AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - ATLANTA DISTRICT

Last Update: Tuesday, May 5, 2015
ITEMS 1122 2001 TO 1122 2057
Items Items Bid Code Range
0100 - 0193
0247 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
1122 - 1122
2033 - 2240
3120 - 3282
6001 - 6986
7030 - 7030
8020 - 8994
1122 2001 - 1122 2057
Item No Description Units April 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1122 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     1,050.000 20.58095 3
1122 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     380.000 43.48684 3
1122 2009 ROCK FILTER DAMS (REMOVE) LF     1,430.000 6.03846 6
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     148.000 19.00000 1
1122 2019 CONSTRUCTION EXITS (REMOVE) SY     148.000 10.00000 1
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF     39,527.000 3.01191 9
1122 2048 BIOGRD EROSN CONT LOGS (12" DIA) INSTAL LF     72.000 10.00000 1
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF     72.000 5.00000 1
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF     39,527.000 1.06638 9