| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | POTTER |
| Highway |
LP0335 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6157-73-001 |
| Proj ID |
RMC - 615773001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
174048.00 |
26397.00 |
105512.50 |
63.2 |
| Work Order |
10-23-07 |
| Work Began |
10-25-07 |
| Work Completed |
|
| Time Computed |
10-30-07 |
| Contract Working Days |
104 |
| Addl Days Granted |
0 |
| Working Days Charged |
31 |
| Percent Time Used |
29 |
| Contractor(s) |
| JA-GE FARMS, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6157-73-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07070401 |
|
Totals |
174048.00 |
26397.00 |
105512.50 |
63.2 |
|
| County | HUTCHINSON |
| Highway |
SH0207 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6157-74-001 |
| Proj ID |
RMC - 615774001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
178020.00 |
0.00 |
60812.00 |
34.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
11-13-07 |
| Work Began |
11-15-07 |
| Work Completed |
|
| Time Computed |
11-20-07 |
| Contract Working Days |
97 |
| Addl Days Granted |
0 |
| Working Days Charged |
25 |
| Percent Time Used |
25 |
| Contractor(s) |
| JA-GE FARMS, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6157-74-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07070402 |
|
Totals |
178020.00 |
0.00 |
60812.00 |
34.1 |
|
| County | RANDALL |
| Highway |
IH0027 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6157-75-001 |
| Proj ID |
RMC - 615775001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
253776.00 |
0.00 |
126948.00 |
51.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
09-27-07 |
| Work Began |
10-08-07 |
| Work Completed |
|
| Time Computed |
10-08-07 |
| Contract Working Days |
187 |
| Addl Days Granted |
0 |
| Working Days Charged |
51 |
| Percent Time Used |
27 |
| Contractor(s) |
| JA-GE FARMS, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6157-75-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07070403 |
|
Totals |
253776.00 |
0.00 |
126948.00 |
51.0 |
|
| County | ARMSTRONG |
| Highway |
US0287 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6157-76-001 |
| Proj ID |
RMC - 615776001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
208870.72 |
0.00 |
69219.20 |
33.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-04-07 |
| Work Began |
10-22-07 |
| Work Completed |
|
| Time Computed |
10-15-07 |
| Contract Working Days |
147 |
| Addl Days Granted |
0 |
| Working Days Charged |
9 |
| Percent Time Used |
6 |
| Contractor(s) |
| BERT WHITAKER |
SUBCONTRACTOR(S) FOR CCSJ: 6157-76-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04070404 |
|
Totals |
208870.72 |
0.00 |
69219.20 |
33.1 |
|
| County | CARSON |
| Highway |
US0060 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6157-77-001 |
| Proj ID |
RMC - 615777001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
138195.84 |
0.00 |
58881.08 |
44.8 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-16-07 |
| Work Began |
10-26-07 |
| Work Completed |
|
| Time Computed |
10-29-07 |
| Contract Working Days |
101 |
| Addl Days Granted |
0 |
| Working Days Charged |
7 |
| Percent Time Used |
6 |
| Contractor(s) |
| BERT WHITAKER |
SUBCONTRACTOR(S) FOR CCSJ: 6157-77-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04070405 |
|
Totals |
138195.84 |
0.00 |
58881.08 |
44.8 |
|
| County | OLDHAM |
| Highway |
IH0040 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6157-78-001 |
| Proj ID |
RMC - 615778001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
167110.00 |
32164.00 |
88011.00 |
53.2 |
| Work Order |
08-22-07 |
| Work Began |
09-10-07 |
| Work Completed |
|
| Time Computed |
09-12-07 |
| Contract Working Days |
123 |
| Addl Days Granted |
0 |
| Working Days Charged |
56 |
| Percent Time Used |
45 |
| Contractor(s) |
| JA-GE FARMS, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6157-78-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07070404 |
|
Totals |
167110.00 |
32164.00 |
88011.00 |
53.2 |
|
| County | GRAY |
| Highway |
IH0040 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6157-79-001 |
| Proj ID |
RMC - 615779001 |
| Work Type |
MOWING HIGHWAY RIGHT OF WAY |
| |
|
0.001 |
206349.10 |
24094.57 |
74372.66 |
36.6 |
| Work Order |
10-08-07 |
| Work Began |
10-23-07 |
| Work Completed |
|
| Time Computed |
10-18-07 |
