SP000-3080  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0704-03-014 in Hall County. Directs the Contractor's attention to outstanding utilities to be adjusted and expected dates of completion of those adjustments. One-Time Use.
SP000-3079  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0790-03-023 in Sherman County. Notifies the Contractor of uncleared utilities within the project limits and the anticipated clearance dates. One-Time Use.
SP000-3078  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0508-07-286 in Harris County. Notifies the Contractor of uncleared utilities and right of way within the project limits and the anticipated clearance dates. One-Time Use.
SP000-3077  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1873-02-022 in Scurry County. Notifies the Contractor of uncleared utilities within the project limits and the anticipated clearance date. One-Time Use.
SP000-3076  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 3409-01-004 in Bell County. Notifies the Contractor of uncleared utilities within the project limits and the anticipated clearance date. One-Time Use.
SP000-3075  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 2174-01-016 in McLennan County. Notifies the Contractor of uncleared utilities within the project limits and anticipated clearance dates. One-Time Use.
SP000-3074  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0913-22-043 in Gonzales County. The Provision is required for uncleared utilities. One-Time Use.
SP000-3073  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0051-02-088 in Harris County. As of November 11, 2014, utilities, right of way, and encroachment within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3072  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0291-01-049 in Gillespie County. As of May 14, 2013, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3070  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1316-01-059 in Brazos County. Notifies the Contractor of utilities that have not been adjusted, as of the aforementioned date. One-Time Use.
SP000-3069  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0768-02-020 in Hunt County. Notifies Contractor of unacquired right of way. One-Time Use.
SP000-3068  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0768-02-020 in Hunt County. Notifies Contractor that utilities have not been cleared on this project. One-Time Use.
SP000-3067  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0704-03-014 in Hall County. The following outstanding right of way is expected to be acquired by the date shown. One-Time Use.
SP000-3066  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0353-02-063 in Denton County. This Special Provision is for unclear ROW, utilities and relocations for this project. One-Time Use.
SP000-3065  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 3392-01-008 in Collin County. The Contractor's attention is directed to the fact that certain utility adjustments have not been completed. One-Time Use.
SP000-3064  PDF  RTF  Important Notice to Contractors - For project 0220-03-027 in Cameron County. The Contractor's attention is directed to the fact that certain utility adjustments have not been completed. One-Time Use.
SP000-3063  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0036-05-033 in Real County. This Special Provision provides a list of unclear utilities One-Time Use.
SP000-3062  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1186-01-087 in Travis County. Notifies the Contractor of uncleared utilities within the project limits, provides an estimated date of clearance, and describes the effect on construction. One-Time Use.
SP000-3061  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0913-09-061 in Wharton County. The Provision is required for uncleared utilities. One-Time Use.
SP000-3060  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0135-11-018 in Collin County. This Special Provision is for unclear ROW, Relocation and Utility One-Time Use.
SP000-3059  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0912-34-144 in Fort Bend County. Relocations within the project limits have been cleared except utilities. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3058  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0688-02-055 in Lamar County. This special provision informs the contractor of utilities identified to be cleared.. One-Time Use.
SP000-3057  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1190-01-043 in Hill County. The Contractor’s attention is directed to the fact as of August 1, 2014 that the utilities listed below have not been adjusted. The State anticipates the adjustments to be included in the highway construction contract for the utilities. One-Time Use.
SP000-3056  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 3205-02-019 in Colorado County. The Provision is required for uncleared utilities. One-Time Use.
SP000-3055  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1315-01-025 in Denton County. Update per FM 1385 ROW and UTILITY Certifications One-Time Use.
SP000-3054  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 2121-02-137 in El Paso County. Informs the Contractor of outstanding utilities. One-Time Use.
SP000-3053  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 2121-02-137 in El Paso County. The Contractor’s attention is directed to the fact that as of August 19, 2014, there are various parcels that have not been acquired, but will be acquired by the dates set out below. One-Time Use.
SP000-3052  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0619-05-036 in Denton County. Informs the Contractor of outstanding ROW and utilities. One-Time Use.
SP000-3051  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1201-02-021 in Williamson County. As of August 14, 2014, Right of Way within the project limits have not been acquired and Utilities within the project limits have not been cleared. One-Time Use.
SP000-3050  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0070-06-047 in McCulloch County. As of August 13, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3049  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1754-02-019 in Hays County. As of August 12, 2014, utilities and right of way within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3048  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0917-31-015 in Madison County. As of August 8, 2014, utilities and right of way within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3047  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0009-12-072 in Rockwall County. As of August 12, 2014, right of way and utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3046  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0786-01-080 in Jefferson County. Informs the Contrator of outstanding utilities. One-Time Use.
