| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | TRAVIS |
| Highway |
SH0130 |
| From |
VARIOUS LOCATIONS ON SH130,LP1,SH45,183A |
| To |
SH45SE. |
| CSJ |
6178-39-001 |
| Proj ID |
RMC - 617839001 |
| Work Type |
VARIOUS ROADSIDE MAINTENANCE |
| |
|
0.001 |
14673406.50 |
249024.60 |
12724523.09 |
86.7 |
| Work Order |
04-22-09 |
| Work Began |
05-01-09 |
| Work Completed |
|
| Time Computed |
05-01-09 |
| Contract Working Days |
1,095 |
| Addl Days Granted |
0 |
| Working Days Charged |
1,066 |
| Percent Time Used |
97 |
| Contractor(s) |
| ISI CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6178-39-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12084008 |
|
Totals |
14673406.50 |
249024.60 |
12724523.09 |
86.7 |
|
| County | TRAVIS |
| Highway |
IH0035 |
| From |
COMAL COUNTY LINE |
| To |
BELL COUNTY LINE |
| CSJ |
6212-97-001 |
| Proj ID |
RMC - 621297001 |
| Work Type |
MILL, FULL DEPTH REPAIR AND OVERLAY |
| |
|
80.000 |
861102.50 |
0.00 |
1455274.02 |
99.9 |
| Work Order |
06-15-11 |
| Work Began |
07-06-11 |
| Work Completed |
|
| Time Computed |
07-06-11 |
| Contract Working Days |
102 |
| Addl Days Granted |
0 |
| Working Days Charged |
101 |
| Percent Time Used |
99 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6212-97-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02114013 |
|
Totals |
861102.50 |
0.00 |
1455274.02 |
99.9 |
|
| County | TRAVIS |
| Highway |
IH0035 |
| From |
1ST., 11TH, 12TH, MANOR RD., 32ND |
| To |
38TH & 1/2 STREET UNDERPASSES |
| CSJ |
6212-99-001 |
| Proj ID |
BPM - 621299001 |
| Work Type |
RETROFIT BRIDGE RAILS |
| |
|
0.001 |
704380.00 |
69205.92 |
415873.37 |
59.0 |
| Work Order |
01-01-12 |
| Work Began |
01-30-12 |
| Work Completed |
|
| Time Computed |
01-30-12 |
| Contract Working Days |
55 |
| Addl Days Granted |
0 |
| Working Days Charged |
35 |
| Percent Time Used |
63 |
| Contractor(s) |
| RESTEK, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6212-99-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04114029 |
|
Totals |
704380.00 |
69205.92 |
415873.37 |
59.0 |
|
| County | BASTROP |
| Highway |
US0290 |
| From |
DISTRICT 14: |
| To |
LEE, BASTROP, CALDWELL, & HAYS COUNTIES |
| CSJ |
6218-25-001 |
| Proj ID |
RMC - 621825001 |
| Work Type |
REPAIR GUARDRAIL |
| |
|
0.001 |
678526.80 |
19813.50 |
413117.99 |
60.8 |
| Work Order |
01-21-11 |
| Work Began |
02-01-11 |
| Work Completed |
|
| Time Computed |
02-01-11 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
455 |
| Percent Time Used |
62 |
| Contractor(s) |
| CKORP, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6218-25-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12104007 |
|
Totals |
678526.80 |
19813.50 |
413117.99 |
60.8 |
|
| County | TRAVIS |
| Highway |
LP0001 |
| From |
VAR LOCATIONS ON LP1,IH35,US183, |
| To |
US290/71 |
| CSJ |
6219-75-001 |
| Proj ID |
RMC - 621975001 |
| Work Type |
VARIOUS ROADSIDE MAINTENANCE |
| |
|
60.560 |
10734465.60 |
0.00 |
5288126.72 |
49.5 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-27-11 |
| Work Began |
06-06-11 |
| Work Completed |
|
| Time Computed |
06-06-11 |
| Contract Working Days |
731 |
| Addl Days Granted |
0 |
| Working Days Charged |
361 |
| Percent Time Used |
49 |
| Contractor(s) |
| ISI CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6219-75-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04114027 |
|
Totals |
10734465.60 |
0.00 |
5288126.72 |
49.5 |
|
| County | TRAVIS |
| Highway |
US0183 |
| From |
US 183 FLYOVER |
| To |
LOOP 1 |
| CSJ |
6221-30-001 |
| Proj ID |
RMC - 622130001 |
| Work Type |
REPAIR DAMAGE TO BRIDGE FROM FIRE |
| |
|
1.000 |
319429.00 |
0.00 |
259709.79 |
81.3 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
07-22-11 |
| Work Began |
08-01-11 |
| Work Completed |
|
| Time Computed |
08-01-11 |
| Contract Working Days |
20 |
| Addl Days Granted |
2 |
| Working Days Charged |
22 |
| Percent Time Used |
100 |
| Contractor(s) |
| RESTEK, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6221-30-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04114012 |
|
Totals |
319429.00 |
0.00 |
259709.79 |
81.3 |
|
| County | TRAVIS |
