2004 English Special Provisions to Item 432 - Riprap (All)
|
SP432-007 |
PDF |
RTF |
- For project 3622-01-001 in Cameron County. Provides for stones with a 50 lb maximum weight and a 3 lb minimum weight.
One-Time Use.
|
SP432-006 |
PDF |
RTF |
- For project 6179-02-001 in Jefferson County. Article 432.2. Material is amended by the following: Protection. Use boulders or quarried rock that meets the following gradation requirements:
One-Time Use.
|
SP432-005 |
PDF |
RTF |
- For project 6127-48-001 in Jefferson County. Use boulders or quarried rock that meets the gradation requirements of Table 1. Both the width and the thickness of each piece of riprap must be at least 1/3 the length.
One-Time Use.
|
SP432-004 |
PDF |
RTF |
- For project 6127-48-001 in Jefferson County. Use boulders or quarried rock that meets the gradation requirements of Table 1. Both the width and the thickness of each piece of riprap must be at least 1/3 the length.
One-Time Use.
|
SP432-003 |
PDF |
RTF |
- For project 6127-50-001 in Jefferson County. Replaced Table 1 for stone riprap protection.
One-Time Use.
|
SP432-002 |
PDF |
RTF |
- For project 6118-50-001, 6120-84-001, 6125-33-001 in Bexar County. Allows mow strip to be measured by the linear foot.
One-Time Use.
|
SP432-001 |
PDF |
RTF |
- For project 0209-07-031 in McLennan County. Pays for mow strip by the foot.
One-Time Use.
|