| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | HOWARD |
| Highway |
IH 20 |
| From |
AT US 87 (NEW LOCATION) |
| To |
. |
| CSJ |
0005-05-102 |
| Proj ID |
DMO 2012(263) |
| Work Type |
CONSTRUCT NEW INTERCHANGE |
| |
|
2.719 |
18434933.58 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
01-01-14 |
| Contract Working Days |
470 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| DELHUR INDUSTRIES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0005-05-102 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133202 |
|
Totals |
18434933.58 |
0.00 |
0.00 |
0.0 |
|
| County | HOWARD |
| Highway |
BI 20-G |
| From |
US 87 |
| To |
SH 350 |
| CSJ |
0005-10-015 |
| Proj ID |
STP 2012(144) |
| Work Type |
PLAN, ASB, ACP, SIDWLK, AND PAV MRK |
| |
|
0.652 |
3812216.32 |
592744.38 |
3248127.57 |
85.2 |
| Work Order |
02-06-12 |
| Work Began |
04-11-12 |
| Work Completed |
|
| Time Computed |
04-09-12 |
| Contract Working Days |
193 |
| Addl Days Granted |
40 |
| Working Days Charged |
225 |
| Percent Time Used |
96 |
| Contractor(s) |
| PRICE CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0005-10-015 JAVELINA CONSTRUCTION SOUTH, INC.(1.27%) NITE LITE, INC.(1.44%) WILLIS ELECTRIC CO., LP( 12.56%) W.S. CONSTRUCTION COMPANY( 20.82%) TEX OP CONSTRUCTION, LP(0.79%) UNITED RENTALS HIGHWAY TECHNOLOGIES (NEWELL RD-FTWORTH)(0.56%) TOTAL HIGHWAY MAINTENANCE, LLC (1.46%)
|
| Contract # |
12113221 |
|
Totals |
3812216.32 |
592744.38 |
3248127.57 |
85.2 |
|
| County | HOWARD |
| Highway |
BI 20-G |
| From |
NEAR JONES STREET IN BIG SPRING |
| To |
US 87 |
| CSJ |
0005-10-016 |
| Proj ID |
DMO 2013(423) |
| Work Type |
REHABILITATION, ACP, SIDEWALKS |
| |
|
1.092 |
5646935.90 |
387514.08 |
387514.08 |
6.8 |
| Work Order |
03-12-13 |
| Work Began |
04-04-13 |
| Work Completed |
|
| Time Computed |
03-28-13 |
| Contract Working Days |
170 |
| Addl Days Granted |
0 |
| Working Days Charged |
23 |
| Percent Time Used |
13 |
| Contractor(s) |
| PRICE CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0005-10-016 CONTRACTORS SERVICE COMPANY(0.30%) TEX OP CONSTRUCTION, LP(2.51%) TOTAL HIGHWAY MAINTENANCE, LLC (0.91%) WILLIS ELECTRIC CO., LP(0.29%) W.S. CONSTRUCTION COMPANY( 23.45%)
|
| Contract # |
01133206 |
|
Totals |
5646935.90 |
387514.08 |
387514.08 |
6.8 |
|
| County | NOLAN |
| Highway |
IH 20 ETC |
| From |
LAMAR ST ON RAMP (FTG RDS ONLY) |
| To |
HOPKINS RD OFF RAMP |
| CSJ |
0006-02-108 |
| Proj ID |
STP 2013(149) |
| Work Type |
SEAL COAT |
| |
|
88.478 |
3445319.70 |
0.00 |
714850.44 |
20.7 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
12-03-12 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
30 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| NORTHEASTERN PAVERS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0006-02-108 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
11123018 |
|
Totals |
3445319.70 |
0.00 |
714850.44 |
20.7 |
|
| County | TAYLOR |
| Highway |
IH 20 |
| From |
PINE STREET |
| To |
LP 322__(FRONTAGE ROADS ONLY) |
| CSJ |
0006-06-093 |
| Proj ID |
IM 0202(234) |
| Work Type |
SUBGR, FL BS, C & G, SURF, SGNS, ILLUM, SGL |
| |
|
3.961 |
12481302.25 |
1474371.39 |
5000638.65 |
40.0 |
| Work Order |
08-28-12 |
| Work Began |
10-25-12 |
| Work Completed |
|
| Time Computed |
10-25-12 |
| Contract Working Days |
416 |
| Addl Days Granted |
0 |
| Working Days Charged |
111 |
| Percent Time Used |
26 |
| Contractor(s) |
| J. H. STRAIN & SONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0006-06-093 WILLIS ELECTRIC CO., LP(5.88%) TEXAS ALTERNATIVE GRASSER, INC.(0.10%) CONTRACTORS SERVICE COMPANY(0.67%) D. I. J. CONSTRUCTION, INC.(1.08%) RPV CONSTRUCTION (2.48%) KARMY CONSTRUCTION INC (8.14%) FARR FOUNDATION, INC.(0.82%)
|
| Contract # |
06123002 |
|
Totals |
12481302.25 |
1474371.39 |
5000638.65 |
40.0 |
|
| County | CALLAHAN |
| Highway |
IH 20 |
| From |
AT FM 603 |
| To |
. |
| CSJ |
0006-07-072 |
| Proj ID |
IM 0202(239)G |
| Work Type |
SAFETY LIGHTING |
| |
|
1.945 |
443023.24 |
52821.00 |
52821.00 |
11.9 |
| Work Order |
02-22-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
05-23-13 |
| Contract Working Days |
