2004 English Special Provisions to Item 360 - Concrete Pavement (All)
|
| SP360-011 |
PDF |
RTF |
- For project 0050-06-082, 0050-08-086, 0050-08-087, 0050-09-069, 0050-09-070, 0050-09-071, 0271-14-228, 0500-03-042 in Harris County. Provides for longitudinal tining.
One-Time Use.
|
| SP360-010 |
PDF |
RTF |
- For project 6202-18-001 in Irion County. Provides for saw cutting to be measured and paid for.
One-Time Use.
|
| SP360-009 |
PDF |
RTF |
- For project 6182-92-001 in Grayson County. The SP will be used in conjunction with Item 360 to Overlay 7
One-Time Use.
|
| SP360-007 |
PDF |
RTF |
- Defines that waiving of tining can only be done on facilities with 45 mph or less posted speed. It also added a test to ensure texture of carpet drag when tining is waived. Replaces SP 360---004 beginning with the February 2007 letting.
Replaces SP360-004 . (Change Memo: de-47-06). Statewide Use.
|
| SP360-006 |
PDF |
RTF |
- For project 0346-11-007 in DeWitt County. For Thin Bonded Concrete Overlay, provide hydraulic cement concrete with classification and mix design conforming to Class, COS, concrete as defined in Item 421, Hydraulic Cement Concrete, and as shown on the plans.
One-Time Use.
|
| SP360-004 |
PDF |
RTF |
- Includes the requirements of 360---003 and provides for final texturing of concrete surfaces. May be used at the districts option in place of 360---003.
Replaces SP360-001 .Replaced by SP360-007 . (Change Memo: de-06-06). Statewide Use.
|
| SP360-003 |
PDF |
RTF |
- Clarifies the curing and surface moisture issues. Required on all projects with Item 360 beginning with the May 2006 letting.
(Change Memo: de-06-06). Statewide Use.
|
| SP360-002 |
PDF |
RTF |
- Improve performance and quality of thin bonded concrete overlay.
Districtwide Use. Houston District.
|
| SP360-001 |
PDF |
RTF |
- Provide for final texturing of concrete surfaces.
Replaced by SP360-004 . (Change Memo: de-66-04). Statewide Use.
|