ JEFFERSON CR 257 AT MAYHAW BAYOU | 0.179 | 779,147.20| 15,000.00| 109,054.90| 13.9| CR (STR# AA0257001) | | | | | | 0920-38-201 | | | | | | BR 2007(384) REPLACE BRIDGE | | | | | | | | | | | | WORK ORDER- 06-24-08 WORK BEGAN- 10-27-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-10-08 | | | | | | CONTRACT WORKING DAYS- 191 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 26 PERCENT TIME USED- 13 | | | | | | | | | | | | AJAX EQUIPMENT COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0920-38-201 | | | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 6.93 | | | | ODUM SERVICES, L.P. | |SUB %: 7.06 | | | | MCILVAIN ENTERPRISES, INC. | |SUB %: 3.42 | | | | | | | | | | CONTRACT 05083015 | TOTALS | 779,147.20| 15,000.00| 109,054.90| 13.9| ************************************************************************************************************************************ JEFFERSON ON MAIN AVE FROM SH 73 | 0.417 | 509,806.60| 22,788.40| 491,407.42| 96.3| CS 39TH ST | | | | | | 0920-38-176 | | | | | | CM 2006(743) GR, STR, BS, PVMT | | | | | | | | | | | | WORK ORDER- 06-12-08 WORK BEGAN- 07-10-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 06-28-08 | | | | | | CONTRACT WORKING DAYS- 80 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 55 PERCENT TIME USED- 68 | | | | | | | | | | | | DOUGHTIE CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0920-38-176 | | | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 2.30 | | | | DUSTROL, INC. | |SUB %: 2.63 | | | | APAC-TEXAS, INC. | |SUB %: 25.72 | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 3.42 | | | | | | | | | | CONTRACT 05083017 | TOTALS | 509,806.60| 22,788.40| 491,407.42| 96.3| ************************************************************************************************************************************ JEFFERSON AT MAIN B CANAL | 1.440 | 5,358,305.70| 275,746.00| 1,929,194.66| 36.0| US 69 (STR 020016142) | | | | | | 0200-16-009 | | | | | | BR 2008(570) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 07-02-08 WORK BEGAN- 08-13-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 07-18-08 | | | | | | CONTRACT WORKING DAYS- 295 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 50 PERCENT TIME USED- 16 | | | | | | | | | | | | DOUGHTIE CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0200-16-009 | | | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.94 | | | | JUST GROOVING, LTD. | |SUB %: 0.08 | | | | TOM-MAC, INC. | |SUB %: 3.55 | | | | CTF STRIPING | |SUB %: 0.42 | | | | D & E CONTRACTORS | |SUB %: 0.83 | | | | JEFFERSON ELECTRIC COMPANY, INC. | |SUB %: 0.04 | | | | HIGHWAY TECHNOLOGIES, L.P. | |SUB %: 0.58 | | | | ANGEL BROTHERS ENTERPRISES, LTD. | |SUB %: 15.13 | | | | | | | | | | CONTRACT 05083203 | TOTALS | 5,358,305.70| 275,746.00| 1,929,194.66| 36.0| ************************************************************************************************************************************ JEFFERSON WALDEN RD | 0.265 | 243,568.75| 0.00| 256,569.95| 99.9| IH 10 PORT ARTHUR FRESH WATER CANAL | | | | | | 0739-02-135 | | | | | | CC 739-2-135 GR, BS, PVMT | | | | | | | | | | | | WORK ORDER- 07-14-08 WORK BEGAN- 08-11-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 07-30-08 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 28 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 29 PERCENT TIME USED- 103 | |**************************************************| | | | | | | | WIDGEON CONSTRUCTION, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0739-02-135 | | | | | | A & G EBERHARDT ENTERPRISES, INC. | |SUB %: 8.10 | | | | APAC-TEXAS, INC. | |SUB %: 20.21 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 7.15 | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 17.91 | | | | HOLLIER CONSTRUCTION CO. | |SUB %: 2.26 | | | | | | | | | | CONTRACT 06083226 | TOTALS | 243,568.75| 0.00| 256,569.95| 99.9| ************************************************************************************************************************************ JEFFERSON