| Highway |
IH0035 |
| From |
VAROUS LOCATIONS IN THE AUSTIN DISTRICT |
| To |
. |
| CSJ |
6222-66-001 |
| Proj ID |
RMC - 622266001 |
| Work Type |
PAVEMENT MARKINGS AND MARKERS |
| |
|
0.001 |
2420000.00 |
105312.78 |
2657767.53 |
99.9 |
| Work Order |
05-20-11 |
| Work Began |
06-01-11 |
| Work Completed |
|
| Time Computed |
06-01-11 |
| Contract Working Days |
240 |
| Addl Days Granted |
0 |
| Working Days Charged |
191 |
| Percent Time Used |
79 |
| Contractor(s) |
| D. I. J. CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6222-66-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04114030 |
|
Totals |
2420000.00 |
105312.78 |
2657767.53 |
99.9 |
|
| County | TRAVIS |
| Highway |
IH0035 |
| From |
COMAL COUNTY LINE |
| To |
BELL COUNTY LINE |
| CSJ |
6223-07-001 |
| Proj ID |
RMC - 622307001 |
| Work Type |
CLEANING AND SWEEPING HIGHWAYS |
| |
|
0.001 |
786682.00 |
33043.00 |
367003.00 |
46.6 |
| Work Order |
06-02-11 |
| Work Began |
06-13-11 |
| Work Completed |
|
| Time Computed |
06-13-11 |
| Contract Working Days |
731 |
| Addl Days Granted |
0 |
| Working Days Charged |
323 |
| Percent Time Used |
44 |
| Contractor(s) |
| ISI CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6223-07-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04114028 |
|
Totals |
786682.00 |
33043.00 |
367003.00 |
46.6 |
|
| County | TRAVIS |
| Highway |
US0290 |
| From |
VARIOUS ROADWAYS WITHIN THE |
| To |
AUSTIN DISTRICT |
| CSJ |
6224-63-001 |
| Proj ID |
RMC - 622463001 |
| Work Type |
FLEXIBLE PAVEMENT STRUCTURE REPAIR |
| |
|
0.001 |
2041996.78 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
731 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6224-63-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05114030 |
|
Totals |
2041996.78 |
0.00 |
0.00 |
0.0 |
|
| County | CALDWELL |
| Highway |
SH0080 |
| From |
FM 20 |
| To |
CYPRESS ST. IN LULING |
| CSJ |
6232-45-001 |
| Proj ID |
RMC - 623245001 |
| Work Type |
LEVELUP AND SEAL |
| |
|
9.147 |
603637.80 |
311796.80 |
311796.80 |
51.6 |
| Work Order |
03-30-12 |
| Work Began |
04-03-12 |
| Work Completed |
|
| Time Computed |
04-06-12 |
| Contract Working Days |
14 |
| Addl Days Granted |
0 |
| Working Days Charged |
4 |
| Percent Time Used |
28 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6232-45-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12114009 |
|
Totals |
603637.80 |
311796.80 |
311796.80 |
51.6 |
|
| County | GILLESPIE |
| Highway |
SH0016 |
| From |
VAR RDS IN GILLESPIE,BURNET,BLANCO |
| To |
LLANO,MASON,WILLIAMSON,KENDALL COUNTIES |
| CSJ |
6232-71-001 |
| Proj ID |
RMC - 623271001 |
| Work Type |
CRACK SEAL |
| |
|
168.528 |
279692.60 |
0.00 |
279692.60 |
99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
02-08-12 |
| Work Began |
02-21-12 |
| Work Completed |
|
| Time Computed |
02-15-12 |
| Contract Working Days |
35 |
| Addl Days Granted |
0 |
| Working Days Charged |
21 |
| Percent Time Used |
60 |
| Contractor(s) |
| AUSTIMPACTORS LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6232-71-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11114019 |
|
Totals |
279692.60 |
0.00 |
279692.60 |
99.9 |
|
| County | GILLESPIE |
| Highway |
US0290 |
| From |
VARIOUS ROADS IN GILLESPIE AND |
| To |
LLANO COUNTIES |
| CSJ |
6232-96-001 |
| Proj ID |
RMC - 623296001 |
| Work Type |
SEAL COAT |
| |
|
24.548 |
934315.85 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
15 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| CLARK CONSTRUCTION OF TEXAS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6232-96-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12114010 |
|
Totals |
934315.85 |
0.00 |
0.00 |
0.0 |
|
| County | HAYS |
| Highway |
RM0012 |
| From |
RM 3237 |
| To |
0.498 MI. N. OF RM 32 |
| CSJ |
6233-74-001 |
| Proj ID |
RMC - 623374001 |
| Work Type |
SEAL COAT |
| |
|
3.483 |
299035.25 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
23 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6233-74-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01124022 |
|
Totals |
299035.25 |
0.00 |
0.00 |
0.0 |
|
| County | GILLESPIE |
| Highway |
US0290 |
