AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - ATLANTA DISTRICT

Last Update: Wednesday, September 2, 2015
ITEMS 467 6231 TO 496 6098
Items Items Bid Code Range
0100 - 0193
0247 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0780 - 0780
1122 - 1122
2147 - 2201
3014 - 3282
6001 - 6986
7030 - 7030
8020 - 8994
400 2005 - 467 2288
467 6231 - 496 6098
Item No Description Units August 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
467 6231 SET (TY I) (S= 6 FT) (HW= 8 FT) (3: 1) (C) EA     4.000 8,500.00000 1
467 6260 SET (TY I) (S= 7 FT) (HW= 8 FT) (3: 1) (C) EA     2.000 9,750.00000 1
467 6348 SET (TY II) (18 IN) (CMP) (6: 1) (P) EA     2.000 455.00000 1
467 6356 SET (TY II) (18 IN) (RCP) (3: 1) (C) EA     2.000 550.00000 1
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA     190.000 604.21326 5
467 6388 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA     31.000 675.00000 1
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA     7.000 705.00000 3
467 6394 SET (TY II) (24 IN) (RCP) (6: 1) (C) EA     5.000 900.00000 2
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA     44.000 902.27273 2
467 6417 SET (TY II) (30 IN) (RCP) (3: 1) (C) EA     4.000 1,750.00000 1
467 6419 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA     1.000 1,200.00000 1
467 6422 SET (TY II) (30 IN) (RCP) (6: 1) (C) EA     4.000 1,500.00000 2
467 6448 SET (TY II) (36 IN) (RCP) (3: 1) (C) EA     6.000 2,100.00000 1
479 2001 ADJ MANHS EA     1.000 2,000.00000 1
481 2010 PVC PIPE (SCH 40) (4 IN) LF     240.000 40.00000 1
481 6011 PIPE (PVC) (SCH 40) (4 IN) LF     147.000 40.64000 1
481 6014 PIPE (PVC) (SCH 40) (8 IN) LF     200.000 30.00000 1
496 2004 REMOV STR (SET) EA     1.000 1,000.00000 1
496 2009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA     2.000 11,750.00000 2
496 6002 REMOV STR (INLET) EA     4.000 500.00000 1
496 6004 REMOV STR (SET) EA     38.000 250.00000 1
496 6005 REMOV STR (WINGWALL) EA     8.000 1,050.00000 2
496 6006 REMOV STR (HEADWALL) EA     38.000 454.75553 3
496 6007 REMOV STR (PIPE) LF     5,173.000 6.90684 6
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA     3.000 98,333.33333 3
496 6056 REMOVE STR (STL SECTIONS) LF     424.660 80.00000 1
496 6091 REMOV STR (CURB) EA     2.000 2,400.00000 1
496 6098 REMOV STR (PIPE UNDERDRAIN) LF     3,460.000 7.50000 1