| Tyler | Anderson | US 79 | 020507043 | $50,060,496.69 | 2012-09 | CONSTRUCT NEW ROADWAY LANES |
| Odessa | Andrews | SH 115 | 054801039 | $1,880,032.43 | 2012-08 | REBUILD ROADWAY |
| San Antonio | Atascosa | FM 2504 | 173802013 | $6,252,270.69 | 2012-06 | REBUILD ROADWAY |
| Yoakum | Austin | SH 36 | 018702064 | $12,829,711.08 | 2012-08 | WIDEN AND REHABILITATE ROADWAY |
| Austin | Bastrop | US 290 | 011406030 | $26,217,950.06 | 2013-08 | WIDEN AND REHABILITATE ROADWAY |
| Wichita Falls | Baylor | US 277 | 015606039 | $11,125,231.36 | 2012-06 | CONSTRUCT NEW ROADWAY LANES |
| Wichita Falls | Baylor | FM 422 | 081401027 | $3,405,465.47 | 2012-07 | REBUILD ROADWAY |
| Waco | Bell | IH 35 | 001514091 | $277,124,516.13 | 2012-09 | CONSTRUCT NEW ROADWAY LANES |
| Waco | Bell | US 190 | 023103107 | $65,825,914.30 | 2012-10 | CONSTRUCT NEW ROADWAY LANES |
| San Antonio | Bexar | IH 35 | 001710261 | $79,252,283.05 | 2013-07 | CONSTRUCT NEW ROADWAY LANES |
| San Antonio | Bexar | IH 10 | 002502194 | $13,877,751.79 | 2013-04 | REPAIR ROADWAY |
| San Antonio | Bexar | IH 10 | 007207060 | $7,561,174.00 | 2013-06 | REPLACE BRIDGE |
| San Antonio | Bexar | SP 536 | 025306035 | $2,327,112.77 | 2013-06 | CONSTRUCT CENTER TURN LANES |
| San Antonio | Bexar | IH 410 | 052105122 | $1,751,937.53 | 2012-08 | CONSTRUCT FREEWAY RAMPS |
| San Antonio | Bexar | LP 1604 | 245202082 | $3,348,708.11 | 2012-07 | CONSTRUCT BRIDGE |
| Austin | Blanco | US 281 | 025302030 | $7,010,096.80 | 2013-08 | WIDEN ROADWAY |
| Atlanta | Bowie | US 259 | 008504034 | $4,543,323.86 | 2012-07 | WIDEN ROADWAY |
| Atlanta | Bowie | FM 2240 | 287902013 | $2,067,780.50 | 2012-06 | WIDEN ROADWAY |
| Houston | Brazoria | BS 288B | 011109041 | $497,713.30 | 2013-07 | INSTALL PAVEMENT STRIPES/MARKERS |
| Houston | Brazoria | CS | 091231270 | $5,113,493.00 | 2013-08 | CONSTRUCT NEW ROAD |
| Bryan | Brazos | SH 6 | 004912086 | $4,796,576.21 | 2013-07 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| Bryan | Brazos | SH 21 | 011702028 | $17,738,489.72 | 2012-08 | WIDEN ROADWAY |
| Pharr | Brooks | US 281 | 025505034 | $14,728,070.98 | 2012-08 | CONSTRUCT OVERPASS/UNDERPASS |
| Brownwood | Brown | US 84 | 005407067 | $4,775,845.27 | 2012-06 | REPAIR ROADWAY |
| Brownwood | Brown | CS | 092306061 | $752,109.82 | 2012-06 | CONSTRUCT NEW ROAD |
| Brownwood | Brown | CS | 092306062 | $1,673,872.64 | 2013-06 | CONSTRUCT NEW ROAD |
| Bryan | Burleson | FM 60 | 064803050 | $9,058,140.00 | 2013-08 | CONSTRUCT NEW ROADWAY LANES |
| Austin | Caldwell | US 183 | 015202070 | $12,945,439.04 | 2013-08 | WIDEN AND REHABILITATE ROADWAY |
