This page contains a list of common mistakes to avoid. The items are listed in the order that they appear in the review process.
Page Index
The reviewer must email the fabricator or detailing office within 2 business days of receiving a new submittal, confirming reception of a valid submittal. Failure to do so removes one aspect of the process designed to keep all parties informed of the whereabouts and status of submittals, and has led to project delays.

Figure: Confirmation Example (From Submittal Guide Appendix)
Remember: Red items are kept when flattening, all other colors are removed. Make sure your approval stamp "property" is red, and at least the first text character in any text box is red.
Note: Always check the post-flattened product to make sure all necessary stamps and markups have remained before setting security and distributing.

Figure: Stamp Properties: Color: "Red"

Figure: Text Box Text Properties - Text Color: "Red"
Inspection prints of approved shop plan sets are usually monochrome, so always "cloud" corrections to make them stand out in a black and white print.

Figure: Cloud all correction markups.

Figure: Beam Index Sheet (5197 values)

Figure: Beam Details Sheet (5197 values)
Custom Adobe Acrobat Tools Help
For help using TxDOT's Customized Tools for Adobe Acrobat, look under Tools on the main menu and select TxDOT. At the bottom of the TxDOT Tools window, select Help. Adobe tutorial aids are also available.

Figure: TxDOT Tools Help location.
Flattening prevents removal of markups; password security prevents additions. Always use both security methods to insure the integrity of the document.

Figure: Tools/TxDOT/"Flatten" documents first
Then finalize the document by adding password security:

Figure: File/Document Properties/Security/Password Security - Settings, check "Restrict editing" box.
Always CC the Construction Division (CST_ShopDrawings@dot.state.tx.us ) when sending out approved shop plan sets. The approved shop plan copy is needed for inspecting every product prior to acceptance and delivery to the job site.

Figure: TxDOT/Construction Div./Materials and Pavements approval stamp on a prestressed concrete beam.
(per P.7 of the Guide to Electronic Shop Drawing Submittal )
All of the below offices must receive a copy of all approved shop plan sets:

Figure: Example Distribution email showing typical primary ("C") and CC ("B") recipients. (From Submittal Guide Appendix.)
More Information