Search Results


2004

Special Provisions
SP001-011  PDF  RTF  Definiton of Terms - Adds terms needed as a result of the Electronic Bidding System (EBS). Required on all projects (maintenance and construction) beginning with the April 2009 letting. Replaces SP001-005 .Replaced by SP001-015 . (Change Memo: de-11-09). Statewide Use.

Search
Specification Information