| Pharr | Cameron | US 77 | 032708083 | $7,103,549.02 | 2012-08 | CONSTRUCT FRONTAGE ROADS |
| Pharr | Cameron | CS | 092106212 | $1,711,260.66 | 2012-06 | WIDEN ROADWAY |
| Atlanta | Camp | SH 11 | 008307040 | $325,808.37 | 2013-05 | INSTALL LEFT TURN LANE AT INTERSECTION |
| Atlanta | Cass | US 59 | 021804110 | $425,508.13 | 2012-07 | INSTALL LEFT TURN LANE AT INTERSECTION |
| Wichita Falls | Clay | US 82 | 004403047 | $6,352,304.21 | 2013-05 | WIDEN AND REHABILITATE ROADWAY |
| Dallas | Collin | US 75 | 004714068 | $80,075,049.24 | 2012-08 | CONSTRUCT NEW ROADWAY LANES |
| Dallas | Collin | SH 289 | 009103021 | $19,472,522.15 | 2012-06 | CONSTRUCT NEW ROADWAY LANES |
| Childress | Collingsworth | SH 203 | 023001018 | $4,607,501.98 | 2012-08 | REPAIR BRIDGE |
| San Antonio | Comal | BS 46-C | 001610022 | $11,185,044.64 | 2012-08 | WIDEN ROADWAY |
| San Antonio | Comal | BS 46-C | 021502048 | $10,525,500.00 | 2013-08 | WIDEN AND REHABILITATE ROADWAY |
| San Antonio | Comal | US 281 | 025303068 | $3,530,100.00 | 2013-08 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| San Antonio | Comal | FM 3009 | 310701038 | $1,678,080.84 | 2012-08 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| Childress | Cottle | US 62 | 014602031 | $10,706,456.02 | 2012-07 | RESURFACE ROADWAY |
| Childress | Cottle | FM 1037 | 014608052 | $874,701.17 | 2012-08 | RESURFACE ROADWAY |
| Amarillo | Dallam | US 54 | 023803052 | $7,889,683.08 | 2012-06 | WIDEN AND REHABILITATE ROADWAY |
| Dallas | Dallas | IH 30 | 106804147 | $76,870,042.03 | 2012-12 | CONSTRUCT NEW ROADWAY LANES |
| Lubbock | Dawson | US 87 | 006805033 | $13,300,560.59 | 2013-05 | REPAIR ROADWAY |
| Lubbock | Dawson | SH 349 | 038006015 | $20,447,473.20 | 2013-08 | WIDEN ROADWAY |
| Paris | Delta | SH 24 | 013603044 | $42,401,013.32 | 2013-08 | CONSTRUCT NEW ROADWAY LANES |
| Dallas | Denton | US 380 | 013409063 | $48,414,608.84 | 2012-07 | CONSTRUCT NEW ROADWAY LANES |
| Dallas | Denton | SH 114 | 035302029 | $36,018,450.67 | 2012-06 | CONSTRUCT NEW ROADWAY LANES |
| Laredo | Dimmit | US 83 | 003706084 | $17,237,602.14 | 2012-08 | WIDEN AND REHABILITATE ROADWAY |
| Pharr | Kenedy | US 77 | 032702050 | $10,622,931.41 | 2012-06 | CONSTRUCT OVERPASS/UNDERPASS |
| Dallas | Ellis | US 67 | 026101037 | $11,983,642.26 | 2012-06 | CONSTRUCT FRONTAGE ROADS |
| El Paso | El Paso | SH 20 | 000201090 | $10,492,219.39 | 2013-08 | REPAIR ROADWAY |
| El Paso | El Paso | US 62 | 037402094 | $5,508,012.26 | 2013-08 | WIDEN ROADWAY |
| El Paso | El Paso | CS | 092406417 | $12,021,938.03 | 2013-05 | REPAIR ROADWAY |
