2004 English Special Provisions to Item 361 - Full-Depth Repair of Concrete Pavement (Statewide & Districtwide, Current)
| SP361-001 |
PDF |
RTF |
- Adds appropriate references, allows more hot-mix or plastic bond breaker and allows the Engineer to waive temperature limits, if additional curing is performed. Required on all projects with Item 361 beginning with the May 2006 letting.
(Change Memo: de-05-06). Statewide Use.
|
|
| |
PARIS - DISTRICT 1 |
| SP361-009 |
PDF |
RTF |
- Specifies sizes of drilling holes and epoxy application.
Districtwide Use.
|