AVERAGE LOW BID UNIT PRICE - MAINTENANCE - AMARILLO DISTRICT

Last Update: Thursday, March 20, 2014
ITEMS 712 2005 TO 788 2001
Items Items Bid Code Range
0104 - 0169
0314 - 0361
0401 - 0496
0502 - 0530
0644 - 0681
0712 - 0788
1122 - 1122
3268 - 3268
4013 - 4013
6834 - 6834
7009 - 7009
8251 - 8251
712 2005 - 788 2001
Item No Description Units February 28, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     427.150 377.76999 1
730 2001 STRIP MOWING AC     6,371.000 24.97857 2
730 2002 FULL - WIDTH MOWING AC     10,506.000 23.45574 2
730 2003 SPOT MOWING AC     800.000 18.50000 2
738 2003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC 8.000 29,500.00000 8.000 29,500.00000 1
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI 64.916 100.00000 64.916 100.00000 1
738 2010 CLEANING / SWEEPING (SPOT) MI 25.000 75.00000 50.000 62.50000 2
738 2011 CLEANING / SWEEPING (HANDWORK) SY     60.000 25.00000 1
738 2094 CLEAN / SWEEP - CENTER MEDIAN - AREA (1) CYC     8.000 5,180.00000 1
738 2095 CLEAN / SWEEP - CENTER MEDIAN - AREA (2) CYC     8.000 5,180.00000 1
738 2114 CLEAN / SWEEP - OUTSIDE MAIN LANE - AREA (1) CYC     8.000 5,180.00000 1
738 2115 CLEAN / SWEEP - OUTSIDE MAIN LANE - AREA (2) CYC     8.000 5,180.00000 1
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     0.100 20,000.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA     6.000 250.00000 1
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     1,000.000 17.00000 1
770 2006 REALIGN POSTS EA     2,000.000 13.40000 3
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     200.000 86.94500 3
770 2030 REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED LF     36,000.000 11.02250 3
770 2036 REPL SGT IMPACT HEAD (FURNISHED) EA     100.000 253.76750 3
770 2038 INSTALL BLOCKOUTS (FURNISHED) EA     500.000 31.61750 3
770 2039 REM / REPL TIM / STL POST W CONC FND (FURN EA     155.000 66.05516 3
770 2040 RAISE RAIL ELEMENT LF     2,000.000 6.42250 3
770 2043 REPLACE SINGLE GDRAIL TERM POST (FURN) EA     30.000 200.00000 3
770 2044 REPLACE SGT CABLE ANCHOR (FURN) EA     400.000 28.39000 3
770 2045 REPLACE SGT CABLE ASSEMBLY (FURN) EA     400.000 28.26750 3
770 2046 REPLACE SGT STRUT (FURN) EA     400.000 39.56750 3
770 2047 REPAIR RAIL ELEMENT (THRIE - BEAM) (FURN) LF     200.000 8.47000 3
770 2048 REP RAIL ELMNT (THRIE - BM TRANS) (FURN) LF     200.000 9.01750 3
770 2050 REM / REP TIM / STL POST W / O CONC FND (FURN EA     400.000 47.03500 3
788 2001 CONCRETE BEAM REPAIR EA     5.000 5,000.00000 1