| El Paso | El Paso | IH 10 | 212101085 | $1,565,862.80 | 2012-08 | CONSTRUCT FREEWAY RAMPS |
| El Paso | El Paso | IH 10 | 212104088 | $52,138,322.32 | 2012-10 | CONSTRUCT FREEWAY RAMPS |
| El Paso | El Paso | IH 10 | 212104092 | $25,863,948.74 | 2013-08 | CONSTRUCT FREEWAY RAMPS |
| Fort Worth | Erath | SH 267 | 007908001 | $12,369,759.56 | 2012-08 | CONSTRUCT NEW ROAD |
| Fort Worth | Erath | US 67 | 007908003 | $15,576,226.86 | 2013-08 | |
| Yoakum | Fayette | US 77 | 026901027 | $6,717,690.22 | 2012-07 | WIDEN ROADWAY |
| Houston | Fort Bend | SP 10 | 018705050 | $26,516,286.41 | 2013-08 | CONSTRUCT NEW ROAD |
| Houston | Fort Bend | FM 2234 | 210501045 | $1,049,003.57 | 2012-07 | ENHANCEMENT PROJECT |
| Houston | Fort Bend | FM 2234 | 210501046 | $11,164,921.04 | 2013-07 | WIDEN ROADWAY |
| Houston | Galveston | FM 518 | 097603100 | $2,827,399.20 | 2013-08 | ENHANCEMENT PROJECT |
| Austin | Gillespie | US 290 | 011302060 | $3,387,979.18 | 2013-06 | CONSTRUCT CENTER TURN LANES |
| Paris | Grayson | US 82 | 004519047 | $31,296,565.40 | 2012-08 | WIDEN ROADWAY |
| Paris | Grayson | US 75 | 004718068 | $6,884,811.70 | 2013-08 | WIDEN ROADWAY |
| Tyler | Gregg | FM 349 | 042403024 | $1,430,520.00 | 2013-08 | CONSTRUCT CENTER TURN LANES |
| Tyler | Gregg | SH 42 | 054504046 | $5,364,450.00 | 2013-08 | CONSTRUCT CENTER TURN LANES |
| Tyler | Gregg | FM 2275 | 215801013 | $15,887,600.49 | 2013-08 | CONSTRUCT NEW ROAD |
| San Antonio | Guadalupe | IH 35 | 001606046 | $23,987,020.87 | 2012-08 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| San Antonio | Guadalupe | SH 123 | 036603062 | $13,961,006.37 | 2012-08 | WIDEN ROADWAY |
| Childress | Hall | SH 256 | 054102030 | $879,033.98 | 2012-06 | INSTALL/UPGRADE SAFETY BARRIER |
| Houston | Harris | US 59 | 002713205 | $5,900,700.17 | 2012-06 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| Houston | Harris | US 290 | 005006081 | $97,588,500.00 | 2013-08 | WIDEN ROADWAY |
| Houston | Harris | US 290 | 005006083 | $2,788,631.24 | 2012-07 | CONSTRUCT FRONTAGE ROADS |
| Houston | Harris | US 290 | 005008087 | $175,049,833.50 | 2013-04 | CONSTRUCT NEW ROADWAY LANES |
| Houston | Harris | US 290 | 005009069 | $166,987,126.13 | 2013-05 | CONSTRUCT NEW ROADWAY LANES |
| Houston | Harris | IH 45 | 050003577 | $26,310,456.02 | 2013-02 | INSTALL TRAFFIC MANAGEMENT TECHNOLOGY |
| Houston | Harris | IH 10 | 050801276 | $45,852,959.01 | 2013-08 | REPLACE BRIDGE |
| Houston | Harris | IH 10 | 050801335 | $1,655,895.81 | 2012-10 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| Houston | Harris | SH 288 | 059801094 | $930,774.10 | 2012-08 | CONSTRUCT INT DIRECT CONNECTION RAMP |