AT SABINE LAKE | 0.953 | 21,341,242.05| 768,467.49| 8,178,249.44| 38.3| SH 82 AT MOUTH OF SABINE RIVER | | | | | | 2367-01-036 | | | | | | ER 2007(137) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 10-16-07 WORK BEGAN- 12-17-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-01-07 | | | | | | CONTRACT WORKING DAYS- 574 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 212 PERCENT TIME USED- 36 | | | | | | | | | | | | AUSTIN BRIDGE & ROAD, LP | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 2367-01-036 | | | | | | A & G EBERHARDT ENTERPRISES, INC. | |SUB %: 0.25 | | | | BREDA COMPANY, INC. | |SUB %: 0.98 | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 0.24 | | | | DGI-MENARD, INC. | |SUB %: 0.19 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.10 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.12 | | | | HIGHWAY TECHNOLOGIES, L.P. | |SUB %: 0.21 | | | | ODUM SERVICES, L.P. | |SUB %: 0.20 | | | | NORTHWEST MATERIALS | |SUB %: 0.02 | | | | | | | | | | CONTRACT 09073242 | TOTALS | 21,341,242.05| 768,467.49| 8,178,249.44| 38.3| ************************************************************************************************************************************ JEFFERSON AT MAIN A CANAL (SOUTHBOUND) | 0.075 | 878,738.00| 0.00| 21,613.50| 2.4| SH 347 (STR 066701006) | | | | | | 0667-01-108 | | | | | | BR 2009(011) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 10-10-08 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 100 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | AJAX EQUIPMENT COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0667-01-108 | | | | | | SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC | |SUB %: 3.88 | | | | HIGHWAY TECHNOLOGIES | |SUB %: 1.70 | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 13.19 | | | | STOMPER DEMOLITION COMPANY, INC. | |SUB %: 3.79 | | | | | | | | | | CONTRACT 09083219 | TOTALS | 878,738.00| 0.00| 21,613.50| 2.4| ************************************************************************************************************************************ JEFFERSON LAUREL AVE IN BEAUMONT, EAST | 0.351 | 1,408,452.95| 0.00| 0.00| 0.0| US 90 NORTH ST (ALONG WILLOW ST) | | | | | | 0028-07-051 | | | | | | HP 2008(818) LANDSCAPING | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 167 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ENCINO LANDSCAPE, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0028-07-051 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 11083212 | TOTALS | 1,408,452.95| 0.00| 0.00| 0.0| ************************************************************************************************************************************ JEFFERSON ETC 8.1 MI W OF FM 364, EAST | 191.251 | 5,793,195.76| 0.00| 0.00| 0.0| US 90 ETC FM 364 | | | | | | 0028-06-068 | | | | | | CPM 28-6-68 SEAL COAT | | | | | | | | | | | | WORK ORDER- 01-03-08 WORK BEGAN- 04-28-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 76 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | J-W PAYNE CONSTRUCTION COMPANY, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0028-06-068 | | | | | | HIGHWAY TECHNOLOGIES | |SUB %: 0.48 | | | | | | | | | | CONTRACT 12073008 | TOTALS | 5,793,195.76| 0.00| 0.00| 0.0| ************************************************************************************************************************************ JEFFERSON ETC NEAR FM 365 (OUTFALL DITCH), EAST | 37.853 | 5,646,455.15| 222,070.47| 1,214,301.02| 21.5| IH 10 ETC WALDEN RD | | | | | | 0739-02-139 | | | | | | IM 0108(165) ACP, STRIPE | | | | | | | | | | | | WORK ORDER- 01-03-08 WORK BEGAN- 04-16-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-19-08 | | | | | | CONTRACT WORKING DAYS- 112 ADDL DAYS GRANTED- 2 | | | | | | WORKING DAYS CHARGED- 62 PERCENT TIME USED- 54 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0739-02-139 | | | | | | WIDGEON CONSTRUCTION, INC. | |SUB %: 4.25 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.54 | | | | SURFACE PREPARATION TECHNOLOGIES, INC. | |SUB %: 0.29 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.48 | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 1.69 | | | | | | | | | | CONTRACT 12073205 | TOTALS | 5,646,455.15| 222,070.47| 1,214,301.02| 21.5| ************************************************************************************************************************************ JEFFERSON ETC 0.3 MI W OF FM 1009, EAST | 215.733 | 10,426,103.25| 0.00| 0.00| 0.0| US 90 ETC 2.3 MI | | | | | | 0028-06-069 | | | | | | STP 2009(148) SEAL COAT | | | | | | | | | | | | WORK ORDER- 00-00-00 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 117 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | CLARK CONSTRUCTION OF TEXAS, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0028-06-069 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 12083001 | TOTALS | 10,426,103.25| 0.00| 0.00| 0.0| ************************************************************************************************************************************ LIBERTY SAN JACINTO CO/L, SOUTH | 4.700 | 699,801.75| 105,241.43| 356,469.56| 50.9| US 59 LP 573 (NORTH JCT) | | | | | | 0177-03-088 | | | | | | STP 2008(275)HES MEDIAN BARRIER | | | | | | | | | | | | WORK ORDER- 02-20-08 WORK BEGAN- 08-04-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-07-08 | | | | | | CONTRACT WORKING DAYS- 74 ADDL DAYS GRANTED- 6 | | | | | | WORKING DAYS CHARGED- 53 PERCENT TIME USED- 66 | | | | | | | | | | | | SCR CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0177-03-088 | | | | | | CRAWFORD YANT | |SUB %: 1.82 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 2.38 | | | | QUALITY TRAFFIC SERVICES, L.L.C. | |SUB %: 0.77 | | | | | | | | | | CONTRACT 01083029 | TOTALS | 699,801.75| 105,241.43| 356,469.56| 50.9| ************************************************************************************************************************************ LIBERTY AT UP RR | 0.909 | 1,130,916.45| 88,820.17| 614,389.27| 54.3| SH 321 . | | | | | | 0593-01-089 | | | | | | BR 2007(764) STR, PAV | | | | | | | | | | | | WORK ORDER- 03-05-08 WORK BEGAN- 00-00-00 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-21-08 | | | | | | CONTRACT WORKING DAYS- 144 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 74 PERCENT TIME USED- 51 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0593-01-089 | | | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 3.49 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 5.17 | | | | CRAWFORD YANT | |SUB %: 0.79 | | | | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | |SUB %: 1.24 | | | | HEMPHILL PILE DRIVING CO., A CORP. | |SUB %: 7.76 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 4.61 | | | | W.W. WEBBER, LLC | |SUB %: 5.58 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.24 | | | | MESA ROD BUSTERS, INC. | |SUB %: 0.90 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.07 | | | | | | | | | | CONTRACT 01083229 | TOTALS | 1,130,916.45| 88,820.17| 614,389.27| 54.3| ************************************************************************************************************************************ LIBERTY AT OLD RIVER DRAIN | 0.586 | 3,615,600.18| 190,629.58| 1,746,465.17| 48.3| FM 1409 (STR 076202005) | | | | | | 0762-02-040 | | | | | | BR 2008(372) GR, BS, PVMT, STR | | | | | | | | | | | | WORK ORDER- 04-14-08 WORK BEGAN- 05-09-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-30-08 | | | | | | CONTRACT WORKING DAYS- 180 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 93 PERCENT TIME USED- 51 | | | | | | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0762-02-040 | | | | | | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | |SUB %: 9.62 | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 0.90 | | | | CRAWFORD YANT | |SUB %: 0.97 | | | | MESA ROD BUSTERS, INC. | |SUB %: 4.51 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.14 | | | | S & S BRIDGE PAINTING, INC. | |SUB %: 0.15 