Item No Description Units April 30, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 3.000 351,666.66667 24.000 155,771.01917 24
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 17.000 894.11765 156.000 1,437.61167 24
506 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     112.000 25.36286 2
506 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     80.000 47.00000 2
506 2009 ROCK FILTER DAMS (REMOVE) LF     192.000 6.01875 4
506 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     154.000 14.00000 1
506 2019 CONSTRUCTION EXITS (REMOVE) SY     154.000 5.00000 1
506 2024 BACKHOE WORK (EROSION & SEDM CONT) HR     101.000 98.96040 4
506 2034 TEMPORARY SEDIMENT CONTROL FENCE LF     8,866.000 2.17211 3
508 2001 CONSTRUCTING DETOURS STA     79.900 4,500.00000 1
508 2002 CONSTRUCTING DETOURS SY     8,932.000 43.00000 1
512 2004 PORT CTB (FUR & INST) (SNGL SLP) (TY 1) LF     5,850.000 65.00000 1
512 2022 PORT CTB (MOVE) (SNGL SLP) (TY 1) LF     5,130.000 2.00000 1
512 2040 PORT CTB (REMOVE) (SNGL SLP) (TY 1) LF     5,850.000 7.00000 1
512 2048 PORT CTB (FUR & INST) (F - SHAPE) (TY 1) LF     510.000 55.00000 1
512 2050 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF     2,520.000 5.00000 1
512 2052 PORT CTB (REMOVE) (F - SHAPE) (TY 1) LF     510.000 10.00000 1
512 2094 PORT CBR (MOVE) LF     600.000 15.00000 1
512 2108 PORT CTB (FUR & INST) (SNGL SLP) (MOD) LF     75.000 143.00000 1
512 2109 PORT CTB (REMOVE) (SNGL SLP) (MOD) LF     75.000 46.00000 1
529 2001 CONC CURB (TY I) LF     944.000 20.00000 1
529 2002 CONC CURB (TY II) LF     5,533.000 20.00000 1
529 2004 CONC CURB & GUTTER (TY II) LF     50.000 40.00000 1
529 2006 CONC CURB (MONO) (TY II) LF 150.000 7.00000 150.000 7.00000 1
529 2021 CONC CURB (DOWEL) (REINF) (TY II) LF     100.000 22.00000 1
530 2004 INTERSECTIONS (CONC) SY     8,198.000 46.00000 1
530 2005 INTERSECTIONS (ACP) SY     449.000 36.00000 1
530 2006 INTERSECTIONS (SURF TREAT) SY     999.400 22.00000 1
530 2007 DRIVEWAYS (CONC) EA 7.000 4,625.00000 7.000 4,625.00000 1
530 2008 DRIVEWAYS (ACP) EA 62.000 1,650.00000 62.000 1,650.00000 1
530 2009 DRIVEWAYS (SURF TREAT) EA 18.000 1,900.00000 18.000 1,900.00000 1
530 2010 DRIVEWAYS (CONC) SY 17.000 100.00000 4,178.100 44.77497 3
530 2011 DRIVEWAYS (ACP) SY     4,139.000 18.80478 3
530 2012 DRIVEWAYS (SURF TREAT) SY     2,602.400 33.98632 2
530 2015 TURNOUTS (SURF TREAT) EA     371.000 416.64151 2
530 2017 TURNOUTS (ACP) SY     928.000 32.00000 1
530 2018 TURNOUTS (SURF TREAT) SY     1,429.000 52.00000 1
530 2023 DRIVEWAYS AND TURNOUTS (ACP) SY     391.000 76.00000 1
530 2038 DRIVEWAYS (CONC) (HES) SY     987.100 100.00000 1
531 2005 CURB RAMPS (TY 1) EA     10.000 1,158.23500 2
531 2007 CURB RAMPS (TY 3) EA     3.000 1,150.00000 1
531 2010 CURB RAMPS (TY 7) EA     30.000 1,060.00000 1
531 2015 CONC SIDEWALKS (4") SY     10,354.000 29.19239 2
531 2035 CONCRETE SIDEWALKS (5') (4") LF     2,062.000 22.59000 1
531 2041 CURB RAMPS (TY 10) EA     2.000 1,150.00000 1
533 2003 SHOULDER TEXTURING (MILLED) LF     15,037.000 1.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF 353,824.000 .06000 601,658.000 .10080 3
536 2002 CONC MEDIAN SY     311.000 40.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 1,175.000 17.66489 8,850.000 17.61794 8
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 6.000 1,200.00000 35.000 1,303.68571 4
540 2015 MTL W - BEAM GD FEN (TIM POST) RADIUS RAIL LF     54.000 22.50000 1
540 2031 MTL BM GD FN (REMOVE & RESET) LF     300.000 9.50000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     14.000 1,061.35714 4
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF     100.000 18.00000 1
540 2046 MTL BM GD FEN TRANS (NON - SYM) EA     8.000 550.00000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF 1,700.000 2.53412 7,575.000 2.10469 7
542 2002 REMOVING TERMINAL ANCHOR SECTION EA 12.000 151.00000 40.000 139.25000 5
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA 6.000 77.00000 6.000 77.00000 1
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 10.000 1,806.00000 42.000 2,017.02381 7
544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     2.000 625.00000 1
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     31.000 165.80645 4
544 2006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA     2.000 2,407.00000 1
544 2011 GDRAIL END TRT (REMOV) (WOOD POST) (TY II EA 6.000 126.00000 6.000 126.00000 1
545 2001 CRASH CUSH ATTEN (INSTL) EA     1.000 10,500.00000 1
545 2002 CRASH CUSH ATTEN (MOVE & RESET) EA     8.000 2,100.00000 1
545 2003 CRASH CUSH ATTEN (REMOVE) EA     1.000 800.00000 1
545 2058 CRASH CUSH ATTEN (INSTL) (N) EA     3.000 11,400.00000 1
545 2059 CRASH CUSH ATTEN (MOVE & RESET) (N) EA     3.000 1,500.00000 1
545 2060 CRASH CUSH ATTEN (REMOVE) (N) EA     3.000 900.00000 1
560 2004 MAILBOX INSTALL - S (WC - POST) TY 3 FND EA     12.000 165.00000 1
560 2005 MAILBOX INSTALL - D (WC - POST) TY 3 FND EA     3.000 338.00000 1
560 2006 MAILBOX INSTALL - S (RR - POST) TY 4 FND - T EA     49.000 220.00000 2
560 2007 MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T EA 4.000 217.00000 26.000 221.65385 3
560 2008 MAILBOX INSTALL - M (TWW - POST) TY 4 FND - T EA 1.000 428.00000 25.000 457.12000 4
560 2009 MAILBOX INSTALL - M (TWG - POST) TY 1 FND EA     1.000 500.00000 1
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA 22.000 196.00000 180.000 184.13333 4
560 2016 MAILBOX INSTALL - D (TWW - POST) TY2 FND - TB EA     9.000 199.00000 1
560 2017 MAILBOX INSTALL - M (TWW - POST) TY2 FND - TB EA     9.000 423.00000 1
560 2021 MAILBOX INSTALL - S (TWG - POST) TY 2 FND - TB EA     53.000 121.00000 1
560 2022 MAILBOX INSTALL - D (TWG - POST) TY 2 FND - TB EA     19.000 152.00000 1
560 2023 MAILBOX INSTALL - M (TWG - POST) TY 2 FND - TB EA     17.000 325.00000 1