67 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0006-07-072 TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (4.33%)
|
| Contract # |
12123011 |
|
Totals |
443023.24 |
52821.00 |
52821.00 |
11.9 |
|
| County | TAYLOR |
| Highway |
BI 20-R |
| From |
AT RAINY CREEK (PSN 49) |
| To |
. |
| CSJ |
0006-18-051 |
| Proj ID |
BR 2013(370) |
| Work Type |
BRIDGE REPLACEMENT |
| |
|
1.187 |
2400617.08 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-10-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
217 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| REECE CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0006-18-051 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02133029 |
|
Totals |
2400617.08 |
0.00 |
0.00 |
0.0 |
|
| County | SCURRY |
| Highway |
US 84 |
| From |
EAST OF HERMLEIGH |
| To |
NEAR BU 84-G E OF SNYDER (WB ONLY) |
| CSJ |
0053-09-069 |
| Proj ID |
NH 2013(487) |
| Work Type |
DEEP MILL FILL DR LN, SEAL, OVERLAY |
| |
|
7.013 |
2338232.48 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
38 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| CONTRACT PAVING CO. |
SUBCONTRACTOR(S) FOR CCSJ: 0053-09-069 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03133231 |
|
Totals |
2338232.48 |
0.00 |
0.00 |
0.0 |
|
| County | SHACKELFORD |
| Highway |
FM 601 |
| From |
AT HUBBARD CREEK |
| To |
. |
| CSJ |
0107-03-013 |
| Proj ID |
BR 2013(520) |
| Work Type |
REHABILITATE BRIDGE |
| |
|
0.107 |
545125.27 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
88 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| GIBSON & ASSOCIATES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0107-03-013 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133025 |
|
Totals |
545125.27 |
0.00 |
0.00 |
0.0 |
|
| County | HASKELL |
| Highway |
US 277 |
| From |
FM 618 |
| To |
NEAR BU 277-F (SBL ONLY) |
| CSJ |
0157-04-045 |
| Proj ID |
STP 2013(371) |
| Work Type |
MILLING, SPOT BASE REP & SURFACING |
| |
|
8.357 |
3020841.60 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-03-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
80 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ZACK BURKETT CO. |
SUBCONTRACTOR(S) FOR CCSJ: 0157-04-045 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02133017 |
|
Totals |
3020841.60 |
0.00 |
0.00 |
0.0 |
|
| County | NOLAN |
| Highway |
BS 70-G |
| From |
AVENUE B IN SWEETWATER |
| To |
IH 20 |
| CSJ |
0264-01-036 |
| Proj ID |
STP 2013(372) |
| Work Type |
REHABILITATION, ACP, SIDEWALKS |
| |
|
1.287 |
6493251.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
318 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| J. H. STRAIN & SONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0264-01-036 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02133222 |
|
Totals |
6493251.00 |
0.00 |
0.00 |
0.0 |
|
| County | NOLAN |
| Highway |
SH 70 |
| From |
SH 153 |
| To |
APPROX 1.85 MI SOUTH OF FM 1809 |
| CSJ |
0264-02-026 |
| Proj ID |
STP 2012(441) |
| Work Type |
ACP OVERLAY |
| |
|
10.532 |
2989281.52 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-23-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
60 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| NOBLES ROAD CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0264-02-026 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02133022 |
|
Totals |
2989281.52 |
0.00 |
0.00 |
0.0 |
|
| County | TAYLOR |
| Highway |
VA |
| From |
VARIOUS LOCATIONS IN |
| To |
THE ABILENE DISTRICT |
| CSJ |
0908-00-078 |
| Proj ID |
STP 2013(310) |
| Work Type |
CURB RAMPS |
| |
|
1.000 |
345815.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-15-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
05-01-13 |
| Contract Working Days |
126 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| TI-ZACK CONCRETE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0908-00-078 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01133023 |
|
Totals |
345815.00 |
0.00 |
0.00 |
0.0 |
|
| County | FISHER |
| Highway |
CR |
| From |
CR 135 |
| To |
AT COTTONWOOD CK |
| CSJ |
0908-23-031 |
| Proj ID |
BR 2011(765) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.060 |
211697.50 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