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.29 | | | | ODUM SERVICES, L.P. | |SUB %: 0.59 | | | | W. W. FOUNDATION DRILLING, LTD. | |SUB %: 6.00 | | | | DAYTON SAND, CLAY AND CONSTRUCTION | |SUB %: 1.17 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.02 | | | | | | | | | | CONTRACT 02083003 | TOTALS | 3,615,600.18| 190,629.58| 1,746,465.17| 48.3| ************************************************************************************************************************************ LIBERTY HARRIS COUNTY LINE, EAST | 16.820 | 9,781,392.66| 0.00| 9,604,362.62| 99.0| US 90 UP RR IN DAYTON | | | | | | 0028-03-099 | | | | | | STP 2007(308) MILL, ACP | | | | | | | | | | | | WORK ORDER- 04-11-07 WORK BEGAN- 06-27-07 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 179 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0028-03-099 | | | | | | BATTERSON, L.L.P. | |SUB %: 2.26 | | | | CPAV SPECIALTIES, LP | |SUB %: 7.02 | | | | AGGREGATE TECHNOLOGIES, INC. | |SUB %: 11.88 | | | | | | | | | | CONTRACT 03073004 | TOTALS | 9,781,392.66| 0.00| 9,604,362.62| 99.0| ************************************************************************************************************************************ LIBERTY ETC SAN JACINTO CO/L, SOUTH | 52.791 | 5,437,376.22| 0.00| 0.00| 0.0| FM 2025 ETC LP 573 | | | | | | 1459-03-011 | | | | | | STP 2008(403) ACP, STRIPE | | | | | | | | | | | | WORK ORDER- 04-16-08 WORK BEGAN- 05-20-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 128 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | W.W. WEBBER, LLC | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1459-03-011 | | | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 16.14 | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 4.57 | | | | | | | | | | CONTRACT 03083203 | TOTALS | 5,437,376.22| 0.00| 0.00| 0.0| ************************************************************************************************************************************ LIBERTY AT EAST FORK OF SAN JACINTO RIVER | 0.554 | 3,521,530.26| 0.00| 3,754,364.08| 99.9| SH 105 . | | | | | | 0338-05-016 | | | | | | BR 2007(391) STR, PAV | | | | | | | | | | | | WORK ORDER- 06-20-07 WORK BEGAN- 07-16-07 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 07-06-07 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 231 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 223 PERCENT TIME USED- 96 | |**************************************************| | | | | | | | LONE STAR ROAD CONSTRUCTION, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0338-05-016 | | | | | | BATTERSON, L.L.P. | |SUB %: 0.23 | | | | ENVIRONMENTAL ALLIES, L.P. | |SUB %: 0.14 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 11.56 | | | | CAPROCK SPECIALITY CONTRACTORS | |SUB %: 0.25 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.90 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.09 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 0.71 | | | | CRAWFORD YANT | |SUB %: 0.13 | | | | HAYDEN PAVING | |SUB %: 4.84 | | | | MARTINEZ STEEL | |SUB %: 4.28 | | | | THIRD COAST SERVICES, LLC | |SUB %: 0.08 | | | | AGGREGATE TECHNOLOGIES, INC. | |SUB %: 0.42 | | | | | | | | | | CONTRACT 04073223 | TOTALS | 3,521,530.26| 0.00| 3,754,364.08| 99.9| ************************************************************************************************************************************ LIBERTY AT WHITES BAYOU | 0.133 | 541,765.10| 161,503.40| 368,329.00| 67.9| FM 1410 (STR 142001003) | | | | | | 1420-01-016 | | | | | | BR 2008(482) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 05-12-08 WORK BEGAN- 07-07-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-28-08 | | | | | | CONTRACT WORKING DAYS- 150 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 89 PERCENT TIME USED- 59 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1420-01-016 | | | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 2.18 | | | | ODUM SERVICES, L.P. | |SUB %: 6.78 | | | | QUALITY TRAFFIC SERVICES, L.L.C. | |SUB %: 0.64 | | | | WIMS ENVIRONMENTAL CONSTRUCTION, LTD. | |SUB %: 5.77 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.43 | | | | | | | | | | CONTRACT 04083026 | TOTALS | 541,765.10| 161,503.40| 368,329.00| 67.9| ************************************************************************************************************************************ LIBERTY SH 321, EAST | 16.394 | 14,615,985.01| 1,481,395.71| 13,742,575.24| 94.0| SH 105 EAST END OF TRINITY RIVER BRIDGE | | | | | | 0951-01-061 | | | | | | NH 2007(577) GR, BS, PVMT, STRUCTURE, SIGN | | | | | | | | | | | | WORK ORDER- 07-24-07 WORK BEGAN- 09-13-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-09-07 | | | | | | CONTRACT WORKING DAYS- 377 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 261 PERCENT TIME USED- 69 | | | | | | | | | | | | SMITH & COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0951-01-061 | | | | | | ODUM SERVICES, L.P. | |SUB %: 3.17 | | | | SCR CONSTRUCTION CO., INC. | |SUB %: 0.81 | | | | THOMAS GRINDING, INC. | |SUB %: 0.05 | | | | COASTAL CONCRETE CORPORATION | |SUB %: 0.31 | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 0.95 | | | | TRAF-TEX, INC. | |SUB %: 0.04 | | | | MURRAY CONSTRUCTION | |SUB %: 0.53 | | | | WATERS CONSTRUCTION CO., INC. | |SUB %: 3.81 | | | | BATTERSON, L.L.P. | |SUB %: 0.89 | | | | COLD CREEK CONSTRUCTION, LTD | |SUB %: 0.25 | | | | CRAWFORD YANT | |SUB %: 0.58 | | | | J & M CONTRACTING, COMPANY | |SUB %: 7.39 | | | | ROY LEE WALKER | |SUB %: 0.78 | | | | | | | | | | CONTRACT 06073029 | TOTALS | 14,615,985.01| 1,481,395.71| 13,742,575.24| 94.0| ************************************************************************************************************************************ LIBERTY AT LINNEY CRK, BOWIE CRK, FRENCH | 0.280 | 1,425,692.41| 70,594.05| 676,209.28| 47.6| FM 1008 CRK, AND LONG JOHN CRK | | | | | | 0952-01-047 | | | | | | BR 2007(685) WIDEN BRIDGES | | | | | | | | | | | | WORK ORDER- 08-30-07 WORK BEGAN- 12-14-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 09-15-07 | | | | | | CONTRACT WORKING DAYS- 210 ADDL DAYS GRANTED- 43 | | | | | | WORKING DAYS CHARGED- 257 PERCENT TIME USED- 101 | | | | | | | | | | | | PACE SERVICES, L.P. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0952-01-047 | | | | | | HIGHWAY TECHNOLOGIES, L.P. | |SUB %: 0.66 | | | | DIAMOND K EQUIPMENT INC. | |SUB %: 38.19 | | | | ODUM SERVICES, L.P. | |SUB %: 8.79 | | | | WORK ZONE PRODUCTS, INC. | |SUB %: 0.41 | | | | TOM-MAC, INC. | |SUB %: 2.53 | | | | | | | | | | CONTRACT 07073027 | TOTALS | 1,425,692.41| 70,594.05| 676,209.28| 47.6| ************************************************************************************************************************************ LIBERTY 0.6 MI W OF FM1010 S OF CLEVELAND,E | 2.733 | 12,217,764.80| 1,113,917.43| 8,075,797.30| 66.0| SH 105 2.1 MI E OF LP 573 | | | | | | 0338-12-001 | | | | | | HP 1169(009) GR, STR, BS, PAV, STRIP, SIGN | | | | | | | | | | | | WORK ORDER- 01-10-08 WORK BEGAN- 03-12-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 01-26-08 | | | | | | CONTRACT WORKING DAYS- 468 ADDL DAYS GRANTED- 21 | | | | | | WORKING DAYS CHARGED- 172 PERCENT TIME USED- 35 | | | | | | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0338-12-001 | | | | | | J & M CONTRACTING, COMPANY | |SUB %: 4.87 | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 0.82 | | | | WILLOW CITY SIGN & RAIL, INC. | |SUB %: 0.53 | | | | SEMARCK LANDSCAPE SERVICES, INC. | |SUB %: 3.97 | | | | CRAWFORD YANT | |SUB %: 1.19 | | | | LONE STAR CONSTRUCTION | |SUB %: 10.78 | | | | THIRD COAST SERVICES, LLC | |SUB %: 2.54 | | | | L.O. MATERIALS & TRUCKING, INC. | |SUB %: 0.00 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 1.62 | | | | PRIMATE CONSTRUCTION, INC. | |SUB %: 0.03 | | | | W.W. WEBBER, LLC | |SUB %: 0.40 | | | | | | | | | | CONTRACT 11073201 | TOTALS | 12,217,764.80| 1,113,917.43| 8,075,797.30| 66.0| ************************************************************************************************************************************ NEWTON