| Houston | Harris | CS | 091270064 | $34,597,200.00 | 2013-06 | REPAIR ROADWAY |
| Houston | Harris | CS | 091272293 | $6,001,673.00 | 2013-02 | REPAIR ROADWAY |
| Houston | Harris | FM 865 | 097601019 | $14,689,080.00 | 2013-08 | WIDEN ROADWAY |
| Houston | Harris | FM 529 | 100601068 | $1,827,903.05 | 2012-08 | ENHANCEMENT PROJECT |
| Houston | Harris | BF1960A | 168507019 | $11,897,386.84 | 2013-08 | RESURFACE ROADWAY |
| Houston | Harris | FM 2920 | 294101022 | $4,187,656.56 | 2012-07 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| Houston | Harris | BW 8 | 325602040 | $13,357,578.20 | 2012-08 | WIDEN BRIDGE |
| Atlanta | Harrison | US 80 | 009607042 | $391,653.36 | 2012-07 | INSTALL LEFT TURN LANE AT INTERSECTION |
| Atlanta | Harrison | IH 20 | 049510082 | $7,262,302.21 | 2012-06 | RESURFACE ROADWAY |
| Amarillo | Hartley | US 87 | 042501019 | $24,285,068.35 | 2012-08 | WIDEN AND REHABILITATE ROADWAY |
| Austin | Hays | IH 35 | 001602133 | $14,775,684.00 | 2013-08 | WIDEN BRIDGE |
| Austin | Hays | SH 80 | 028601053 | $5,522,738.74 | 2013-08 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| Austin | Hays | RM 12 | 068303032 | $847,642.88 | 2012-12 | WIDEN AND REHABILITATE ROADWAY |
| Austin | Hays | FM 2439 | 229301023 | $2,303,043.51 | 2013-08 | CONSTRUCT CENTER TURN LANES |
| Austin | Hays | FM 2439 | 229301024 | $6,189,636.58 | 2013-08 | CONSTRUCT CENTER TURN LANES |
| Tyler | Henderson | SH 19 | 010805014 | $7,799,962.58 | 2012-08 | WIDEN ROADWAY |
| Pharr | Hidalgo | BU 83-S | 003904095 | $15,705,096.30 | 2012-07 | WIDEN ROADWAY |
| Pharr | Hidalgo | US 83 | 003917176 | $40,907,224.10 | 2013-07 | WIDEN BRIDGE |
| Pharr | Hidalgo | US 281 | 025507128 | $22,734,338.25 | 2012-08 | REBUILD ROADWAY |
| Pharr | Hidalgo | FM 681 | 066901043 | $20,172,687.98 | 2013-06 | WIDEN ROADWAY |
| Waco | Hill | FM 933 | 119001035 | $8,564,851.78 | 2013-02 | CONSTRUCT NEW ROADWAY LANES |
| Abilene | Howard | IH 20 | 000505102 | $22,612,237.72 | 2013-05 | CONSTRUCT INTERCHANGE |
| Abilene | Howard | VA | 090812019 | $64,948,084.12 | 2013-08 | CONSTRUCT NEW ROAD |
| El Paso | Hudspeth | IH 10 | 000207043 | $5,808,783.02 | 2012-07 | REPAIR BRIDGE |
| El Paso | Hudspeth | RM 1111 | 128203007 | $2,089,581.11 | 2013-07 | CONSTRUCT SIDEWALK |
| Paris | Hunt | SH 276 | 064101033 | $48,309,665.12 | 2012-07 | REPLACE BRIDGE |
| Beaumont | Jefferson | US 69 | 020011100 | $24,658,142.08 | 2013-07 | CONSTRUCT FREEWAY RAMPS |
