| Item No |
Description |
Units |
November 30, 2009 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 500 2001 |
MOBILIZATION |
LS |
2.000 |
47,500.00000 |
41.000 |
95,628.27488 |
41 |
| 502 2001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING |
MO |
9.000 |
1,250.00000 |
249.000 |
1,927.75438 |
41 |
| 506 2001 |
ROCK FILTER DAMS (INSTALL) (TY 1) |
LF |
1,175.000 |
20.19149 |
3,435.000 |
25.80594 |
9 |
| 506 2002 |
ROCK FILTER DAMS (INSTALL) (TY 2) |
LF |
|
|
298.000 |
28.87416 |
4 |
| 506 2004 |
ROCK FILTER DAMS (INSTALL) (TY 4) |
LF |
|
|
140.000 |
40.00000 |
1 |
| 506 2009 |
ROCK FILTER DAMS (REMOVE) |
LF |
1,175.000 |
5.51064 |
3,757.000 |
7.03993 |
11 |
| 506 2016 |
CONSTRUCTION EXITS (INSTALL) (TY 1) |
SY |
|
|
2,158.000 |
14.56411 |
4 |
| 506 2019 |
CONSTRUCTION EXITS (REMOVE) |
SY |
|
|
2,158.000 |
7.74413 |
4 |
| 506 2022 |
EARTHWORK (ERSN & SEDM CONT, IN VEH) |
CY |
|
|
28.000 |
5.35000 |
1 |
| 506 2024 |
BACKHOE WORK (EROSION & SEDM CONT) |
HR |
|
|
187.000 |
53.94439 |
7 |
| 506 2034 |
TEMPORARY SEDIMENT CONTROL FENCE |
LF |
|
|
5,282.000 |
2.54640 |
5 |
| 506 2035 |
BIODEGRADABLE EROSION CONTROL LOGS (18" |
LF |
|
|
4,250.000 |
3.82412 |
4 |
| 506 2040 |
TEMP SEDIMENT CONTROL FENCE (REMOVE) |
LF |
|
|
700.000 |
.88571 |
2 |
| 506 2045 |
BIODEGRADABLE EROSION CONTROL LOGS (12" |
LF |
|
|
300.000 |
6.71333 |
3 |
| 508 2002 |
CONSTRUCTING DETOURS |
SY |
|
|
349.000 |
25.00000 |
1 |
| 512 2001 |
PORT CTB (FUR & INST) (SAFETY SH) (TY 1) |
LF |
|
|
2,540.000 |
60.00000 |
1 |
| 512 2037 |
PORT CTB (REMOVE) (SAFETY SH) (TY 1) |
LF |
|
|
2,540.000 |
5.00000 |
1 |
| 529 2002 |
CONC CURB (TY II) |
LF |
|
|
400.000 |
20.00000 |
1 |
| 529 2004 |
CONC CURB & GUTTER (TY II) |
LF |
|
|
10,129.000 |
9.30921 |
2 |
| 529 2006 |
CONC CURB (MONO) (TY II) |
LF |
|
|
692.000 |
8.85968 |
3 |
| 529 2009 |
CONCRETE CURB (SPECIAL) |
LF |
|
|
2,111.000 |
10.07000 |
1 |
| 529 2021 |
CONC CURB (DOWEL) (REINF) (TY II) |
LF |
|
|
260.000 |
12.87000 |
2 |
| 529 2029 |
CONC CURB & GUTTER (TY II A) |
LF |
|
|
204.000 |
82.93000 |
2 |
| 530 2005 |
INTERSECTIONS (ACP) |
SY |
|
|
2,775.700 |
13.37839 |
3 |
| 530 2009 |
DRIVEWAYS (SURF TREAT) |
EA |
|
|
2.000 |
1,650.00000 |
1 |
| 530 2010 |
DRIVEWAYS (CONC) |
SY |
|
|
815.000 |
49.43137 |
2 |
| 530 2011 |
DRIVEWAYS (ACP) |
SY |
|
|
9,057.000 |
22.46621 |
2 |
| 530 2012 |
DRIVEWAYS (SURF TREAT) |
SY |
|
|
115.000 |
52.88000 |
1 |
| 530 2015 |
TURNOUTS (SURF TREAT) |
EA |
|
|
288.000 |
498.80208 |
2 |
| 530 2017 |
TURNOUTS (ACP) |
SY |
|
|
91.000 |
40.66000 |
1 |
| 530 2020 |
INTRSCT, DRVWAYS, & TURNOUT (ACP) |
SY |
|
|
857.000 |
17.00000 |
1 |
| 531 2004 |
CONC SIDEWALKS (6") |
SY |
|
|
48.000 |
78.59000 |
2 |
| 531 2005 |
CURB RAMPS (TY 1) |
EA |
|
|
8.000 |
1,341.78000 |