59 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| J. H. STRAIN & SONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0908-23-031 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133014 |
|
Totals |
211697.50 |
0.00 |
0.00 |
0.0 |
|
| County | FISHER |
| Highway |
CR |
| From |
CR 246 |
| To |
AT CLEAR FORK BRAZOS |
| CSJ |
0908-23-032 |
| Proj ID |
BR 2011(766) |
| Work Type |
REPLACE BRIDGE |
| |
|
0.084 |
276103.90 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
60 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HODGES AND SON CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0908-23-032 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133016 |
|
Totals |
276103.90 |
0.00 |
0.00 |
0.0 |
|
| County | FISHER |
| Highway |
CR |
| From |
ON CR 322 (160) |
| To |
AT CLEAR FORK OF BRAZOS (PSN 1) |
| CSJ |
0908-23-033 |
| Proj ID |
BR 2011(767) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.001 |
254268.88 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
57 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HODGES AND SON CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0908-23-033 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133214 |
|
Totals |
254268.88 |
0.00 |
0.00 |
0.0 |
|
| County | JONES |
| Highway |
VA |
| From |
FORT PHANTOM HILL_VISITOR CENTER |
| To |
. |
| CSJ |
0908-24-036 |
| Proj ID |
STP 2000(517)TE |
| Work Type |
SCENIC OR HISTORIC HIGHWAY PROGRAM |
| |
|
0.001 |
649700.00 |
0.00 |
569827.00 |
87.7 |
| Work Order |
03-05-12 |
| Work Began |
03-13-12 |
| Work Completed |
|
| Time Computed |
03-21-12 |
| Contract Working Days |
180 |
| Addl Days Granted |
0 |
| Working Days Charged |
125 |
| Percent Time Used |
69 |
| Contractor(s) |
| J. H. STRAIN & SONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0908-24-036 JUSTICE CONSTRUCTION COMPANY ( 61.56%) BONTKE BROTHERS CONSTRUCTION COMPANY (2.53%) KELLEY MASONRY, INC. ( 11.46%) WYATT ELECTRICAL SERVICES, INC.(3.30%) LONGMIRE PLUMBING, INC.(3.82%) SOUTHWEST AIR CONDITIONING & HEATING (2.01%) DEAN HAGLER, INC.(0.19%)
|
| Contract # |
01123228 |
|
Totals |
649700.00 |
0.00 |
569827.00 |
87.7 |
|
| County | HOWARD |
| Highway |
FM 1785 |
| From |
ON FM 1785 |
| To |
AT PLUM CREEK |
| CSJ |
1155-03-009 |
| Proj ID |
BR 2013(521) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.001 |
633633.67 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
128 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| A GREATER AUSTIN DEVELOPMENT CONCRETE CONSTRUCTION, L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 1155-03-009 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133220 |
|
Totals |
633633.67 |
0.00 |
0.00 |
0.0 |
|
| County | TAYLOR |
| Highway |
LP 322 |
| From |
IH 20 SOUTH FTG RD |
| To |
CEDAR CREEK |
| CSJ |
2398-01-046 |
| Proj ID |
NH 2013(373) |
| Work Type |
SPOT BASE RPR, UND SL, OV, MBGF |
| |
|
5.959 |
3787564.95 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
92 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| J. H. STRAIN & SONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 2398-01-046 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02133213 |
|
Totals |
3787564.95 |
0.00 |
0.00 |
0.0 |
|
| County | MITCHELL |
| Highway |
FM 670 |
| From |
AT GLAZE CREEK |
| To |
. |
| CSJ |
2471-01-009 |
| Proj ID |
BR 2012(679) |
| Work Type |
REPLACE BRIDGE |
| |
|
0.001 |
782134.95 |
170343.70 |
602629.24 |
77.0 |
| Work Order |
09-24-12 |
| Work Began |
12-04-12 |
| Work Completed |
|
| Time Computed |
10-10-12 |
| Contract Working Days |
127 |
| Addl Days Granted |
0 |
| Working Days Charged |
107 |
| Percent Time Used |
84 |
| Contractor(s) |
| A GREATER AUSTIN DEVELOPMENT CONCRETE CONSTRUCTION, L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 2471-01-009 WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(2.78%) HJC FARMS, INC.(2.05%) M & D FOUNDATION DRILLING INDUSTRIES, INC. (4.17%) SOUTHEAST GRINDING & GROOVING, LLC (0.56%) HIGHWAY TECHNOLOGIES, INC. (1.04%) WEST TEXAS BARRICADES, LTD DBA BARRICADES UNLIMITED(2.04%) NOBLES ROAD CONSTRUCTION, INC. ( 18.12%) NORTH TEXAS REBAR, LLC (0.19%)
|
| Contract # |
08123030 |
|
Totals |
782134.95 |
170343.70 |
602629.24 |
77.0 |
|