| Corpus Christi | Karnes | US 181 | 010006059 | $10,729,611.22 | 2012-12 | CONSTRUCT NEW ROADWAY LANES |
| San Antonio | Kendall | US 87 | 007214024 | $991,445.44 | 2012-07 | REPAIR BRIDGE |
| San Antonio | Kerr | SH 39 | 019302031 | $8,577,610.10 | 2012-08 | REBUILD ROADWAY |
| Childress | King | US 82 | 013301043 | $11,453,315.33 | 2012-06 | RESURFACE ROADWAY |
| Corpus Christi | Kleberg | US 77 | 010204095 | $16,956,436.65 | 2012-04 | CONSTRUCT OVERPASS/UNDERPASS |
| Childress | Knox | SH 6 | 009805026 | $4,574,174.74 | 2012-08 | REPLACE BRIDGE |
| Brownwood | Lampasas | US 183 | 027206036 | $3,206,317.91 | 2012-06 | WIDEN ROADWAY |
| Brownwood | Lampasas | FM 2657 | 278601010 | $7,499,751.71 | 2012-06 | CONSTRUCT NEW ROADWAY LANES |
| Yoakum | Lavaca | US 77 | 037001033 | $10,666,766.43 | 2012-07 | WIDEN ROADWAY |
| Beaumont | Liberty | US 90 | 002805042 | $20,262,553.33 | 2013-06 | CONSTRUCT NEW ROADWAY LANES |
| Amarillo | Lipscomb | SH 23 | 133701022 | $5,725,928.08 | 2012-07 | WIDEN AND REHABILITATE ROADWAY |
| Lubbock | Lubbock | US 87 | 006801066 | $11,678,816.14 | 2013-07 | CONSTRUCT INTERCHANGE |
| Lubbock | Lubbock | LP 289 | 078302084 | $27,572,850.44 | 2012-07 | CONSTRUCT NEW ROADWAY LANES |
| Odessa | Martin | SH 349 | 038007024 | $6,788,801.45 | 2012-09 | WIDEN AND REHABILITATE ROADWAY |
| Odessa | Martin | SH 349 | 038008020 | $18,063,016.32 | 2012-09 | WIDEN AND REHABILITATE ROADWAY |
| Laredo | Maverick | US 277 | 030001081 | $14,586,224.20 | 2013-06 | WIDEN AND REHABILITATE ROADWAY |
| Waco | McLennan | IH 35 | 001501229 | $25,244,853.90 | 2013-07 | CONSTRUCT FRONTAGE ROADS |
| Waco | McLennan | LP 574 | 004910003 | $14,425,266.44 | 2013-02 | CONSTRUCT NEW ROADWAY LANES |
| Waco | McLennan | FM 1695 | 250601035 | $2,598,531.24 | 2012-06 | WIDEN AND REHABILITATE ROADWAY |
| San Antonio | Medina | IH 35 | 001705092 | $1,953,510.34 | 2013-07 | CONSTRUCT FREEWAY RAMPS |
| Odessa | Midland | IH 20 | 000514077 | $12,874,789.61 | 2012-06 | REPAIR ROADWAY |
| Brownwood | Mills | US 84 | 005408026 | $3,006,139.79 | 2012-06 | WIDEN ROADWAY |
| Houston | Montgomery | FM 1488 | 052310034 | $36,889,615.11 | 2013-07 | CONSTRUCT OVERPASS/UNDERPASS |
| Houston | Montgomery | FM 3083 | 315801035 | $3,471,800.21 | 2013-07 | CONSTRUCT NEW ROADWAY LANES |
| Atlanta | Morris | SH 77 | 027701028 | $3,269,333.48 | 2012-08 | WIDEN ROADWAY |
| Childress | Motley | FM 94 | 070405020 | $4,790,520.35 | 2012-08 | WIDEN ROADWAY |
| Lufkin | Nacogdoches | SH 21 | 011808060 | $10,579,330.63 | 2012-07 | WIDEN ROADWAY |
| Lufkin | Nacogdoches | SH 7 | 055303022 | $7,051,201.84 | 2012-08 | WIDEN ROADWAY |
