2004 English Special Provisions to Item 265 - Fly Ash or Lime-Fly Ash Treatment (Road-Mixed) (All)
|
SP265-003 |
PDF |
RTF |
- Changes the sampling and testing requirements for Table 1 to say the Engineer may sample the mixture and test. Required for all projects using Item 265 beginning with the January 2012 letting.
Replaces SP265-002 . (Change Memo: de-02-12). Statewide Use.
|
SP265-002 |
PDF |
RTF |
- Supplements Article 265.4.C.1.b, Slurry Placement, when using quicklime to make commercial lime slurry use 80% of the amount shown. Required on all projects with Item 265 beginning with the March 2010 letting.
Replaces SP265-001 .Replaced by SP265-003 . (Change Memo: de-52-09). Statewide Use.
|
SP265-001 |
PDF |
RTF |
- Adds carbide lime slurry as another acceptable type of lime. Required on all projects with Item 265 beginning with the June 2006 letting.
Replaced by SP265-002 . (Change Memo: de-13-06). Statewide Use.
|