| From |
DISTRICT 14: TRAVIS, WILLIAMSON, |
| To |
MASON, LLANO,BURNET, GILLESPIE, BLANCO |
| CSJ |
6233-76-001 |
| Proj ID |
RMC - 623376001 |
| Work Type |
REPAIR AND UPGRADE MBGF |
| |
|
0.001 |
1720885.33 |
60683.75 |
353426.35 |
20.5 |
| Work Order |
01-11-12 |
| Work Began |
02-01-12 |
| Work Completed |
|
| Time Computed |
02-01-12 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
90 |
| Percent Time Used |
12 |
| Contractor(s) |
| CKORP, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6233-76-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12114027 |
|
Totals |
1720885.33 |
60683.75 |
353426.35 |
20.5 |
|
| County | WILLIAMSON |
| Highway |
FM0112 |
| From |
6 MI.SO. OF SH 95 |
| To |
14 MI. SO. OF SH 95 |
| CSJ |
6233-85-001 |
| Proj ID |
RMC - 623385001 |
| Work Type |
ROUTINE MAINTENANCE |
| |
|
15.779 |
1671803.71 |
0.00 |
0.00 |
0.0 |
| Work Order |
04-10-12 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
04-29-12 |
| Contract Working Days |
45 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| J.D. RAMMING PAVING CO., LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6233-85-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12114025 |
|
Totals |
1671803.71 |
0.00 |
0.00 |
0.0 |
|
| County | WILLIAMSON |
| Highway |
SH0138 |
| From |
US 183 |
| To |
SH 195 |
| CSJ |
6234-14-001 |
| Proj ID |
RMC - 623414001 |
| Work Type |
PVMT. REPAIRS, LEVEL - UP, SEAL COAT |
| |
|
13.927 |
872029.19 |
55366.90 |
55366.90 |
6.3 |
| Work Order |
04-16-12 |
| Work Began |
04-30-12 |
| Work Completed |
|
| Time Computed |
04-23-12 |
| Contract Working Days |
30 |
| Addl Days Granted |
0 |
| Working Days Charged |
1 |
| Percent Time Used |
3 |
| Contractor(s) |
| J.D. RAMMING PAVING CO., LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6234-14-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12114026 |
|
Totals |
872029.19 |
55366.90 |
55366.90 |
6.3 |
|
| County | TRAVIS |
| Highway |
FM0973 |
| From |
US 290 |
| To |
FM 812, ETC |
| CSJ |
6234-18-001 |
| Proj ID |
RMC - 623418001 |
| Work Type |
FULL DEPTH REPAIR |
| |
|
0.001 |
576466.24 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
31 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| J.D. RAMMING PAVING CO., LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6234-18-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01124006 |
|
Totals |
576466.24 |
0.00 |
0.00 |
0.0 |
|
| County | WILLIAMSON |
| Highway |
US0079 |
| From |
BU-79W |
| To |
BU-79E |
| CSJ |
6235-37-001 |
| Proj ID |
RMC - 623537001 |
| Work Type |
LEVEL - UP & ONE COURSE SURFACE TREATMENT |
| |
|
4.777 |
730355.92 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
35 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| J.D. RAMMING PAVING CO., LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6235-37-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01124007 |
|
Totals |
730355.92 |
0.00 |
0.00 |
0.0 |
|
| County | WILLIAMSON |
| Highway |
SH0095 |
| From |
0.23 MI. N. OF PEACH CREEK |
| To |
CR 544 (OLD COUPLAND ROAD) |
| CSJ |
6236-63-001 |
| Proj ID |
RMC - 623663001 |
| Work Type |
ONE COURSE SURFACE TRT & MILL, SEAL & OV |
| |
|
7.847 |
1354975.99 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
50 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| J.D. RAMMING PAVING CO., LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6236-63-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01124008 |
|
Totals |
1354975.99 |
0.00 |
0.00 |
0.0 |
|
| County | WILLIAMSON |
| Highway |
FM1460 |
| From |
HIGH TECH DR. |
| To |
300' SOUTH OF CR 186 |
| CSJ |
6236-66-001 |
| Proj ID |
RMC - 623666001 |
| Work Type |
SPOT REPAIRS, UNDERSEAL & OVERLAY |
| |
|
2.969 |
805763.91 |
324444.83 |
324444.83 |
40.2 |
| Work Order |
04-09-12 |
| Work Began |
04-16-12 |
| Work Completed |
|
| Time Computed |
04-17-12 |
| Contract Working Days |
27 |
| Addl Days Granted |
0 |
| Working Days Charged |
11 |
| Percent Time Used |
40 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6236-66-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01124023 |
|
Totals |
805763.91 |
324444.83 |
324444.83 |
40.2 |
|