| Contract Working Days |
154 |
| Addl Days Granted |
0 |
| Working Days Charged |
35 |
| Percent Time Used |
22 |
| Contractor(s) |
| ALL HANDS & DUKE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6157-79-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04070407 |
|
Totals |
206349.10 |
24094.57 |
74372.66 |
36.6 |
|
| County | OLDHAM |
| Highway |
IH0040 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6160-46-001 |
| Proj ID |
SUP - 616046001 |
| Work Type |
DEBRIS PICKUP AND DISPOSAL |
| |
|
0.001 |
102336.00 |
1968.00 |
62976.00 |
61.5 |
| Work Order |
04-16-07 |
| Work Began |
05-01-07 |
| Work Completed |
|
| Time Computed |
05-01-07 |
| Contract Working Days |
720 |
| Addl Days Granted |
0 |
| Working Days Charged |
487 |
| Percent Time Used |
67 |
| Contractor(s) |
TIBH INDUSTRIES, INC. CONCHO RESOURCE CENTER |
SUBCONTRACTOR(S) FOR CCSJ: 6160-46-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03070421 |
|
Totals |
102336.00 |
1968.00 |
62976.00 |
61.5 |
|
| County | HARTLEY |
| Highway |
US0087 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6161-42-001 |
| Proj ID |
RMC - 616142001 |
| Work Type |
PICNIC AREA MAINTENANCE & LITTER PICKUP |
| |
|
0.001 |
66326.00 |
1776.00 |
42207.00 |
63.6 |
| Work Order |
06-21-07 |
| Work Began |
06-28-07 |
| Work Completed |
|
| Time Computed |
06-28-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
438 |
| Percent Time Used |
60 |
| Contractor(s) |
| PBS PARK SERVICE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6161-42-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05070402 |
|
Totals |
66326.00 |
1776.00 |
42207.00 |
63.6 |
|
| County | OLDHAM |
| Highway |
IH0040 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6162-60-001 |
| Proj ID |
SUP - 616260001 |
| Work Type |
SPOT LITTER (STATE USE) |
| |
|
0.001 |
13374.24 |
557.26 |
10030.68 |
75.0 |
| Work Order |
04-16-07 |
| Work Began |
05-01-07 |
| Work Completed |
|
| Time Computed |
05-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
487 |
| Percent Time Used |
66 |
| Contractor(s) |
TIBH INDUSTRIES, INC. CONCHO RESOURCE CENTER |
SUBCONTRACTOR(S) FOR CCSJ: 6162-60-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04070420 |
|
Totals |
13374.24 |
557.26 |
10030.68 |
75.0 |
|
| County | OLDHAM |
| Highway |
IH0040 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6162-61-001 |
| Proj ID |
SUP - 616261001 |
| Work Type |
PICNIC AREA MAINTENANCE |
| |
|
0.001 |
98604.00 |
3375.52 |
71451.56 |
72.4 |
| Work Order |
04-16-07 |
| Work Began |
05-01-07 |
| Work Completed |
|
| Time Computed |
05-01-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
487 |
| Percent Time Used |
66 |
| Contractor(s) |
TIBH INDUSTRIES, INC. CONCHO RESOURCE CENTER |
SUBCONTRACTOR(S) FOR CCSJ: 6162-61-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04070421 |
|
Totals |
98604.00 |
3375.52 |
71451.56 |
72.4 |
|
| County | HANSFORD |
| Highway |
SH0015 |
| From |
FIVE (5) COUNTIES |
| To |
FIVE (5) COUNTIES |
| CSJ |
6165-51-001 |
| Proj ID |
RMC - 616551001 |
| Work Type |
CLEANING AND SWEEPING HIGHWAYS |
| |
|
1.000 |
125400.00 |
10450.00 |
52250.00 |
41.6 |
| Work Order |
10-01-07 |
| Work Began |
10-08-07 |
| Work Completed |
|
| Time Computed |
10-08-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
354 |
| Percent Time Used |
48 |
| Contractor(s) |
| AUBREY NELSON |
SUBCONTRACTOR(S) FOR CCSJ: 6165-51-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08070403 |
|
Totals |
125400.00 |
10450.00 |
52250.00 |
41.6 |
|
| County | CARSON |
| Highway |
US0060 |
| From |
SEE PLANS |
| To |
SEE PLANS |
| CSJ |
6166-52-001 |
| Proj ID |
RMC - 616652001 |
| Work Type |
SWEEPING OF HIGHWAYS AND BRIDGES |
| |
|
1.000 |
323500.00 |
0.00 |
90980.00 |
28.1 |
| Work Order |
12-03-07 |
| Work Began |
12-19-07 |
| Work Completed |
|
| Time Computed |
12-17-07 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
294 |
| Percent Time Used |
40 |
| Contractor(s) |
| PANHANDLE SWEEPING & MAINTENANCE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6166-52-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10070403 |
|
Totals |
323500.00 |
0.00 |
90980.00 |
28.1 |
|
| County | CARSON |
| Highway |
US0060 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6167-64-001 |
| Proj ID |
RMC - 616764001 |
| Work Type |
PICNIC AREA MAINTENANCE |
| |
|
1.000 |
13590.04 |
307.32 |
4426.80 |