| Dallas | Navarro | SH 14 | 009302015 | $10,033,267.21 | 2013-08 | CONSTRUCT OVERPASS/UNDERPASS |
| Corpus Christi | Nueces | US 77 | 010202095 | $13,627,381.56 | 2012-07 | CONSTRUCT NEW ROADWAY LANES |
| Corpus Christi | Nueces | US 77 | 010202096 | $36,691,688.16 | 2013-07 | CONSTRUCT OVERPASS/UNDERPASS |
| Corpus Christi | Nueces | SH 361 | 226303029 | $14,547,680.00 | 2013-08 | CONSTRUCT NEW ROADWAY LANES |
| Corpus Christi | Nueces | FM 2444 | 234301036 | $23,464,000.00 | 2013-08 | CONSTRUCT NEW ROADWAY LANES |
| Beaumont | Orange | IH 10 | 002814109 | $76,421,310.05 | 2013-07 | REPLACE BRIDGE |
| Atlanta | Panola | SH 149 | 006311055 | $1,814,272.55 | 2013-06 | INSTALL LEFT TURN LANE AT INTERSECTION |
| Fort Worth | Parker | IH 30 | 106805009 | $16,931,169.02 | 2013-04 | CONSTRUCT INTERCHANGE |
| Fort Worth | Parker | FM 1884 | 160102023 | $7,635,538.86 | 2012-08 | WIDEN ROADWAY |
| Lufkin | Polk | US 287 | 034103036 | $5,901,528.62 | 2012-06 | REBUILD ROADWAY |
| Amarillo | Randall | LP 335 | 263502022 | $39,380,351.54 | 2013-08 | WIDEN ROADWAY |
| Dallas | Rockwall | IH 30 | 000912078 | $34,501,209.42 | 2013-07 | CONSTRUCT OVERPASS/UNDERPASS |
| Dallas | Rockwall | FM 740 | 101403049 | $16,303,979.65 | 2013-08 | WIDEN ROADWAY |
| Tyler | Rusk | SH 64 | 024508040 | $1,549,730.00 | 2013-08 | WIDEN ROADWAY |
| Lufkin | San Jacinto | US 59 | 017702089 | $10,164,508.70 | 2013-08 | CONSTRUCT FRONTAGE ROADS |
| San Angelo | Schleicher | US 277 | 015904034 | $8,688,555.50 | 2012-07 | CONSTRUCT MERGE LANES |
| Lufkin | Shelby | US 84 | 017502083 | $6,345,873.87 | 2012-08 | REBUILD ROADWAY |
| Tyler | Smith | SH 31 | 042401045 | $3,594,605.89 | 2013-08 | WIDEN ROADWAY |
| Tyler | Smith | LP 323 | 207502045 | $7,663,690.00 | 2013-08 | REPLACE BRIDGE |
| Fort Worth | Tarrant | US 377 | 008007085 | $18,955,141.32 | 2012-07 | WIDEN ROADWAY |
| Abilene | Taylor | IH 20 | 000606093 | $14,283,972.24 | 2012-06 | CONSTRUCT FREEWAY RAMPS |
| Atlanta | Titus | SH 11 | 008309030 | $239,785.52 | 2013-06 | INSTALL LEFT TURN LANE AT INTERSECTION |
| Atlanta | Titus | FM 1402 | 138401021 | $1,665,045.01 | 2013-08 | CONSTRUCT CENTER TURN LANES |
| San Angelo | Tom Green | US 67 | 015802062 | $6,481,803.56 | 2012-08 | REPLACE BRIDGE |
| San Angelo | Tom Green | US 277 | 015901039 | $2,913,924.73 | 2012-07 | CONSTRUCT MERGE LANES |
| San Angelo | Tom Green | US 277 | 015902072 | $6,781,063.95 | 2012-07 | CONSTRUCT MERGE LANES |
| San Angelo | Tom Green | FM 388 | 228401028 | $2,216,273.62 | 2013-07 | CONSTRUCT NEW ROADWAY LANES |
