AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - ABILENE DISTRICT

Last Update: Monday, March 31, 2014
ITEMS 730 2002 TO 788 2001
Items Items Bid Code Range
0100 - 0192
0247 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0788
1122 - 1122
2131 - 2137
3267 - 3278
4116 - 4116
5392 - 5993
6266 - 6834
8251 - 8945
730 2002 - 788 2001
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
730 2002 FULL - WIDTH MOWING AC     217.660 60.32468 2
784 2010 REPAIR STL BRIDGE MEMBER (BEARINGS) EA     2.000 8,500.00000 1
784 2011 REP STL BRIDGE MEMBER (BOTTOM CHORD) EA     1.000 3,375.00000 1
784 2013 REP STL BRIDGE MEMBER (ENDPOST) EA     2.000 1,525.00000 1
784 2058 REP STL BRIDGE MEMBER (FLOORBEAM) EA     1.000 4,800.00000 1
784 2064 REP STL BRIDGE MEMBER (STRINGER) EA     2.000 4,800.00000 1
788 2001 CONCRETE BEAM REPAIR EA     2.000 2,650.00000 1