2004 English Special Provisions to Item 447 - Structural Bolting (Statewide & Districtwide, Current)
| SP447-002 | RTF | - Limits the time between installation of bolts and final tensioning to 10 days and revises the tolerances for turn-of-the-nut tightening to be in line with national bolt specifications. Required on all projects with Item 447 beginning with the January 2006 letting. Replaces SP447-001 . (Change Memo: de-42-05). Statewide Use. |
| 2004 English Special Provisions by Item (Statewide & Districtwide, Current) | |||
| Specification Information | |||
| Search For a Special Provision or Specification | |||