| Austin | Travis | IH 35 | 001513362 | $3,414,230.32 | 2013-08 | CONSTRUCT NEW ROAD |
| Austin | Travis | US 290 | 011402096 | $2,281,418.07 | 2013-08 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| Austin | Travis | SH 71 | 070003123 | $9,562,374.61 | 2013-08 | CONSTRUCT CENTER TURN LANES |
| Austin | Travis | SH 71 | 070003125 | $13,736,316.05 | 2013-08 | CONSTRUCT CENTER TURN LANES |
| Austin | Travis | LP 1 | 313601172 | $5,047,811.64 | 2013-08 | CONSTRUCT BICYCLE/PEDESTRIAN BRIDGE |
| Austin | Travis | FM 734 | 341703017 | $1,744,385.55 | 2013-04 | INSTALL LEFT TURN LANE AT INTERSECTION |
| Atlanta | Upshur | US 271 | 024805053 | $2,129,350.98 | 2013-07 | CONSTRUCT CENTER TURN LANES |
| Atlanta | Upshur | SH 154 | 040202024 | $1,153,701.07 | 2013-08 | WIDEN ROADWAY |
| Atlanta | Upshur | SH 155 | 052002037 | $22,058,868.04 | 2013-07 | REPLACE BRIDGE |
| San Antonio | Uvalde | SH 55 | 023505030 | $3,024,252.14 | 2013-07 | INSTALL/UPGRADE DRAINAGE STRUCTURES |
| Tyler | Van Zandt | SH 64 | 024519022 | $8,260,119.35 | 2012-08 | WIDEN ROADWAY |
| Yoakum | Victoria | BU 59-T | 008919009 | $471,680.00 | 2013-08 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| Yoakum | Victoria | LP 463 | 235001052 | $15,584,607.01 | 2013-06 | CONSTRUCT OVERPASS/UNDERPASS |
| Bryan | Walker | SH 75 | 016608043 | $8,095,399.83 | 2013-05 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| Bryan | Washington | SH 36 | 018606077 | $4,591,329.10 | 2013-07 | REBUILD ROADWAY |
| Laredo | Webb | SL 20 | 008616004 | $11,108,336.60 | 2012-08 | WIDEN ROADWAY |
| Wichita Falls | Wichita | US 82 | 004401094 | $2,618,869.40 | 2012-06 | REPLACE BRIDGE |
| Wichita Falls | Wichita | SH 79 | 028306022 | $427,760.88 | 2013-05 | CONSTRUCT CENTER TURN LANES |
| Wichita Falls | Wilbarger | FM 3207 | 331701005 | $3,606,112.87 | 2012-08 | WIDEN AND REHABILITATE ROADWAY |
| Austin | Williamson | US 183 | 015105097 | $651,130.31 | 2013-08 | WIDEN ROADWAY |
| Austin | Williamson | FM 685 | 075701020 | $14,917,560.10 | 2013-08 | WIDEN AND REHABILITATE ROADWAY |
| Austin | Williamson | RM 1431 | 137802039 | $4,872,300.47 | 2013-08 | CONSTRUCT INTERSECTION IMPROVEMENTS |
| San Antonio | Wilson | US 87 | 014303042 | $6,605,163.59 | 2012-07 | WIDEN ROADWAY |
| Fort Worth | Wise | US 81 | 001308127 | $16,848,298.21 | 2013-08 | CONSTRUCT OVERPASS/UNDERPASS |
| Tyler | Wood | US 69 | 020305037 | $3,129,753.76 | 2013-06 | WIDEN ROADWAY |
| Pharr | Zapata | US 83 | 003803033 | $12,000,980.86 | 2012-06 | WIDEN AND REHABILITATE ROADWAY |
| Pharr | Zapata | US 83 | 003803034 | $11,066,171.67 | 2013-07 | WIDEN AND REHABILITATE ROADWAY |