32.5 |
| Work Order |
01-11-08 |
| Work Began |
02-04-08 |
| Work Completed |
|
| Time Computed |
02-01-08 |
| Contract Working Days |
730 |
| Addl Days Granted |
0 |
| Working Days Charged |
257 |
| Percent Time Used |
35 |
| Contractor(s) |
| LEONARD MORRIS |
SUBCONTRACTOR(S) FOR CCSJ: 6167-64-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12070401 |
|
Totals |
13590.04 |
307.32 |
4426.80 |
32.5 |
|
| County | ARMSTRONG |
| Highway |
US0287 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6167-68-001 |
| Proj ID |
RMC - 616768001 |
| Work Type |
PINIC AREA MAINTENANCE |
| |
|
1.000 |
46499.80 |
1311.20 |
16767.80 |
36.0 |
| Work Order |
12-03-07 |
| Work Began |
12-03-07 |
| Work Completed |
|
| Time Computed |
12-03-07 |
| Contract Working Days |
720 |
| Addl Days Granted |
0 |
| Working Days Charged |
297 |
| Percent Time Used |
41 |
| Contractor(s) |
| PBS PARK SERVICE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6167-68-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10070404 |
|
Totals |
46499.80 |
1311.20 |
16767.80 |
36.0 |
|
| County | RANDALL |
| Highway |
IH0027 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6167-92-001 |
| Proj ID |
RMC - 616792001 |
| Work Type |
PICNIC AREA MAINTENANCE |
| |
|
0.001 |
24998.06 |
370.32 |
9420.38 |
37.6 |
| Work Order |
11-15-07 |
| Work Began |
11-26-07 |
| Work Completed |
|
| Time Computed |
11-26-07 |
| Contract Working Days |
720 |
| Addl Days Granted |
0 |
| Working Days Charged |
310 |
| Percent Time Used |
43 |
| Contractor(s) |
| LEONARD MORRIS |
SUBCONTRACTOR(S) FOR CCSJ: 6167-92-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10070405 |
|
Totals |
24998.06 |
370.32 |
9420.38 |
37.6 |
|
| County | HUTCHINSON |
| Highway |
SH0136 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6171-25-001 |
| Proj ID |
RMC - 617125001 |
| Work Type |
LANE BLADING OF ROADWAY SNOW AND / OR ICE |
| |
|
1.000 |
112500.00 |
0.00 |
2700.00 |
2.4 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
12-13-07 |
| Work Began |
12-13-07 |
| Work Completed |
|
| Time Computed |
12-13-07 |
| Contract Working Days |
300 |
| Addl Days Granted |
0 |
| Working Days Charged |
77 |
| Percent Time Used |
25 |
| Contractor(s) |
| E. D. BAKER COMPANY, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6171-25-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11070401 |
|
Totals |
112500.00 |
0.00 |
2700.00 |
2.4 |
|
| County | CARSON |
| Highway |
IH0040 |
| From |
EASTERN POTTER COUNTY LINE |
| To |
WESTERN WHEELER COUNTY LINE |
| CSJ |
6172-14-001 |
| Proj ID |
SUP - 617214001 |
| Work Type |
DEBRIS PICKUP AND DISPOSAL |
| |
|
64.000 |
34112.00 |
1968.00 |
20992.00 |
61.5 |
| Work Order |
01-02-08 |
| Work Began |
01-14-08 |
| Work Completed |
|
| Time Computed |
01-14-08 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
322 |
| Percent Time Used |
88 |
| Contractor(s) |
TIBH INDUSTRIES, INC. CONCHO RESOURCE CENTER |
SUBCONTRACTOR(S) FOR CCSJ: 6172-14-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12070420 |
|
Totals |
34112.00 |
1968.00 |
20992.00 |
61.5 |
|
| County | POTTER |
| Highway |
IH0040 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6175-56-001 |
| Proj ID |
RMC - 617556001 |
| Work Type |
ASBESTOS ABATEMENT OF CTB |
| |
|
0.001 |
86322.60 |
54162.00 |
54162.00 |
62.7 |
| Work Order |
10-15-08 |
| Work Began |
11-03-08 |
| Work Completed |
|
| Time Computed |
11-03-08 |
| Contract Working Days |
40 |
| Addl Days Granted |
0 |
| Working Days Charged |
21 |
| Percent Time Used |
52 |
| Contractor(s) |
| CLASSIC CITY UTILITY, INC |
SUBCONTRACTOR(S) FOR CCSJ: 6175-56-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
09080403 |
|
Totals |
86322.60 |
54162.00 |
54162.00 |
62.7 |
|
| County | POTTER |
| Highway |
IH0040 |
| From |
SEE PLAN SHEETS |
| To |
SEE PLAN SHEETS |
| CSJ |
6175-62-001 |
| Proj ID |
RMC - 617562001 |
| Work Type |
LITTER PICKUP AND DISPOSAL |
| |
|
0.001 |
131001.04 |
10083.42 |
90750.78 |
69.2 |
| Work Order |
03-07-08 |
| Work Began |
03-11-08 |
| Work Completed |
|
| Time Computed |
03-13-08 |
| Contract Working Days |
365 |
| Addl Days Granted |
0 |
| Working Days Charged |
263 |
| Percent Time Used |
72 |
| Contractor(s) |
| J. H. ENTERPRISE |
SUBCONTRACTOR(S) FOR CCSJ: 6175-62-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02080402 |
|
Totals |
131001.04 |
10083.42 |
90750.78 |
69.2 |
|