AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - BEAUMONT DISTRICT

Last Update: Monday, March 31, 2014
ITEMS 100 2001 TO 193 2016
Items Items Bid Code Range
0100 - 0193
0216 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0687
0730 - 0784
1122 - 1122
2138 - 2139
3085 - 3273
4116 - 4649
5165 - 5369
6007 - 6834
7622 - 7642
8020 - 8835
100 2001 - 193 2016
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     57.220 122,433.67704 4
100 2002 PREPARING ROW STA     291.670 3,231.30421 3
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     7.000 2,500.00000 1
104 2001 REMOVING CONC (PAV) SY     114,902.000 12.66177 7
104 2009 REMOVING CONC (RIPRAP) SY     5,477.000 8.71753 7
104 2010 REMOVING CONC (RIPRAP) CY     76.200 90.00000 1
104 2011 REMOVING CONC (MEDIANS) SY     882.000 21.24263 3
104 2015 REMOVING CONC (SIDEWALKS) SY     523.000 6.00000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     4,489.000 12.43517 4
104 2021 REMOVING CONC (CURB) LF     25,565.000 3.56763 5
104 2023 REMOVING CONC (CTB) LF     7,688.000 7.91935 2
104 2027 REMOVING CONC (APPR SLAB) SY     641.000 30.03432 2
104 2045 REMOVE CONC (MISC) EA     55.000 150.00000 1
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY     1,507.000 5.75000 1
105 2005 REMOVING STAB BASE AND ASPH PAV (3") SY     521.000 12.00000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     4,526.000 2.56827 2
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     10,960.000 1.52000 1
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY     9,113.000 3.00000 1
105 2015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY     132.000 23.00000 1
105 2016 REMOVING STAB BASE & ASPH PAV (16") SY     411.000 25.00000 1
105 2018 REMOVING STAB BASE AND ASPH PAV (7") SY     1,093.000 13.00000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     15,453.000 2.68968 3
105 2021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY     1,429.000 6.75000 1
105 2023 REMOVING STAB BASE AND ASPH PAV (5") SY     110.000 36.00000 1
105 2025 REMOVING STAB BASE AND ASPH PAV (10") CY     1,223.000 10.10000 1
105 2026 REMOVE STAB BASE & ASPH PAV (13" - 18") SY     32,529.000 4.00000 1
105 2029 REMOVE STAB BASE & ASPH PAV (24") SY     470.000 34.00000 1
105 2035 REMOVING STAB BASE & ASPH PAV (0 - 2") SY     21,193.000 .80000 1
105 2036 REMOVING STAB BASE & ASPH PAV (15" - 20") SY     395.000 29.75000 1
105 2037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     29,439.000 6.60000 1
105 2038 REMOVING STAB BASE AND ASPH PAV (11") SY     763.000 14.00000 1
105 2043 REMOVING STAB BASE & ASPH PAV (0 - 6") SY     1,636.000 8.16000 1
105 2065 REMOVING STAB BASE AND ASPH PAV (1") SY     523.000 14.00000 1
110 2001 EXCAVATION (ROADWAY) CY 522.000 13.12000 238,217.000 11.97916 9
110 2002 EXCAVATION (CHANNEL) CY     500.000 15.00000 1
110 2003 EXCAVATION (SPECIAL) CY     54.000 20.00000 1
110 2004 EXCAVATION (ROADWAY AND CHANNEL) CY     8,116.000 12.43001 3
112 2001 SUBGRADE WIDENING (ORD COMP) STA     1,092.430 513.54366 4
112 2002 SUBGRADE WIDENING (DENS CONT) STA     35.000 2,500.00000 1
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     41.000 30.00000 1
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     126,787.000 6.00000 1
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY 214.000 12.00000 485,626.000 6.44661 3
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     8,143.000 16.00000 1
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     254,858.000 6.79233 4
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY     200.000 24.00000 1
132 2017 EMBANKMENT (VEHICLE) (ORD COMP) (TY A) CY 2,084.000 34.00000 2,084.000 34.00000 1
134 2002 BACKFILL (TY B) STA 27.400 224.45000 976.850 129.55652 8
134 2004 BACKFILL (TY A OR B) STA     490.170 98.17431 2
150 2001 BLADING STA     23.100 235.00000 1
150 2002 BLADING HR     282.000 106.54255 4
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     706,013.000 1.08602 5
162 2002 BLOCK SODDING SY     4,759.000 4.33692 3
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     51,797.000 .11000 1
164 2004 BROADCAST SEED (PERM) (RURAL) (CLAY) AC     .036 7,200.00000 1
164 2009 BROADCAST SEED (TEMP) (WARM) SY     93,339.000 .10132 3
164 2010 BROADCAST SEED (TEMP) (WARM) AC 1.260 .00794 7.026 371.64959 4
164 2011 BROADCAST SEED (TEMP) (COOL) SY     93,339.000 .10132 3
164 2012 BROADCAST SEED (TEMP) (COOL) AC     5.730 410.47120 2
164 2021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     94,452.000 .21920 4
164 2022 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) AC     44.930 1,250.00000 1
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     71,022.000 .20450 2
164 2024 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) AC 7.660 1,037.33681 12.910 1,022.15337 3
164 2025 CELL FBR MLCH SEED (PERM) (URBAN) (SANDY) SY     9,254.000 .26000 1
164 2027 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) SY     130,128.000 .20000 1
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY     78,941.000 .20000 2
164 2030 CELL FBR MLCH SEED (TEMP) (WARM) AC     22.470 1,250.00000 1
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY     78,941.000 .20000 2
164 2032 CELL FBR MLCH SEED (TEMP) (COOL) AC     22.470 1,250.00000 1
164 2037 DRILL SEEDING (PERM) (URBAN) (SANDY) SY     309,478.000 .12000 1
164 2051 DRILL SEED (TEMP) (WARM OR COOL) SY     309,478.000 .12000 1
166 2002 FERTILIZER TON     2.770 460.00000 1
168 2001 VEGETATIVE WATERING MG 100.500 14.93900 4,779.490 15.38648 16
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     2,698.000 .93000 1
192 2024 PLANT MATERIAL (30 GAL) (TREE) EA     838.000 125.00000 1
192 2025 PLANT MATERIAL (45 GAL) (TREE) EA     978.000 225.00000 1
193 2001 PLANT MAINTENANCE MO     24.000 1,000.00000 1
193 2006 VEGETATIVE WATERING MG     709.000 1.00000 1
193 2010 PLANT REPLACEMENT (30 GAL) EA     105.000 1.00000 1
193 2016 PLANT REPLACEMENT (45 GAL) EA     117.000 1.00000 1