SP000-3045  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1310-03-025 in Wise County. The Contractor’s attention is directed to the fact that as of July 31, 2014, there are various types of utilities which are expected to be relocated, adjusted, or installed by the dates set out below. One-Time Use.
SP000-3044  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1138-02-015 in Cameron County. As of August 1, 2014, utilities, right of way, and encroachments within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3043  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0027-12-097 in Fort Bend County. Informs the Contractor of outstanding utilities, right of way, encroachments, and relocations. One-Time Use.
SP000-3042  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0500-03-572 in Harris County. As of July 23, 2014, utilities, right of way, encroachments, and relocations within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3041  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1186-01-087 in Travis County. As of July 01, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3040  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 2121-01-088 in El Paso County. The Contractor’s attention is directed to the fact that all utilities have been adjusted in accordance with the appropriate directives covering the adjustments of utilities, except those listed below. One-Time Use.
SP000-3039  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0118-10-055 in San Augustine County. As of July 18, 2014 utilities and encroachments within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3038  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0176-02-094 in Angelina County. As of July 17, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3037  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0336-01-046 in Houston County. As of July 17, 2014 right of way within the project limits has not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3036  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 7107-09-008 in Irion, Reagan, Tom Green, Upton Counties. For this project, Item 000, “Important Notice to Contractors,” of the Standard Specifications, is hereby amended with respect to the clauses cited below, and no other clauses or requirements of this Item are waived or changed hereby. One-Time Use.
SP000-3035  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0903-00-075 in Wichita County. As of July 18th, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3034  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0197-02-108 in Dallas County. As of July 15, 2014, Right of Way and utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3033  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0382-03-031 in Limestone County. As of July 15, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners. One-Time Use.
SP000-3032  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 2687-02-018 in Burnet County. Informs the Contractor of outstanding utilities. One-Time Use.
SP000-3031  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0198-01-023 in Henderson County. Informs the contractor of outstanding utilities. One-Time Use.
SP000-3030  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1012-03-017 in Dallas County. As of July 7, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3029  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0516-01-015 in Karnes County. As of June 26, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3028  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0220-03-028 in Cameron County. As of July 1, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3027  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0027-12-097 in Fort Bend County. As of August 1, 2014, utilities, right of way, encroachments, and relocations within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3026  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1549-03-017 in San Patricio County. As of June 12, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3025  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0197-02-108 in Dallas County. The contractor’s attention is directed to the fact that there are experience requirements associated with the Traffic Management System (TMS) items contained on this project. One-Time Use.
SP000-3024  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0086-14-046 in Webb County. As of June 2014 utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3023  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 2121-04-093 in El Paso County. As of June 2014 utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3022  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 2681-01-012 in Denton County. Informs the Contractor of outstanding utilities. One-Time Use.
SP000-3021  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0200-10-079 in Hardin County. As of June 26, 2014 utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3020  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1978-01-050 in Tarrant County. The Contractor’s attention is directed to the fact that as of June 18, 2014, there are various types of utilities which are expected to be relocated, adjusted, or installed by the dates set out below. One-Time Use.
SP000-3019  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0203-03-044 in Rains County. As of June 9, 2014 utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3018  PDF  RTF  DESCRIPTION OF PROJECT, SCOPE OF CONTRACT, SEQUENCE OF WORK - For project 1400-04-011 in Montgomery County. This project involves reconstruction of FM 1774 from 0.045 MI south of W. Lost Creek Blvd. to FM 149 in Montgomery County as part of the FM 1774 Improvement Program. One-Time Use.
SP000-3017  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0242-01-025 in Liberty County. As of June 6, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3016  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0151-01-042 in Burnet County. As of June 13, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3015  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1400-04-011 in Montgomery County. As of June 12, 2014, utilities and right of way within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3014  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0265-05-071 in Bastrop County. As of June 11, 2014 utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3013  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1365-03-026 in Coleman County. As of June 12, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3012  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 2105-01-020 in Fort Bend County. As of June 9, 2014 utilities, right of way, and relocations within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3011  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0353-05-088 in Dallas County. As of June 11, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3010  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0643-04-028 in Grimes County. Informs the Contractor of outstanding utilities. One-Time Use.