JASPER CO/L, EAST | 22.746 | 4,281,889.89| 179,935.23| 1,114,376.60| 26.0| SH 63 SH 87 IN BURKEVILLE | | | | | | 0214-02-040 | | | | | | STP 2008(476) ACP, STRIPE | | | | | | | | | | | | WORK ORDER- 05-09-08 WORK BEGAN- 11-10-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-25-08 | | | | | | CONTRACT WORKING DAYS- 75 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 6 PERCENT TIME USED- 8 | | | | | | | | | | | | A. L. HELMCAMP, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0214-02-040 | | | | | | BATTERSON, L.L.P. | |SUB %: 2.78 | | | | | | | | | | CONTRACT 04083004 | TOTALS | 4,281,889.89| 179,935.23| 1,114,376.60| 26.0| ************************************************************************************************************************************ NEWTON SH 87, EAST | 2.251 | 2,112,362.95| 7,722.00| 2,265,621.39| 99.9| SH 12 SABINE RIVER BRIDGE | | | | | | 0499-02-027 | | | | | | STP 2008(007) MILL, CONC REPAIR, JNT SEAL, ACP | | | | | | | | | | | | WORK ORDER- 10-16-07 WORK BEGAN- 04-17-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 11-01-07 | | | | | | CONTRACT WORKING DAYS- 88 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 110 PERCENT TIME USED- 125 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0499-02-027 | | | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 1.14 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 3.29 | | | | CPAV SPECIALTIES, LP | |SUB %: 20.83 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 3.63 | | | | | | | | | | CONTRACT 09073025 | TOTALS | 2,112,362.95| 7,722.00| 2,265,621.39| 99.9| ************************************************************************************************************************************ NEWTON CLARKTOWN RD AT BIG SANDY CREEK | 0.071 | 320,372.60| 0.00| 0.00| 0.0| CR (STR AA0132003) | | | | | | 0920-06-025 | | | | | | BR 2007(664) STR | | | | | | | | | | | | WORK ORDER- 11-18-08 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 12-04-08 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 85 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0920-06-025 | | | | | | PANOLA LIGHT & SIGN | |SUB %: 0.92 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 7.66 | | | | | | | | | | CONTRACT 10083017 | TOTALS | 320,372.60| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ORANGE KCS RR, EAST | 18.771 | 80,988,017.01| 2,034,332.82| 69,350,385.56| 89.5| IH 10 SH 62 | | | | | | 0028-11-182 | | | | | | IM 10-8(155) GR, STR, BS, PVMT, SIGN | | | | | | | | | | | | WORK ORDER- 05-16-03 WORK BEGAN- 08-04-03 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 08-04-03 | | | | | | CONTRACT WORKING DAYS- 1,041 ADDL DAYS GRANTED- 289 | | | | | | WORKING DAYS CHARGED- 1,457 PERCENT TIME USED- 109 | | | | | | | | | | | | W.W. WEBBER INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0028-11-182 | | | | | | UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON) | |SUB %: 0.12 | | | | JOE VALENCIK, INC. | |SUB %: 0.88 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 12.91 | | | | A & G EBERHARDT ENTERPRISES, INC. | |SUB %: 0.13 | | | | WEBBER-BALKE FOUNDATION COMPANY, INC. | |SUB %: 0.48 | | | | EROSION CONTROL, INC. | |SUB %: 0.26 | | | | ODUM SERVICES, L.P. | |SUB %: 0.83 | | | | RODBUSTERS, INC. | |SUB %: 8.83 | | | | C.W.C. CONTRACTORS | |SUB %: 0.09 | | | | TRUST INDUSTRIES | |SUB %: 0.02 | | | | GATOR GRINDING, L.L.C. | |SUB %: 0.10 | | | | ASHTON SAWING AND DRILLING LLC | |SUB %: 0.24 | | | | WIDGEON CONSTRUCTION, INC. | |SUB %: 0.01 | | | | HUMBLE EQUIPMENT CO., INC. | |SUB %: 0.03 | | | | PROFESSIONAL MAID SERVICE | |SUB %: 0.08 | | | | CREACOM, INC. | |SUB %: 0.13 | | | | INDUS CONSTRUCTION, L.P. | |SUB %: 8.01 | | | | MTAM CORPORATION | |SUB %: 0.12 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.12 | | | | PLACO, LTD. | |SUB %: 0.00 | | | | CURB PLANET INC. | |SUB %: 0.00 | | | | KOSSMAN CONTRACTING COMPANY | |SUB %: 0.01 | | | | | | | | | | CONTRACT 03033001 | TOTALS | 80,988,017.01| 2,034,332.82| 69,350,385.56| 89.5| ************************************************************************************************************************************ ORANGE IH 10, SOUTH | 4.612 | 2,694,261.20| 112,174.45| 237,691.49| 8.8| FM 1442 FM 105 | | | | | | 1284-01-062 | | | | | | STP 2008(481) GR, BS, PVMT RPR, ACP, STRIPE | | | | | | | | | | | | WORK ORDER- 05-12-08 WORK BEGAN- 07-25-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-28-08 | | | | | | CONTRACT WORKING DAYS- 130 ADDL DAYS GRANTED- 29 | | | | | | WORKING DAYS CHARGED- 12 PERCENT TIME USED- 7 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1284-01-062 | | | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 2.75 | | | | L D CONSTRUCTION | |SUB %: 0.08 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 1.36 | | | | | | | | | | CONTRACT 04083209 | TOTALS | 2,694,261.20| 112,174.45| 237,691.49| 8.8| ************************************************************************************************************************************ ORANGE FM 105, EAST | 1.683 | 1,245,232.48| 0.00| 0.00| 0.0| FM 1006 ADAMS BAYOU | | | | | | 0882-02-052 | | | | | | STP 2008(478) CEM TRT BASE, OCST, ACP, STRIPING | | | | | | | | | | | | WORK ORDER- 10-16-08 WORK BEGAN- 00-00-00 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 04-01-09 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 46 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| | | | | | | | ANGEL BROTHERS ENTERPRISES, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0882-02-052 | | | | | | NO SUBCONTRACTORS FOR THIS CCSJ | | | | | | | | | | | | CONTRACT 09083208 | TOTALS | 1,245,232.48| 0.00| 0.00| 0.0| ************************************************************************************************************************************ ORANGE IH 10, EAST | 2.693 | 5,968,267.20| 25,808.96| 5,128,519.99| 85.9| SH 12 FM 1132 | | | | | | 0499-03-046 | | | | | | STP 2006(575) GR, STR, BS, ACP PVMT, STRIPE, SIGN | | | | | | | | | | | | WORK ORDER- 01-05-07 WORK BEGAN- 03-29-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-01-07 | | | | | | CONTRACT WORKING DAYS- 522 ADDL DAYS GRANTED- 9 | | | | | | WORKING DAYS CHARGED- 394 PERCENT TIME USED- 74 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0499-03-046 | | | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 1.58 | | | | A & G EBERHARDT ENTERPRISES, INC. | |SUB %: 3.12 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 0.56 | | | | NORMAN HIGHWAY CONSTRUCTORS, INC. | |SUB %: 17.40 | | | | WALKER CONSTRUCTION | |SUB %: 0.41 | | | | CPAV SPECIALTIES, LP | |SUB %: 0.14 | | | | SILVA CONTRACTING COMPANY, INC. | |SUB %: 0.88 | | | | TEX OP CONSTRUCTION, LP | |SUB %: 0.49 | | | | | | | | | | CONTRACT 11063205 | TOTALS | 5,968,267.20| 25,808.96| 5,128,519.99| 85.9| ************************************************************************************************************************************ ORANGE W OF DEWITT RD | 3.033 | 78,266,071.22| 929,101.68| 56,193,430.23| 74.7| IH 10 FM 105 | | | | | | 0028-09-100 | | | | | | NH 2005(479) GR, STRS, BASE & SURF | | | | | | | | | | | | WORK ORDER- 02-01-06 WORK BEGAN- 03-06-06 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 10-06-06 | | | | | | CONTRACT WORKING DAYS- 829 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 610 PERCENT TIME USED- 73 | | | | | | | | | | | | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0028-09-100 | | | | | | ESSARY, HART & MACWILIAM,INC. | |SUB %: 7.68 | | | | EROSION CONTROL, INC. | |SUB %: 0.10 | | | | BOOTHE BROTHERS PAVING COMPANY, INC. | |SUB %: 0.41 | | | | HIGHWAY PAVEMENT SPECIALTIES, INC. | |SUB %: 0.26 | | | | L D CONSTRUCTION | |SUB %: 0.31 | | | | JOE VALENCIK, INC. | |SUB %: 1.34 | | | | MICA CORPORATION | |SUB %: 2.71 | | | | DAVIS TREE EXPERTS | |SUB %: 0.07 | | | | SCOTT DERR PAINTING CO | |SUB %: 0.29 | | | | TREVCON, INC. | |SUB %: 5.45 | | | | SCR CONSTRUCTION CO., INC. | |SUB %: 0.06 | | | | M & D