AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - ATLANTA DISTRICT

Last Update: Friday, February 27, 2015
ITEMS 100 2001 TO 193 2036
Items Items Bid Code Range
0100 - 0193
0247 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0610 - 0686
1122 - 1122
2033 - 2240
3120 - 3282
5369 - 5369
6007 - 6986
7580 - 7580
8020 - 8994
100 2001 - 193 2036
Item No Description Units February 28, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     .250 3,841.48000 1
100 2002 PREPARING ROW STA     102.900 8,030.41788 6
104 2001 REMOVING CONC (PAV) SY     740.000 15.75000 1
104 2009 REMOVING CONC (RIPRAP) SY     663.000 15.32164 2
104 2017 REMOVING CONC (DRIVEWAYS) SY     103.000 21.60194 2
104 2022 REMOVING CONC (CURB AND GUTTER) LF     746.000 12.32909 3
104 2027 REMOVING CONC (APPR SLAB) SY     189.800 50.00000 1
104 2044 REMOVING CONC (FLUME) SY     2.000 150.00000 1
104 2054 REMOVING CONCRETE (MOW STRIP) LF     33,056.000 7.53309 2
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     207.000 15.00000 1
105 2012 REMOVING STAB BASE AND ASPH PAV (2" - 6" CY     283.000 16.25000 1
105 2035 REMOVING STAB BASE & ASPH PAV (0 - 2") SY     2,245.000 4.45000 1
105 2049 REMOVING STAB BASE & ASPH PAV (4" - 22") SY     928.000 11.50000 1
105 2061 REMOV STAB BASE & ASPH PAV (8" - 20") SY     16,471.000 8.50000 1
105 2074 REMOVING STAB BASE AND ASPH PAV (4") SY     4,698.600 40.57000 1
105 2097 REMOVING STAB BASE & ASPH PV (5" TO 13" SY     313.000 10.50000 1
110 2001 EXCAVATION (ROADWAY) CY     30,101.000 8.67869 5
110 2002 EXCAVATION (CHANNEL) CY     1,448.000 8.56319 3
112 2001 SUBGRADE WIDENING (ORD COMP) STA     165.000 199.45455 2
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     205.300 20.00000 1
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     511.000 15.00000 1
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     70,730.000 11.06243 6
134 2002 BACKFILL (TY B) STA     516.140 196.05795 4
134 2003 BACKFILL (TY C) STA     257.720 268.09328 2
134 2005 BACKFILL TY A CY     426.800 55.00000 1
150 2001 BLADING STA     90.920 133.02871 5
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     65,566.000 .93359 4
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     463.000 22.00000 1
162 2005 MULCH SODDING CY     422.000 25.00000 1
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     60,901.000 .24478 5
164 2009 BROADCAST SEED (TEMP) (WARM) SY     42,237.000 .19948 7
164 2011 BROADCAST SEED (TEMP) (COOL) SY     38,737.000 .19830 6
164 2013 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY SY     7,594.000 .38000 1
164 2043 DRILL SEEDING (TEMP) (COOL) SY     3,500.000 .44000 1
164 2054 BOND FBR MTRX SEED (PERM) (RURAL) (SAND) SY     93,325.000 .82221 7
164 2055 BONDED FBR MTRX SEED (TEMP) (WARM) SY     806.000 1.50000 1
164 2056 BONDED FBR MTRX SEED (TEMP) (COOL) SY     806.000 1.95000 1
168 2001 VEGETATIVE WATERING MG     3,833.800 12.46905 12
169 2004 SOIL RETENTION BLANKETS (CL 1) (TY D) SY     6,274.000 1.21820 2
169 2006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     200.000 7.50000 1
170 2003 IRRIGATION SYSTEM (TY II) LS     2.000 31,762.50000 1
192 2023 PLANT MATERIAL (15 GAL) (TREE) EA     275.000 75.00000 1
192 2025 PLANT MATERIAL (45 GAL) (TREE) EA     63.000 175.00000 1
192 2026 PLANT MATERIAL (65 GAL) (TREE) EA     11.000 300.00000 1
192 2033 PLANT MATERIAL (15 GAL) (SHRUB) EA     77.000 75.00000 1
193 2033 PLANT MNT LOC A MO     9.000 600.00000 1
193 2034 IRR SYS OP AND MNT LOC A MO     9.000 100.00000 1
193 2035 PLANT MNT LOC B MO     9.000 200.00000 1
193 2036 IRR SYS OP AND MNT LOC B MO     9.000 100.00000 1