AVERAGE LOW BID UNIT PRICE - MAINTENANCE - AMARILLO DISTRICT

Last Update: Thursday, July 24, 2014
ITEMS 712 2005 TO 788 2001
Items Items Bid Code Range
0104 - 0169
0247 - 0251
0310 - 0361
0401 - 0496
0500 - 0544
0644 - 0681
0712 - 0788
1122 - 1122
3267 - 3268
4013 - 4013
6834 - 6834
8251 - 8251
712 2005 - 788 2001
Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     427.150 377.76999 1
730 2001 STRIP MOWING AC     7,991.000 24.62291 7
730 2002 FULL - WIDTH MOWING AC     90,539.000 23.07973 8
730 2003 SPOT MOWING AC     2,800.000 22.09571 7
734 2002 LITTER REMOVAL CYC     216.000 1,231.48000 1
734 2003 LITTER REMOVAL (SPOT) AC     100.000 100.00000 1
738 2003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC     8.000 29,500.00000 1
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     64.916 100.00000 1
738 2010 CLEANING / SWEEPING (SPOT) MI     25.000 75.00000 1
738 2011 CLEANING / SWEEPING (HANDWORK) SY     60.000 25.00000 1
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     0.100 20,000.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA 12.000 573.40000 18.000 465.60000 2
752 2028 TREE REMOVAL (42" - 48" DIA) EA 1.000 3,660.00000 1.000 3,660.00000 1
770 2006 REALIGN POSTS EA     1,000.000 15.00000 2
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     100.000 78.29000 2
770 2030 REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED LF     18,000.000 13.04500 2
770 2036 REPL SGT IMPACT HEAD (FURNISHED) EA     50.000 321.28500 2
770 2038 INSTALL BLOCKOUTS (FURNISHED) EA     250.000 40.63500 2
770 2039 REM / REPL TIM / STL POST W CONC FND (FURN EA     80.000 75.06000 2
770 2040 RAISE RAIL ELEMENT LF     1,000.000 4.94500 2
770 2043 REPLACE SINGLE GDRAIL TERM POST (FURN) EA     20.000 175.00000 2
770 2044 REPLACE SGT CABLE ANCHOR (FURN) EA     200.000 5.98000 2
770 2045 REPLACE SGT CABLE ASSEMBLY (FURN) EA     200.000 5.73500 2
770 2046 REPLACE SGT STRUT (FURN) EA     200.000 5.78500 2
770 2047 REPAIR RAIL ELEMENT (THRIE - BEAM) (FURN) LF     100.000 7.29000 2
770 2048 REP RAIL ELMNT (THRIE - BM TRANS) (FURN) LF     100.000 6.73500 2
770 2050 REM / REP TIM / STL POST W / O CONC FND (FURN EA     200.000 50.62000 2
788 2001 CONCRETE BEAM REPAIR EA     5.000 5,000.00000 1