AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - ATLANTA DISTRICT

Last Update: Friday, August 1, 2014
ITEMS 7580 2003 TO 7580 2007
Items Items Bid Code Range
0100 - 0169
0247 - 0275
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0685
1122 - 1122
2024 - 2240
3120 - 3282
5367 - 5369
6055 - 6986
7580 - 7580
8020 - 8994
7580 2003 - 7580 2007
Item No Description Units July 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
7580 2003 HIGH PRESSURE WATER BLASTING SYSTEM 7" LF     127,492.000 .41319 6
7580 2004 HIGH PRESSURE WATER BLASTING SYSTEM 9" LF     58,618.000 .49945 5
7580 2005 HIGH PRESSURE WATER BLASTING SYSTEM 24 LF     5,240.000 2.03393 5
7580 2006 HIGH PRESSURE WATER BLASTING SYS (ARROW EA     66.000 63.66970 4
7580 2007 HIGH PRESSURE WATER BLASTING SYS (WORD) EA     35.000 74.05714 3