SP000-3009  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1392-01-035 in Collin County. As of June 10, 2014, right- of- way and utilities within the project limits has not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3008  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0500-03-044 in Harris County. As of July 1, 2014, utilities, right of way, encroachments, and relocations within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3007  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0047-03-075 in Grayson County. As of June 9, 2014 utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3006  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0913-20-085 in Austin County. As of June 9, 2014, right of way within the project limits has not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3005  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 2211-02-017 in Williamson County. As of May 30, 2014 utilities and right-of-way within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3004  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 3136-01-174 in Travis County. As of JUNE 2, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-3003  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0250-02-039 in Palo Pinto County. The Contractor’s attention is directed to the fact that as of June 4, 2014, there are various parcels that have not been acquired, but will be acquired by the dates set out below. One-Time Use.
SP000-3002  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1599-02-014 in Johnson County. The Contractor’s attention is directed to the fact that as of June 4, 2014, there are various types of utilities which are expected to be relocated, adjusted, or installed by the dates set out below. One-Time Use.
SP000-3001  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0902-40-025 in Jack County. The Contractor’s attention is directed to the fact that as of June 4, 2014, there are various parcels that have not been acquired, but will be acquired by the dates set out below. One-Time Use.
SP000-3000  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0902-20-100 in Wise County. The Contractor’s attention is directed to the fact that as of June 4, 2014, there are various types of utilities which are expected to be relocated, adjusted, or installed by the dates set out below. One-Time Use.
SP000-2999  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0902-20-108 in Wise County. The Contractor’s attention is directed to the fact that as of June 4, 2014, there are various parcels that have not been acquired, but will be acquired by the dates set out below. One-Time Use.
SP000-2998  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0909-22-162 in McLennan County. The Contractor’s attention is directed to the fact that the right-of-way parcels listed below have not been acquired as of May 30, 2014. One-Time Use.
SP000-2997  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 2243-01-009 in Cameron County. As of June 3, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-2996  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0072-07-059 in Bexar County. As of May 21, 2014, utilities and encroachments within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-2995  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 3187-01-005 in Harris County. As of May 23, 2014, utilities and right of way within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-2994  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0200-11-103 in Jefferson County. As of May 29, 2014, utilities and right of way encroachments within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-2993  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0902-48-742 in Tarrant County. Informs the Contractor of outstanding utilities. One-Time Use.
SP000-2992  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 3158-01-031 in Montgomery County. Informs the Contractor of outstanding utilities and ROW. One-Time Use.
SP000-2990  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0912-31-263 in Brazoria County. Informs the Contractor of outstanding utilities. One-Time Use.
SP000-2989  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1706-01-025 in Walker County. As of May 16, 2014 certain utilities within the project limits have not been cleared. Unless otherwise stated, clearance of these obstructions will be performed by their owners. One-Time Use.
SP000-2988  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 1706-01-025 in Walker County. The Contractor’s attention is directed to the fact that Project STP 2014(993)HES is located within the boundary of the Sam Houston National Forest. One-Time Use.
SP000-2987  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0863-01-047 in Hidalgo County. As of May 19th, 2014, utilities, right of way acquisitions, and relocations within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-2986  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0138-15-010 in Gregg County. As of May 19, 2014, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-2985  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0050-06-080 in Harris County. Informs the Contractor of outstanding utilities, right of way, relocations and ROW improvements. One-Time Use.
SP000-2984  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0176-01-094 in Nacogdoches County. As of May 16, 2014, utilities, right of way, and relocations within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-2983  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0212-04-033 in Grimes County. As of May 16, 2014, utilities, right of way, relocation assistance and encroachments within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-2982  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0920-02-087 in Liberty County. The Contractor’s attention is directed to the fact that all utility adjustments have not yet been completed as of May 15, 2014. One-Time Use.
SP000-2981  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 3148-01-006 in Dallas County. As of May 16, 2014, ROW and utilities within the project limits has not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-2980  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0912-71-894 in Harris County. As of May 14, 2014, utilities and right of way within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. One-Time Use.
SP000-2979  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0912-71-003 in Harris County. As of May 9, 2014, right of way, encroachments, and relocations within the project limits have been cleared except utilities. The Department anticipates clearance of existing utilities by the dates listed below. One-Time Use.

Pages in Groups of 100:  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30 

2004 English Special Provisions by Item (All)
Specification Information
Search For a Special Provision or Specification
 
spacer spacer
Disclaimer | Accessibility Policy | Privacy and Security Policy | Open Records | TxDOT Contacts