3 |
| 531 2010 |
CURB RAMPS (TY 7) |
EA |
|
|
2.000 |
1,500.00000 |
1 |
| 531 2011 |
CURB RAMPS (TY 8) |
EA |
|
|
4.000 |
1,183.56000 |
2 |
| 531 2015 |
CONC SIDEWLKS (4") |
SY |
|
|
2,895.000 |
39.71000 |
1 |
| 533 2001 |
SHOULDER TEXTURING (MILLED) |
STA |
|
|
437.480 |
45.49214 |
3 |
| 540 2001 |
MTL W - BEAM GD FEN (TIM POST) |
LF |
375.500 |
32.00000 |
16,450.500 |
16.50688 |
7 |
| 540 2005 |
TERMINAL ANCHOR SECTION |
EA |
|
|
33.000 |
564.87273 |
8 |
| 540 2011 |
MTL BEAM GD FEN TRANS (THRIE - BEAM) |
EA |
|
|
19.000 |
1,983.15789 |
2 |
| 540 2012 |
MTL BEAM GD FEN TRANS (TL2) |
EA |
|
|
2.000 |
980.00000 |
1 |
| 540 2013 |
MTL BEAM GD FEN TRANS (T101) |
EA |
|
|
164.000 |
920.97561 |
4 |
| 540 2014 |
MTL W - BEAM GD FEN (LOW FILL CULVERT) |
LF |
62.000 |
55.00000 |
62.000 |
55.00000 |
1 |
| 542 2001 |
REMOVING METAL BEAM GUARD FENCE |
LF |
537.500 |
3.24999 |
11,861.500 |
2.06073 |
8 |
| 542 2002 |
REMOVING TERMINAL ANCHOR SECTION |
EA |
4.000 |
160.00000 |
89.000 |
118.30562 |
8 |
| 544 2001 |
GUARDRAIL END TREATMENT (INSTALL) |
EA |
4.000 |
2,100.00000 |
187.000 |
2,047.59358 |
8 |
| 544 2002 |
GUARDRAIL END TREATMENT (MOVE & RESET) |
EA |
|
|
20.000 |
609.70000 |
3 |
| 544 2003 |
GUARDRAIL END TREATMENT (REMOVE) |
EA |
|
|
12.000 |
268.75000 |
2 |
| 544 2006 |
GDRAIL END TRT (INST) (WOOD POST) (TY III |
EA |
|
|
4.000 |
1,750.00000 |
1 |
| 545 2004 |
CRASH CUSH ATTEN (INSTL) (FASTRACC) |
EA |
|
|
2.000 |
15,500.00000 |
1 |
| 545 2007 |
CRASH CUSH ATTEN (INSTL) (TRACC) |
EA |
|
|
1.000 |
13,000.00000 |
1 |
| 545 2010 |
CRASH CUSH ATTEN (INSTL) (SHORTRACC) |
EA |
|
|
1.000 |
9,500.00000 |
1 |
| 545 2049 |
CRASH CUSH ATTEN (INSTL) (WORK ZONE) |
EA |
|
|
18.000 |
17,000.00000 |
1 |
| 545 2051 |
CRASH CUSH ATTEN (REMOVE) (WORK ZONE) |
EA |
|
|
18.000 |
1,650.00000 |
1 |
| 560 2001 |
MAILBOX INSTALLATION (SINGLE) |
EA |
|
|
7.000 |
150.00000 |
1 |
| 560 2004 |
MAILBOX INSTALL - S (WC - POST) TY 3 FND |
EA |
17.000 |
150.00000 |
57.000 |
135.96491 |
2 |
| 560 2005 |
MAILBOX INSTALL - D (WC - POST) TY 3 FND |
EA |
3.000 |
200.00000 |
14.000 |
176.42857 |
2 |
| 560 2006 |
MAILBOX INSTALL - S (RR - POST) TY 4 FND - T |
EA |
|
|
31.000 |
263.38710 |
2 |
| 560 2007 |
MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T |
EA |
8.000 |
215.00000 |
10.000 |
227.00000 |
2 |
| 560 2008 |
MAILBOX INSTALL - M (TWW - POST) TY 4 FND - T |
EA |
5.000 |
535.00000 |
11.000 |
515.90909 |
2 |
| 560 2009 |
MAILBOX INSTALL - M (TWG - POST) TY 1 FND |
EA |
6.000 |
350.00000 |
14.000 |
321.42857 |
2 |
| 560 2014 |
MAILBOX INSTALL - SP (TIM - POST) TY 5 FND |
EA |
1.000 |
250.00000 |
1.000 |
250.00000 |
1 |
| 560 2015 |
MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB |
EA |
44.000 |
160.00000 |
50.000 |
176.80000 |
3 |