FOUNDATION DRILLING INDUSTRIES, INC. | |SUB %: 0.24 | | | | ODUM SERVICES, L.P. | |SUB %: 0.46 | | | | VAQUERO CONSTRUCTION, INC. | |SUB %: 1.47 | | | | CURB PLANET INC. | |SUB %: 0.08 | | | | | | | | | | CONTRACT 12053022 | TOTALS | 78,266,071.22| 929,101.68| 56,193,430.23| 74.7| ************************************************************************************************************************************ TYLER 12.07 MI N OF US 69, SOUTH | 11.312 | 8,707,471.64| 5,200.00| 9,034,394.14| 99.9| US 287 11.3 MI. | | | | | | 0341-04-065 | | | | | | STP 2007(172) GR, BS, PVMT | | | | | | | | | | | | WORK ORDER- 03-07-07 WORK BEGAN- 04-06-07 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 03-23-07 | | | | | | CONTRACT WORKING DAYS- 195 ADDL DAYS GRANTED- 55 | | | | | | WORKING DAYS CHARGED- 243 PERCENT TIME USED- 97 | | | | | | | | | | | | LONGVIEW BRIDGE AND ROAD, LTD. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0341-04-065 | | | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 1.45 | | | | MOORE BROTHERS CONSTRUCTION COMPANY | |SUB %: 25.66 | | | | WATERS CONSTRUCTION COMPANY, INC., BOB | |SUB %: 2.34 | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 3.57 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.11 | | | | | | | | | | CONTRACT 01073205 | TOTALS | 8,707,471.64| 5,200.00| 9,034,394.14| 99.9| ************************************************************************************************************************************ TYLER AT HICKORY CREEK | 0.093 | 1,194,855.00| 46,055.96| 1,156,090.28| 99.9| FM 1943 (STR 182802003) | | | | | | 1828-02-012 | | | | | | BR 2008(278) REPLACE BRIDGE AND APPROACHES | | | | | | | | | | | | WORK ORDER- 02-20-08 WORK BEGAN- 03-24-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 04-30-08 | | | | | | CONTRACT WORKING DAYS- 60 ADDL DAYS GRANTED- 0 | | | | | | WORKING DAYS CHARGED- 111 PERCENT TIME USED- 185 | | | | | | | | | | | | APAC-TEXAS, INC. | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 1828-02-012 | | | | | | AMERICAN REMEDIATION OPTIONS, INC. | |SUB %: 2.12 | | | | CRABTREE BARRICADE SYSTEMS, INC. | |SUB %: 0.36 | | | | BATTERSON, L.L.P. | |SUB %: 0.82 | | | | HOUSTON SAWING & DRILLING | |SUB %: 0.22 | | | | | | | | | | CONTRACT 01083233 | TOTALS | 1,194,855.00| 46,055.96| 1,156,090.28| 99.9| ************************************************************************************************************************************ TYLER 0.5 MI S OF FM 1013, SOUTH | 9.813 | 2,898,852.07| 566,308.47| 1,359,337.13| 46.8| US 69 HARDIN CO/L | | | | | | 0200-08-054 | | | | | | NH 2008(535) MILL, ACP, STRIPE | | | | | | | | | | | | WORK ORDER- 05-12-08 WORK BEGAN- 08-08-08 | | | | | | DATE WORK COMPLETED- TIME COMPUTED- 05-28-08 | | | | | | CONTRACT WORKING DAYS- 68 ADDL DAYS GRANTED- 5 | | | | | | WORKING DAYS CHARGED- 41 PERCENT TIME USED- 56 | | | | | | | | | | | | MOORE BROTHERS CONSTRUCTION COMPANY | | | | | | SUBCONTRACTOR(S) FOR CCSJ: 0200-08-054 | | | | | | INTERSTATE BARRICADES & MARKINGS, INC. | |SUB %: 0.24 | | | | DUSTROL, INC. (ROANOKE) | |SUB %: 3.80 | | | | CHEROKEE SERVICES | |SUB %: 4.32 | | | | BATTERSON, L.L.P. | |SUB %: 4.13 | | | | LONGVIEW BRIDGE AND ROAD, INC. | |SUB %: 0.19 | | | | | | | | | | CONTRACT 04083007 | TOTALS | 2,898,852.07| 566,308.47| 1,359,337.13| 46.8| ************************************************************************************************************************************ TYLER US 69, EAST | 14.000 | 5,103,678.67| 0.00| 2,231,842.86| 43.7| US 190 NECHES RIVER BRIDGE | | | | | | 0213-07-052 | | | | | | STP 2008(475) ACP, BASE, STRIPE | | | | | | | | | | | | WORK ORDER- 05-12-08 WORK BEGAN- 08-01-08 | |**************************************************| | DATE WORK COMPLETED- TIME COMPUTED- 00-00-00 | |* NO CURRENT ESTIMATE PROCESSED AT THE *| | CONTRACT WORKING DAYS- 90 ADDL DAYS GRANTED- 0 | |* TIME OF THIS RUN *| | WORKING DAYS CHARGED- 0 PERCENT TIME USED- 0 | |**************************************************| |