SP429-008  PDF  RTF  Concrete Structure Repair - Modifies 429 to make it work with the new DMS-4655. Slab pay item was set up seperately from horizontal repairs so we can track bridge deck costs in new bridge management system. All bridge deck work will now be done using Item 429. Required on all projects with Item 429 beginning with the March 2009 letting. The use of this special provision prior to March 2009 letting is at the option of the district. Replaces SP429-006 . (Change Memo: de-33-08). Statewide Use.