Search Results


2004

Special Provisions
SP006-029  PDF  RTF  Control of Materials - Informs the Contractor the TxDOT will abate lead or asbestos separately from the prime contract. It also covers painting projects where the primary work is to remove lead paint and repaint a structure. Required on all projects beginning with the March 2007 letting except when SP 006---028 is used. Replaces SP006-023 .Replaced by SP006-030 . (Change Memo: de-48-06). Statewide Use.

Search
Specification Information